Show Job Controls
Bid Cobra

LUBBOCK VA (0905-06-120)

Items: 46

County: LUBBOCK
Length: N/A
Highway: VA
District: LUBBOCK
Control Number: 0905-06-120
DBE Goal: N/A
Project: STP 2023(034)TP
Guaranty: N/A
Time: 200 WORKING DAYS
Engineer's Estimate: $1,091,001.66
Date: 11/01/2023 (2 years ago)
Contract Number: N/A
Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Mail/Deliver Bids To: N/A
JOE VILLALOBOS
MICHAEL BOYD1
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,091,001.66
1
Awarded
$1,201,509.00
Over/Under Est: 10.13% $110,507.34
$1,205,251.66
Over/Under Est: 10.47% $114,250.00
Amt Left: 0.31% $3,742.66
Over/Under Est: 63.01% $687,489.34
Amt Left: 48.02% $576,982.00
Delta: -47.56% -$573,239.34
$2,463,936.00
Over/Under Est: 125.84% $1,372,934.34
Amt Left: 105.07% $1,262,427.00
Delta: -38.54% -$685,445.00
Subcontractor Percentage Amount
ARTEX ELECTRIC, INC. 38.88% $467,146.70
FIBERTEX, LLC 3.69% $44,335.68
TRP CONSTRUCTION GROUP, LLC 2.53% $30,398.18
FC TRAFFIC CONTROL, INC. 2.04% $24,510.78
Total: 47.14% $566,391.34

Bid Items & Bid Tabulations

46 Total 0 of 46
LUBBOCK  |  VA  |  LUBBOCK  |  0905-06-120  |  11/01/2023  |  $1,091,001.66  |  STP 2023(034)TP  |  BICYCLE AND PEDESTRIAN IMPRVS  |  200 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STX CIVIL
TI-ZACK CONCRETE, INC.
O. TREVINO CONSTRUCTION, LLC
GILVIN-TERRILL, LTD.
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 3.000 $859.510 $357.000 $1,375.000 $1,200.000 $5,000.000
REMOVING CONC (MEDIANS)
SY 4.000 $31.000 $238.000 $45.600 $700.000 $750.000
DRILL SEEDING (PERM)(WARM OR COOL)
SY 1,495.000 $0.150 $4.000 $3.300 $10.000 $10.000
VEGETATIVE WATERING
MG 51.000 $26.500 $12.000 $1.100 $45.000 $75.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 54.000 $274.000 $196.000 $181.500 $200.000 $350.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 146.000 $347.000 $505.000 $467.500 $500.000 $750.000
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 1.000 $539.000 $2,973.000 $1,100.000 $10,000.000 $2,000.000
MOBILIZATION
LS 1.000 $50,772.530 $95,133.000 $110,100.300 $175,000.000 $245,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $2,000.000 $2,300.000 $2,750.000 $15,000.000 $15,000.000
SANDBAGS FOR EROSION CONTROL
EA 46.000 $8.000 $12.000 $1.100 $25.000 $25.000
CONC CURB & GUTTER (TY II)
LF 63.000 $75.000 $65.000 $56.850 $120.000 $200.000
CONC CURB & GUTTER (SLOTTED)
LF 60.000 $100.000 $77.000 $56.850 $120.000 $210.000
CONCRETE CURB (SPECIAL)
LF 93.000 $200.000 $95.000 $67.980 $120.000 $210.000
INTRSCT, DRVWAYS, & TURNOUT (CONC)
SY 247.000 $100.000 $107.000 $156.230 $330.000 $300.000
CONC SIDEWALKS (4")
SY 3,561.000 $72.000 $95.000 $97.510 $105.000 $285.000
CURB RAMPS (TY 1)
SY 253.000 $244.000 $95.000 $132.450 $390.000 $330.000
CURB RAMPS (TY 2)
SY 101.000 $240.000 $95.000 $132.450 $225.000 $335.000
CURB RAMPS (TY 6)
SY 10.000 $250.000 $95.000 $132.450 $335.000 $332.000
CURB RAMPS (TY 7)
SY 95.000 $205.000 $95.000 $132.450 $315.000 $320.000
CURB RAMPS (TY 10)
SY 82.000 $274.000 $95.000 $132.450 $270.000 $320.000
CURB RAMPS (TY 22)
SY 50.000 $253.000 $95.000 $132.450 $380.000 $340.000
CONDT (PVC) (SCH 80) (3")
LF 221.000 $41.000 $33.000 $30.250 $33.000 $20.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 792.000 $33.000 $46.000 $42.350 $46.000 $40.000
ELEC CONDR (NO.8) INSULATED
LF 1,552.000 $1.500 $3.000 $2.640 $3.000 $2.000
GROUND BOX TY D (162922)
EA 23.000 $1,277.000 $1,827.000 $1,689.600 $1,800.000 $900.000
ELC SRV TY T 120/240 000(NS)GS(N)EX(O)
EA 5.000 $2,000.000 $2,973.000 $2,750.000 $3,000.000 $6,500.000
ALUMINUM SIGNS (TY A)
SF 163.000 $24.000 $42.000 $38.500 $42.000 $65.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 198.000 $18.500 $48.000 $44.000 $56.000 $40.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 732.000 $13.500 $22.000 $19.800 $25.000 $20.000
PAV SURF PREP FOR MRK (24")
LF 930.000 $1.500 $13.000 $11.000 $14.000 $10.000
INSTALL HWY TRF SIG (ISOLATED)
EA 5.000 $32,100.000 $4,459.000 $4,125.000 $4,500.000 $5,000.000
VEH SIG SEC (12")LED(YEL)
EA 30.000 $393.000 $398.000 $368.500 $400.000 $350.000
VEH SIG SEC (12")LED(RED)
EA 60.000 $369.000 $398.000 $368.500 $400.000 $350.000
PED SIG SEC (LED)(COUNTDOWN)
EA 18.000 $718.000 $1,486.000 $1,375.000 $1,500.000 $750.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 30.000 $50.000 $279.000 $258.500 $280.000 $250.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 2,952.000 $4.000 $6.000 $5.450 $6.000 $5.000
TRF SIG CBL (TY A)(16 AWG)(2 CONDR)
LF 1,596.000 $1.500 $4.000 $3.850 $4.000 $2.000
INS TRF SIG PL AM(S)1 ARM(32')
EA 1.000 $7,580.000 $20,216.000 $18,700.000 $20,000.000 $20,000.000
INS TRF SIG PL AM(S)1 ARM(36')
EA 6.000 $8,380.000 $20,924.000 $19,355.600 $21,000.000 $15,000.000
INS TRF SIG PL AM(S)1 ARM(44')
EA 3.000 $9,480.000 $25,673.000 $23,747.900 $26,000.000 $20,000.000
PED POLE ASSEMBLY
EA 9.000 $3,590.000 $2,805.000 $2,594.900 $2,800.000 $2,000.000
INSTALL OF PEDESTRIAN PUSH BUTTONS
EA 18.000 $100.000 $832.000 $770.000 $840.000 $400.000
LITTER REMOVAL
CYC 6.000 $200.000 $832.000 $1.100 $2,000.000 $2,750.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 12.000 $250.000 $595.000 $1.100 $1,500.000 $2,750.000
RETROFIT DET WARN SURF(SURF APPLIED)
EA 7.000 $354.550 $773.000 $446.910 $2,200.000 $300.000
TMA (STATIONARY)
DAY 260.000 $200.800 $12.000 $49.500 $350.000 $425.000
Totals: $1,091,001.660 $1,201,509.000 $1,205,251.660 $1,778,491.000 $2,463,936.000