PREPARING ROW
|
STA
|
79.000
|
$15,000.000
|
$1,484.200
|
$20,250.000
|
$12,000.000
|
$3,000.000
|
$12,500.000
|
|
|
|
REMOV CONC (PAV)
|
SY
|
223.000
|
$75.000
|
$45.900
|
$23.200
|
$50.000
|
$45.000
|
$94.500
|
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
40.000
|
$250.000
|
$41.050
|
$25.300
|
$50.000
|
$85.000
|
$90.500
|
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
1,234.000
|
$75.000
|
$21.610
|
$16.500
|
$50.000
|
$40.000
|
$46.500
|
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
1,538.000
|
$50.000
|
$28.110
|
$11.400
|
$50.000
|
$35.000
|
$29.000
|
|
|
|
REMOV CONC (CURB & GUTTER)
|
LF
|
634.000
|
$25.000
|
$9.950
|
$6.650
|
$25.000
|
$35.000
|
$12.500
|
|
|
|
EXCAV (ROADWAY)
|
CY
|
28,185.700
|
$15.000
|
$24.100
|
$22.000
|
$15.000
|
$45.000
|
$48.500
|
|
|
|
EXCAV (CHANNEL)
|
CY
|
1,112.000
|
$15.000
|
$16.600
|
$26.000
|
$15.000
|
$45.000
|
$43.000
|
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
2,359.200
|
$25.000
|
$7.400
|
$18.000
|
$20.000
|
$35.000
|
$24.000
|
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
9,661.000
|
$3.000
|
$2.700
|
$4.750
|
$6.000
|
$7.000
|
$8.100
|
|
|
|
HYDRO MULCH SEED (PERM_RURAL_SAND_HEL)
|
SY
|
9,661.000
|
$1.000
|
$1.750
|
$1.000
|
$6.000
|
$1.000
|
$1.050
|
|
|
|
FERTILIZER
|
AC
|
2.000
|
$600.000
|
$145.500
|
$725.000
|
$12,000.000
|
$550.000
|
$405.000
|
|
|
|
VEGETATIVE WATERING
|
TGL
|
275.000
|
$30.000
|
$44.300
|
$20.000
|
$350.000
|
$45.000
|
$39.000
|
|
|
|
IRRIGATION SYSTEM (MISC)
|
LS
|
1.000
|
$2,500.000
|
$17,250.000
|
$3,500.000
|
$3,500.000
|
$15,000.000
|
$22,500.000
|
|
|
|
MULCH
|
SY
|
50.000
|
$15.000
|
$92.000
|
$50.000
|
$6.000
|
$110.000
|
$58.000
|
|
|
|
LOOSE AGGR GRND COVER (TY I)
|
CY
|
84.000
|
$250.000
|
$192.900
|
$100.000
|
$200.000
|
$200.000
|
$580.000
|
|
|
|
RDSIDE AMENITY (REMOV & RESET)
|
EA
|
18.000
|
$250.000
|
$1,102.800
|
$141.000
|
$500.000
|
$410.000
|
$2,900.000
|
|
|
|
PROOF ROLLING
|
HR
|
35.000
|
$150.000
|
$130.650
|
$86.250
|
$300.000
|
$200.000
|
$220.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
923.000
|
$40.000
|
$116.100
|
$59.750
|
$50.000
|
$95.000
|
$150.000
|
|
|
|
PLANE ASPH CONC PAV (0" TO 9")
|
SY
|
28,037.000
|
$9.000
|
$9.950
|
$4.750
|
$20.000
|
$13.000
|
$13.500
|
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
198.000
|
$25.000
|
$39.550
|
$50.000
|
$150.000
|
$35.000
|
$58.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
232.000
|
$320.000
|
$373.750
|
$205.000
|
$240.000
|
$220.000
|
$240.000
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
48.000
|
$200.000
|
$287.500
|
$175.000
|
$210.000
|
$200.000
|
$205.000
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
88.000
|
$500.000
|
$632.500
|
$550.000
|
$570.000
|
$600.000
|
$640.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
514.000
|
$550.000
|
$597.650
|
$475.000
|
$800.000
|
$850.000
|
$695.000
|
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
4.000
|
$900.000
|
$852.250
|
$885.000
|
$900.000
|
$1,700.000
|
$815.000
|
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
226.000
|
$680.000
|
$708.270
|
$525.000
|
$700.000
|
$650.000
|
$465.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
6.000
|
$12,000.000
|
$11,806.610
|
$22,000.000
|
$8,500.000
|
$25,000.000
|
$8,100.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$1,000.000
|
$2,417.250
|
$12,000.000
|
$3,500.000
|
$3,000.000
|
$5,800.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
120.000
|
$50.000
|
$45.150
|
$35.250
|
$250.000
|
$40.000
|
$40.500
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,315,000.000
|
$1,337,771.250
|
$1,600,000.000
|
$1,500,000.000
|
$1,650,000.000
|
$1,800,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$20,000.000
|
$27,674.750
|
$60,000.000
|
$22,000.000
|
$78,100.000
|
$50,000.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,760.000
|
$40.000
|
$112.500
|
$10.000
|
$95.000
|
$85.000
|
$115.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
596.000
|
$250.000
|
$432.800
|
$100.000
|
$200.000
|
$200.000
|
$350.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
108.000
|
$500.000
|
$108.300
|
$100.000
|
$750.000
|
$50.000
|
$1,300.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
150.000
|
$50.000
|
$123.150
|
$48.000
|
$65.000
|
$53.000
|
$56.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
150.000
|
$50.000
|
$49.700
|
$15.000
|
$12.000
|
$20.000
|
$17.500
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
460.000
|
$40.000
|
$45.100
|
$24.000
|
$75.000
|
$48.000
|
$28.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
460.000
|
$20.000
|
$26.900
|
$12.000
|
$15.000
|
$20.000
|
$14.000
|
|
|
|
SANDBAGS FOR EROSION CONTROL (8")
|
LF
|
172.000
|
$10.000
|
$30.100
|
$32.000
|
$85.000
|
$32.000
|
$37.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
200.000
|
$8.000
|
$6.900
|
$7.500
|
$30.000
|
$6.500
|
$8.700
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
200.000
|
$8.000
|
$2.300
|
$4.000
|
$6.000
|
$3.000
|
$4.650
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
2,450.000
|
$10.000
|
$5.750
|
$8.500
|
$30.000
|
$11.000
|
$9.850
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,450.000
|
$5.000
|
$1.150
|
$1.500
|
$6.000
|
$2.000
|
$1.750
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
8,170.000
|
$90.000
|
$94.450
|
$98.250
|
$94.000
|
$85.000
|
$110.000
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
9,483.000
|
$28.000
|
$38.150
|
$52.000
|
$42.000
|
$35.000
|
$52.500
|
|
|
|
CONC CURB & GUTTER (SLOTTED)
|
LF
|
751.000
|
$50.000
|
$29.100
|
$98.000
|
$100.000
|
$60.000
|
$105.000
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,304.000
|
$105.000
|
$105.850
|
$125.000
|
$98.000
|
$170.000
|
$115.000
|
|
|
|
CONC SIDEWALKS (4")
|
SY
|
10,813.000
|
$75.000
|
$62.250
|
$72.500
|
$88.000
|
$98.000
|
$68.500
|
|
|
|
CURB RAMPS (TY 2)
|
EA
|
4.000
|
$2,000.000
|
$3,983.100
|
$3,200.000
|
$3,000.000
|
$3,000.000
|
$3,500.000
|
|
|
|
CURB RAMPS (TY 7)
|
EA
|
17.000
|
$2,000.000
|
$4,420.200
|
$3,300.000
|
$3,000.000
|
$3,000.000
|
$3,500.000
|
|
|
|
CONC MEDIAN
|
SY
|
288.000
|
$200.000
|
$134.100
|
$98.000
|
$150.000
|
$180.000
|
$120.000
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
3.000
|
$500.000
|
$632.500
|
$950.000
|
$1,800.000
|
$600.000
|
$640.000
|
|
|
|
IN RD IL (TY SA) 30S-8 (250W EQ) LED
|
EA
|
29.000
|
$5,000.000
|
$6,325.000
|
$3,680.000
|
$4,050.000
|
$3,900.000
|
$4,300.000
|
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
10,495.000
|
$16.000
|
$17.250
|
$9.500
|
$10.500
|
$10.000
|
$11.000
|
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
615.000
|
$27.000
|
$19.550
|
$20.500
|
$23.000
|
$22.000
|
$24.000
|
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
355.000
|
$15.000
|
$28.750
|
$11.000
|
$12.000
|
$12.000
|
$13.000
|
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
20.000
|
$25.000
|
$34.500
|
$14.000
|
$15.500
|
$15.000
|
$16.500
|
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
570.000
|
$40.000
|
$40.250
|
$31.000
|
$34.000
|
$33.000
|
$36.000
|
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
5,510.000
|
$2.700
|
$3.150
|
$1.000
|
$1.100
|
$1.100
|
$1.150
|
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
320.000
|
$2.000
|
$2.900
|
$1.050
|
$1.200
|
$1.200
|
$1.200
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
5,505.000
|
$2.900
|
$2.900
|
$1.500
|
$1.700
|
$1.600
|
$1.750
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
12,290.000
|
$2.000
|
$3.150
|
$1.600
|
$1.800
|
$1.700
|
$1.850
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,015.000
|
$2.000
|
$3.450
|
$1.750
|
$2.000
|
$1.900
|
$2.050
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
50.000
|
$2.000
|
$3.450
|
$2.000
|
$2.200
|
$2.200
|
$2.300
|
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
3.000
|
$6,000.000
|
$8,050.000
|
$3,400.000
|
$3,740.000
|
$3,600.000
|
$3,900.000
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
4.000
|
$950.000
|
$1,725.000
|
$950.000
|
$1,050.000
|
$1,000.000
|
$1,100.000
|
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
11.000
|
$1,200.000
|
$1,725.000
|
$1,100.000
|
$1,210.000
|
$1,200.000
|
$1,300.000
|
|
|
|
ELC SRV TY A 240/480 100(NS)AL(E)PS(U)
|
EA
|
1.000
|
$9,000.000
|
$10,350.000
|
$8,000.000
|
$8,800.000
|
$8,500.000
|
$9,300.000
|
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)SP(U)
|
EA
|
1.000
|
$6,825.000
|
$8,625.000
|
$8,000.000
|
$8,800.000
|
$8,500.000
|
$9,300.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
20.000
|
$1,500.000
|
$1,121.250
|
$760.000
|
$1,500.000
|
$1,100.000
|
$1,100.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
72.000
|
$175.000
|
$115.000
|
$125.000
|
$1,000.000
|
$110.000
|
$115.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
15,441.000
|
$0.130
|
$0.700
|
$0.600
|
$0.800
|
$0.650
|
$0.700
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
31,825.000
|
$0.160
|
$0.700
|
$0.600
|
$0.800
|
$0.650
|
$0.700
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
487.000
|
$4.780
|
$6.900
|
$6.000
|
$7.200
|
$6.500
|
$6.950
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
780.000
|
$3.150
|
$6.900
|
$6.000
|
$7.200
|
$6.500
|
$6.950
|
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
737.000
|
$4.500
|
$6.300
|
$5.500
|
$6.600
|
$6.000
|
$6.400
|
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
930.000
|
$3.820
|
$6.300
|
$5.500
|
$6.600
|
$6.000
|
$6.400
|
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
397.000
|
$3.500
|
$20.150
|
$17.500
|
$21.000
|
$20.000
|
$20.500
|
|
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
107.000
|
$2.500
|
$1.750
|
$1.500
|
$2.000
|
$1.600
|
$1.750
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,008.000
|
$2.500
|
$1.750
|
$1.500
|
$2.000
|
$1.600
|
$1.750
|
|
|
|
PAVEMENT SLER 6"
|
LF
|
14,565.000
|
$1.250
|
$0.700
|
$0.600
|
$0.800
|
$0.650
|
$0.700
|
|
|
|
PAVEMENT SLER 8"
|
LF
|
5,115.000
|
$1.500
|
$0.900
|
$0.800
|
$1.000
|
$0.850
|
$0.930
|
|
|
|
PAVEMENT SLER 24"
|
LF
|
3,213.000
|
$2.000
|
$7.100
|
$6.150
|
$7.500
|
$6.500
|
$7.150
|
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
24.000
|
$50.000
|
$126.500
|
$110.000
|
$132.000
|
$120.000
|
$130.000
|
|
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
3,069.000
|
$2.250
|
$1.450
|
$1.250
|
$1.500
|
$1.300
|
$1.450
|
|
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
248.000
|
$2.250
|
$1.450
|
$1.250
|
$1.500
|
$1.300
|
$1.450
|
|
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,976.000
|
$2.250
|
$1.450
|
$1.250
|
$1.500
|
$1.300
|
$1.450
|
|
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
9,272.000
|
$2.250
|
$1.450
|
$1.250
|
$1.500
|
$1.300
|
$1.450
|
|
|
|
PREFAB PM TY B (W)(24")(SLD)
|
LF
|
3,213.000
|
$40.000
|
$40.250
|
$35.000
|
$42.000
|
$40.000
|
$40.500
|
|
|
|
PREFAB PM TY B (W)(ARROW)
|
EA
|
24.000
|
$1,100.000
|
$575.000
|
$500.000
|
$600.000
|
$550.000
|
$580.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
157.000
|
$10.000
|
$6.900
|
$6.000
|
$7.200
|
$6.500
|
$6.950
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
199.000
|
$10.000
|
$6.900
|
$6.000
|
$7.200
|
$6.500
|
$6.950
|
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
312.000
|
$3.000
|
$5.750
|
$5.000
|
$6.000
|
$5.500
|
$5.800
|
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
14,565.000
|
$1.200
|
$0.600
|
$0.500
|
$0.600
|
$0.500
|
$0.580
|
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
5,115.000
|
$1.500
|
$0.700
|
$0.600
|
$0.800
|
$0.600
|
$0.700
|
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
3,213.000
|
$15.000
|
$6.350
|
$5.300
|
$6.600
|
$6.000
|
$6.400
|
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
24.000
|
$15.000
|
$115.000
|
$100.000
|
$120.000
|
$110.000
|
$115.000
|
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
1.000
|
$22,142.000
|
$34,500.000
|
$24,791.200
|
$27,500.000
|
$28,000.000
|
$29,000.000
|
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
12.000
|
$300.000
|
$575.000
|
$300.000
|
$330.000
|
$320.000
|
$350.000
|
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
8.000
|
$300.000
|
$575.000
|
$300.000
|
$330.000
|
$320.000
|
$350.000
|
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
12.000
|
$300.000
|
$575.000
|
$300.000
|
$330.000
|
$320.000
|
$350.000
|
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
12.000
|
$300.000
|
$575.000
|
$300.000
|
$330.000
|
$320.000
|
$350.000
|
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
12.000
|
$300.000
|
$575.000
|
$300.000
|
$330.000
|
$320.000
|
$350.000
|
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$300.000
|
$575.000
|
$300.000
|
$330.000
|
$320.000
|
$350.000
|
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
8.000
|
$900.000
|
$862.500
|
$800.000
|
$880.000
|
$850.000
|
$930.000
|
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
8.000
|
$200.000
|
$230.000
|
$250.000
|
$300.000
|
$270.000
|
$290.000
|
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)ALUM
|
EA
|
4.000
|
$250.000
|
$287.500
|
$300.000
|
$330.000
|
$320.000
|
$350.000
|
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)ALUM
|
EA
|
4.000
|
$250.000
|
$287.500
|
$325.000
|
$360.000
|
$350.000
|
$375.000
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
495.000
|
$3.500
|
$3.450
|
$4.500
|
$5.000
|
$5.000
|
$5.250
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
375.000
|
$5.000
|
$3.750
|
$5.000
|
$5.500
|
$5.500
|
$5.800
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
|
LF
|
1,410.000
|
$7.000
|
$5.750
|
$5.500
|
$6.000
|
$6.000
|
$6.400
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
735.000
|
$8.000
|
$14.400
|
$8.750
|
$10.000
|
$10.000
|
$10.000
|
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
1,450.000
|
$5.000
|
$3.450
|
$2.000
|
$2.200
|
$2.200
|
$2.300
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
1.000
|
$32,000.000
|
$43,700.000
|
$34,500.000
|
$38,000.000
|
$37,000.000
|
$40,000.000
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
2.000
|
$35,000.000
|
$44,275.000
|
$36,250.000
|
$40,000.000
|
$40,000.000
|
$42,000.000
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
1.000
|
$37,000.000
|
$44,852.000
|
$37,500.000
|
$42,000.000
|
$41,000.000
|
$43,500.000
|
|
|
|
PED POLE ASSEMBLY
|
EA
|
8.000
|
$3,000.000
|
$4,025.000
|
$1,750.000
|
$1,925.000
|
$2,000.000
|
$2,000.000
|
|
|
|
PEDESTRIAN PUSH BUTTON POLE
|
EA
|
8.000
|
$2,300.000
|
$4,025.000
|
$1,500.000
|
$1,650.000
|
$1,600.000
|
$1,700.000
|
|
|
|
RELOCATE PED POLE ASSEMBLY
|
EA
|
2.000
|
$6,000.000
|
$2,875.000
|
$1,300.000
|
$1,430.000
|
$1,400.000
|
$1,500.000
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$2,500.000
|
$8,493.000
|
$10,000.000
|
$8,500.000
|
$10,000.000
|
$8,700.000
|
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$2,500.000
|
$979.950
|
$5,000.000
|
$8,500.000
|
$6,000.000
|
$3,500.000
|
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
493.000
|
$35.000
|
$9.800
|
$5.000
|
$25.000
|
$7.000
|
$17.500
|
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
493.000
|
$60.000
|
$39.200
|
$35.000
|
$125.000
|
$28.000
|
$115.000
|
|
|
|
VIVDS CABLING
|
LF
|
975.000
|
$3.000
|
$2.300
|
$3.000
|
$3.300
|
$3.200
|
$3.500
|
|
|
|
VIVDS PROSR SYS (INSTALL ONLY)
|
EA
|
1.000
|
$366.000
|
$862.500
|
$500.000
|
$550.000
|
$550.000
|
$580.000
|
|
|
|
VIVDS CAM ASSY (INSTALL ONLY)
|
EA
|
4.000
|
$2,000.000
|
$402.500
|
$500.000
|
$550.000
|
$550.000
|
$580.000
|
|
1
|
|
FL BS (CMP IN PLC)(TY A GR 4) (12")
|
SY
|
3,510.000
|
$17.809
|
$0.000
|
$28.700
|
$32.000
|
$48.000
|
$0.000
|
|
1
|
|
CEMENT
|
TON
|
587.000
|
$245.011
|
$0.000
|
$227.000
|
$400.000
|
$260.000
|
$0.000
|
|
1
|
|
CEMENT TRT (EXIST MATL)(8")
|
SY
|
52,160.000
|
$4.000
|
$0.000
|
$11.000
|
$9.000
|
$6.000
|
$0.000
|
|
1
|
|
PRIME COAT (MC-30)
|
GAL
|
11,134.000
|
$5.750
|
$0.000
|
$7.050
|
$16.000
|
$8.000
|
$0.000
|
|
1
|
|
FOG SEAL (CSS-1H)
|
GAL
|
8,474.000
|
$4.000
|
$0.000
|
$6.250
|
$9.000
|
$5.000
|
$0.000
|
|
1
|
|
D-GR HMA TY-C SAC-A PG70-28
|
TON
|
347.000
|
$250.000
|
$0.000
|
$190.000
|
$250.000
|
$215.000
|
$0.000
|
|
1
|
|
D-GR HMA TY-D SAC-B PG70-28
|
TON
|
2,712.000
|
$250.000
|
$0.000
|
$190.000
|
$185.000
|
$215.000
|
$0.000
|
|
1
|
|
D-GR HMA TY-B SAC-B PG70-28
|
TON
|
693.000
|
$300.000
|
$0.000
|
$192.000
|
$185.000
|
$200.000
|
$0.000
|
|
1
|
|
CONC PVMT (CRCP) (9")
|
SY
|
47,075.000
|
$97.000
|
$0.000
|
$101.000
|
$115.000
|
$107.000
|
$0.000
|
|
1
|
|
CONC PVMT(TRANSITION SLAB) (9")
|
SY
|
95.000
|
$150.000
|
$0.000
|
$197.000
|
$150.000
|
$260.000
|
$0.000
|
|
1A
|
|
FL BS (CMP IN PLC)(TY A GR 4) (12")
|
SY
|
18,069.000
|
$17.809
|
$27.950
|
$0.000
|
$0.000
|
$0.000
|
$40.000
|
|
1A
|
|
CEMENT
|
TON
|
431.000
|
$245.011
|
$277.600
|
$0.000
|
$0.000
|
$0.000
|
$265.000
|
|
1A
|
|
CEMENT TRT (EXIST MATL)(8")
|
SY
|
33,258.000
|
$4.000
|
$3.100
|
$0.000
|
$0.000
|
$0.000
|
$8.400
|
|
1A
|
|
PRIME COAT (MC-30)
|
GAL
|
11,259.000
|
$5.750
|
$5.850
|
$0.000
|
$0.000
|
$0.000
|
$10.000
|
|
1A
|
|
FOG SEAL (CSS-1H)
|
GAL
|
6,118.000
|
$4.000
|
$7.250
|
$0.000
|
$0.000
|
$0.000
|
$6.350
|
|
1A
|
|
D-GR HMA TY-C SAC-A PG70-28
|
TON
|
1,853.000
|
$250.000
|
$273.400
|
$0.000
|
$0.000
|
$0.000
|
$260.000
|
|
1A
|
|
D-GR HMA TY-D SAC-B PG70-28
|
TON
|
1,957.000
|
$250.000
|
$248.550
|
$0.000
|
$0.000
|
$0.000
|
$350.000
|
|
1A
|
|
D-GR HMA TY-B SAC-B PG70-28
|
TON
|
3,706.000
|
$300.000
|
$266.650
|
$0.000
|
$0.000
|
$0.000
|
$235.000
|
|
1A
|
|
CONC PVMT (CRCP) (9")
|
SY
|
33,982.000
|
$97.000
|
$114.250
|
$0.000
|
$0.000
|
$0.000
|
$130.000
|
|
1A
|
|
CONC PVMT(TRANSITION SLAB) (9")
|
SY
|
277.000
|
$150.000
|
$127.800
|
$0.000
|
$0.000
|
$0.000
|
$350.000
|
|
Totals: |
$20,505,596.649
|
$14,858,178.100
|
$16,166,600.000
|
$16,712,868.900
|
$17,152,642.400
|
$18,999,995.900
|