Show Job Controls
Bid Cobra

MADISON FM 978 (0552-02-027)

Items: 60

County: MADISON
Length: N/A
Highway: FM 978
District: BRYAN
Control Number: 0552-02-027
DBE Goal: N/A
Project: BR 2023(771)
Guaranty: N/A
Time: 187 WORKING DAYS
Engineer's Estimate: $3,107,465.05
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
DELMY REYES
MATT HENSARLING
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$3,107,465.05
$2,875,306.35
Over/Under Est: -7.47% -$232,158.70
$3,120,259.79
Over/Under Est: 0.41% $12,794.74
Amt Left: 8.52% $244,953.44
Over/Under Est: 2.78% $86,363.01
Amt Left: 11.08% $318,521.71
Delta: -2.36% -$73,568.27
Over/Under Est: 6.47% $201,063.04
Amt Left: 15.07% $433,221.74
Delta: -3.59% -$114,700.03
Over/Under Est: 10.49% $325,914.70
Amt Left: 19.41% $558,073.40
Delta: -3.77% -$124,851.66
Subcontractor Percentage Amount
LARRY YOUNG PAVING, INC. 2.66% $76,969.13
TRAFFIC SIGNS & LINES, LLC 2.26% $65,394.83
HERMANOS STEEL, LLC 1.55% $44,850.43
PROFESSIONAL TRAFFIC CONTROL LLC 0.31% $8,970.09
PENHALL COMPANY 0.30% $8,680.73
SOUTHWEST ENVIRONMENT SERVICES LLC 0.17% $4,919.08
Total: 7.25% $209,784.29

Bid Items & Bid Tabulations

60 Total 0 of 60
MADISON  |  FM 978  |  BRYAN  |  0552-02-027  |  06/01/2023  |  $3,107,465.05  |  BR 2023(771)  |  BRIDGE REPL  |  187 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
R CONSTRUCTION CIVIL, LLC
A. L. HELMCAMP, INC.
RAGLE CONSTRUCTION, INC.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 11.000 $3,500.000 $8,000.000 $15,000.000 $29,500.000 $13,175.820 $25,500.000
RMV STAB BASE & ASPH PV (17")
SY 2,933.000 $10.000 $14.500 $16.000 $12.650 $10.950 $12.000
EXCAVATION (ROADWAY)
CY 4,024.000 $25.000 $14.000 $16.000 $21.000 $12.640 $22.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,944.000 $30.000 $7.000 $10.000 $9.000 $29.670 $29.000
FURNISHING AND PLACING TOPSOIL (4")
SY 3,588.000 $4.200 $4.000 $4.000 $3.000 $3.160 $3.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 3,588.000 $1.200 $2.000 $0.790 $2.000 $0.830 $0.750
CELL FBR MLCH SEED(TEMP)(WARM)
SY 1,794.000 $1.000 $3.000 $0.790 $1.000 $0.830 $0.750
CELL FBR MLCH SEED(TEMP)(COOL)
SY 1,794.000 $1.000 $4.000 $0.790 $1.000 $0.830 $0.750
VEGETATIVE WATERING
MG 35.900 $100.000 $41.000 $1.000 $210.000 $41.780 $40.000
FL BS (CMP IN PLC)(TY D GR1-2)(8")
SY 2,261.000 $25.000 $10.000 $31.000 $16.850 $21.410 $30.000
CEMENT
TON 22.000 $256.000 $304.000 $250.000 $250.000 $248.100 $335.000
CEMENT TREAT (SUBGRADE) (8")
SY 2,261.000 $6.250 $5.000 $8.000 $3.650 $3.890 $10.000
ASPH (HFRS-2P)
GAL 550.000 $6.000 $5.000 $9.000 $15.000 $7.630 $20.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 16.000 $180.000 $478.000 $1,100.000 $300.000 $557.870 $700.000
CEM STABIL BKFL
CY 88.000 $210.000 $160.000 $275.000 $162.800 $157.580 $230.000
DRILL SHAFT (36 IN)
LF 1,120.000 $320.000 $335.000 $250.000 $299.450 $333.550 $340.000
CL C CONC (ABUT)
CY 42.200 $1,400.000 $1,383.000 $1,700.000 $962.550 $1,000.380 $1,600.000
CL C CONC (CAP)
CY 114.400 $1,600.000 $1,593.000 $1,900.000 $1,065.550 $1,768.250 $1,850.000
CL C CONC (COLUMN)
CY 33.000 $1,600.000 $3,060.000 $2,300.000 $1,220.300 $1,857.360 $1,800.000
REINF CONC SLAB
SF 19,040.000 $26.000 $22.000 $28.000 $22.250 $28.720 $29.000
APPROACH SLAB
CY 47.400 $760.000 $915.000 $1,100.000 $569.600 $1,012.040 $655.000
PRESTR CONC GIRDER (TX28)
LF 2,222.000 $225.000 $200.000 $195.000 $200.650 $211.470 $210.000
RIPRAP (CONC)(4 IN)
CY 68.000 $625.000 $393.000 $700.000 $575.200 $888.880 $750.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,244.000 $180.000 $240.000 $130.000 $188.000 $199.120 $167.000
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $625.000 $413.000 $650.000 $717.500 $944.440 $760.000
RAIL (TY T223)
LF 1,168.000 $155.000 $91.000 $175.000 $108.350 $140.520 $150.000
ARMOR JOINT (SEALED)
LF 132.000 $145.000 $82.000 $58.000 $100.350 $108.370 $150.000
REMOV STR (BOX CULVERT)
EA 2.000 $10,000.000 $20,000.000 $20,000.000 $54,000.000 $10,603.870 $20,000.000
REMOVE STR (PILING)
LF 175.000 $110.000 $46.000 $35.000 $250.000 $116.890 $33.000
MOBILIZATION
LS 1.000 $310,000.000 $280,000.000 $220,000.000 $325,000.000 $389,018.950 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $4,000.000 $1,500.000 $9,500.000 $11,750.000 $1,490.090 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $37.000 $39.000 $37.000 $39.000 $38.890 $35.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $11.000 $1.500 $10.000 $9.000 $11.110 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 111.000 $35.000 $29.000 $10.000 $45.240 $38.890 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 111.000 $13.000 $1.500 $5.000 $18.000 $13.330 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,036.000 $5.000 $3.800 $3.700 $3.750 $3.890 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,036.000 $1.100 $1.000 $1.000 $1.000 $1.110 $1.000
CONC CURB (TY II)
LF 52.000 $35.000 $18.000 $100.000 $41.000 $39.900 $45.000
MTL W-BEAM GD FEN (TIM POST)
LF 600.000 $28.000 $26.000 $24.000 $23.000 $23.890 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,400.000 $2,150.000 $2,000.000 $1,700.000 $2,333.310 $2,100.000
REMOVE METAL BEAM GUARD FENCE
LF 1,475.000 $5.000 $2.500 $2.500 $2.000 $2.220 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,400.000 $3,325.000 $3,000.000 $2,875.000 $3,166.640 $2,900.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $300.000 $280.000 $260.000 $200.000 $222.220 $200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $790.000 $740.000 $903.000 $750.000 $999.990 $650.000
REMOVE SM RD SN SUP&AM
EA 1.000 $150.000 $125.000 $137.000 $125.000 $166.670 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 10.000 $31.000 $30.000 $20.000 $25.000 $44.380 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $40.000 $30.000 $25.000 $32.000 $38.890 $25.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 113.000 $2.000 $2.000 $0.750 $0.900 $2.220 $2.000
PAVEMENT SEALER 6"
LF 2,400.000 $1.000 $0.500 $0.320 $0.750 $1.110 $0.510
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 2,180.000 $2.000 $1.300 $1.790 $2.000 $2.000 $1.250
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 50.000 $2.000 $2.100 $2.100 $2.500 $3.330 $2.000
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 1,965.000 $2.000 $1.300 $1.790 $2.000 $2.000 $1.250
REFL PAV MRKR TY II-A-A
EA 27.000 $7.500 $9.000 $10.500 $5.000 $11.110 $8.000
PAV SURF PREP FOR MRK (6")
LF 2,400.000 $0.500 $0.100 $0.060 $0.800 $0.560 $0.050
PAV SURF PREP FOR MRK (RPM)
EA 27.000 $1.500 $0.550 $1.050 $1.000 $2.220 $0.500
SP MIXES SP-C SAC-B PG64-22
TON 284.000 $142.000 $179.000 $275.000 $125.000 $139.550 $182.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $450.000 $350.000 $2,500.000 $500.000 $777.120 $300.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,000.000 $5,878.000 $13,000.000 $15,750.000 $15,999.840 $10,000.000
TMA (STATIONARY)
DAY 10.000 $300.000 $301.000 $275.000 $212.000 $584.480 $250.000
TMA (MOBILE OPERATION)
DAY 4.000 $300.000 $560.000 $275.000 $669.000 $922.400 $250.000
Totals: $3,107,465.050 $2,875,306.350 $3,120,259.790 $3,193,828.060 $3,308,528.104 $3,433,379.750