Show Job Controls
Bid Cobra

LUBBOCK 13TH ST (0905-06-121)

Items: 51

County: LUBBOCK
Length: 0.0010 MILES
Highway: 13TH ST
District: LUBBOCK
Control Number: 0905-06-121
DBE Goal: 0.0%
Project: STP 2025(788)VRUG
Guaranty: $8,000.00
Time: 37 WORKING DAYS
Engineer's Estimate: $376,554.75
Date: 1:00 PM JULY 01, 2026 (in 21 days)
Contract Number: 7263032
Type: TRAFFIC SIGNAL IMPROVEMENTS
Project ID: A00184345
Contract Type: Federal
Project Description: IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
MIKE STROOPE
LUBBOCK 13TH ST (0905-06-121)
Project Name: N/A
Project: STP 2025(788)VRUG
Length: 0.0010 MILES
Project Type: CONSTRUCTION
Limits From: INTERSECTION OF 13TH ST
Limits To: AND SLIDE ROAD
Project Description: IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

51 Total 0 of 51
LUBBOCK  |  13TH ST  |  LUBBOCK  |  0905-06-121  |  1:00 PM JULY 01, 2026  |  $376,554.75  |  STP 2025(788)VRUG  |  TRAF SIGNAL IMPRVS  |  37 WORKING DAYS
Item Code
Description
Unit
Quantity
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 161.000
DRILL SHAFT (24 IN)
LF 24.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 56.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 74.000
TMA (STATIONARY)
DAY 74.000
SANDBAGS FOR EROSION CONTROL
EA 8.000
CONC SIDEWALKS (5")
SY 62.000
CURB RAMPS (TY 5)
SY 99.000
CONDT (PVC) (SCH 80) (2")
LF 100.000
CONDT (PVC) (SCH 80) (4")
LF 90.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 225.000
ELEC CONDR (NO.6) BARE
LF 350.000
ELEC CONDR (NO.2) INSULATED
LF 120.000
GROUND BOX TY D (162922)
EA 6.000
GROUND BOX TY D (162922)W/APRON
EA 1.000
REMOVE GROUND BOX
EA 4.000
REMOVE ELECTRICAL SERVICES
EA 1.000
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 1.000
ALUMINUM SIGNS (TY A)
SF 30.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000
PREFAB PM TY B (W)(24")(SLD)
LF 24.000
PREFAB PM TY C (W)(8")(SLD)
LF 600.000
PREFAB PM TY C (W)(24")(SLD)
LF 296.000
PREFAB PM TY C (W)(ARROW)
EA 8.000
ELIM EXT PM & MRKS (8")
LF 600.000
ELIM EXT PM & MRKS (24")
LF 296.000
ELIM EXT PM & MRKS (ARROW)
EA 6.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000
REMOVING TRAFFIC SIGNALS
EA 1.000
VEH SIG SEC (12")LED(GRN)
EA 11.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000
VEH SIG SEC (12")LED(YEL)
EA 11.000
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000
VEH SIG SEC (12")LED(RED)
EA 11.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 11.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 4.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 925.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 40.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 325.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 330.000
TRF SIG CBL (TY A)(12 AWG)(20 CONDR)
LF 460.000
INS TRF SIG PL AM (S)1 ARM(28')
EA 1.000
INS TRF SIG PL AM(S)1 ARM(32')
EA 1.000
INS TRF SIG PL AM(S)1 ARM(40')
EA 2.000
PED POLE ASSEMBLY
EA 4.000
INSTALL OF CABLES
LF 870.000
INSTALL OF PEDESTRIAN PUSH BUTTONS
EA 8.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $3,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
MATERIALS FURNISHED BY CITY (PART) $77,000.00
Total: $82,001.00