Show Job Controls
Bid Cobra

LUBBOCK UPLAND AVE (0905-06-096)

Items: 147

County: LUBBOCK
Length: 0.0000 MILES
Highway: UPLAND AVE
District: LUBBOCK
Control Number: 0905-06-096
DBE Goal: 0.0%
Project: STP 2019(519)MM
Guaranty: $100,000.00
Time: 347 WORKING DAYS
Engineer's Estimate: $14,464,477.79
Date: 04/08/2026 (2 months ago) Changed
Contract Number: 4263207
Type: WIDEN NON-FREEWAY 2 LANES TO 5 LANES
Project ID: A00121395
Contract Type: Federal
Project Description: WIDEN NON-FREEWAY 2 LANES TO 5 LANES WITH TWLTL; PEDESTRIAN AND INTERSECTION IMPROVEMENTS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$14,464,477.79
Over/Under Est: 2.72% $393,700.31
$16,166,600.00
Over/Under Est: 11.77% $1,702,122.21
Amt Left: 8.81% $1,308,421.90
Over/Under Est: 15.54% $2,248,391.11
Amt Left: 12.48% $1,854,690.80
Delta: -3.38% -$546,268.90
$17,152,642.40
Over/Under Est: 18.58% $2,688,164.61
Amt Left: 15.44% $2,294,464.30
Delta: -2.63% -$439,773.50
$18,999,995.90
Over/Under Est: 31.36% $4,535,518.11
Amt Left: 27.88% $4,141,817.80
Delta: -10.77% -$1,847,353.50

Bid Items & Bid Tabulations

147 Total 0 of 147
LUBBOCK  |  UPLAND AVE  |  LUBBOCK  |  0905-06-096  |  04/08/2026  |  $14,464,477.79  |  STP 2019(519)MM  |  WIDEN NON-FREEWAY 2 LANES TO 5 LANES  |  347 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
L A FULLER & SONS CONSTRUCTION, LTD.
WEBBER, LLC
LONE STAR DIRT & PAVING, LTD.
A. L. HELMCAMP, INC.
DUININCK, INC.
PREPARING ROW
STA 79.000 $15,000.000 $1,484.200 $20,250.000 $12,000.000 $3,000.000 $12,500.000
REMOV CONC (PAV)
SY 223.000 $75.000 $45.900 $23.200 $50.000 $45.000 $94.500
REMOV CONC (RIPRAP)
SY 40.000 $250.000 $41.050 $25.300 $50.000 $85.000 $90.500
REMOV CONC (DRIVEWAYS)
SY 1,234.000 $75.000 $21.610 $16.500 $50.000 $40.000 $46.500
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 1,538.000 $50.000 $28.110 $11.400 $50.000 $35.000 $29.000
REMOV CONC (CURB & GUTTER)
LF 634.000 $25.000 $9.950 $6.650 $25.000 $35.000 $12.500
EXCAV (ROADWAY)
CY 28,185.700 $15.000 $24.100 $22.000 $15.000 $45.000 $48.500
EXCAV (CHANNEL)
CY 1,112.000 $15.000 $16.600 $26.000 $15.000 $45.000 $43.000
EMBANK (FNL)(DC)(TY C)
CY 2,359.200 $25.000 $7.400 $18.000 $20.000 $35.000 $24.000
FURN & PLACE TOPSOIL (4")
SY 9,661.000 $3.000 $2.700 $4.750 $6.000 $7.000 $8.100
HYDRO MULCH SEED (PERM_RURAL_SAND_HEL)
SY 9,661.000 $1.000 $1.750 $1.000 $6.000 $1.000 $1.050
FERTILIZER
AC 2.000 $600.000 $145.500 $725.000 $12,000.000 $550.000 $405.000
VEGETATIVE WATERING
TGL 275.000 $30.000 $44.300 $20.000 $350.000 $45.000 $39.000
IRRIGATION SYSTEM (MISC)
LS 1.000 $2,500.000 $17,250.000 $3,500.000 $3,500.000 $15,000.000 $22,500.000
MULCH
SY 50.000 $15.000 $92.000 $50.000 $6.000 $110.000 $58.000
LOOSE AGGR GRND COVER (TY I)
CY 84.000 $250.000 $192.900 $100.000 $200.000 $200.000 $580.000
RDSIDE AMENITY (REMOV & RESET)
EA 18.000 $250.000 $1,102.800 $141.000 $500.000 $410.000 $2,900.000
PROOF ROLLING
HR 35.000 $150.000 $130.650 $86.250 $300.000 $200.000 $220.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 923.000 $40.000 $116.100 $59.750 $50.000 $95.000 $150.000
PLANE ASPH CONC PAV (0" TO 9")
SY 28,037.000 $9.000 $9.950 $4.750 $20.000 $13.000 $13.500
STRUCT EXCAV (BOX)
CY 198.000 $25.000 $39.550 $50.000 $150.000 $35.000 $58.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 232.000 $320.000 $373.750 $205.000 $240.000 $220.000 $240.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 48.000 $200.000 $287.500 $175.000 $210.000 $200.000 $205.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 88.000 $500.000 $632.500 $550.000 $570.000 $600.000 $640.000
RIPRAP (CONC)(5 IN)
CY 514.000 $550.000 $597.650 $475.000 $800.000 $850.000 $695.000
RIPRAP (CONC)(FLUME)
CY 4.000 $900.000 $852.250 $885.000 $900.000 $1,700.000 $815.000
CONC BOX CULV (6 FT X 2 FT)
LF 226.000 $680.000 $708.270 $525.000 $700.000 $650.000 $465.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1)(P)
EA 6.000 $12,000.000 $11,806.610 $22,000.000 $8,500.000 $25,000.000 $8,100.000
CLEAN EXIST CULVERTS
EA 4.000 $1,000.000 $2,417.250 $12,000.000 $3,500.000 $3,000.000 $5,800.000
REMOV STR (PIPE)
LF 120.000 $50.000 $45.150 $35.250 $250.000 $40.000 $40.500
MOBILIZATION
LS 1.000 $1,315,000.000 $1,337,771.250 $1,600,000.000 $1,500,000.000 $1,650,000.000 $1,800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 21.000 $20,000.000 $27,674.750 $60,000.000 $22,000.000 $78,100.000 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,760.000 $40.000 $112.500 $10.000 $95.000 $85.000 $115.000
TMA (STATIONARY)
DAY 596.000 $250.000 $432.800 $100.000 $200.000 $200.000 $350.000
TMA (MOBILE OPERATION)
DAY 108.000 $500.000 $108.300 $100.000 $750.000 $50.000 $1,300.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 150.000 $50.000 $123.150 $48.000 $65.000 $53.000 $56.000
ROCK FILTER DAMS (REMOVE)
LF 150.000 $50.000 $49.700 $15.000 $12.000 $20.000 $17.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 460.000 $40.000 $45.100 $24.000 $75.000 $48.000 $28.000
CONSTRUCTION EXITS (REMOVE)
SY 460.000 $20.000 $26.900 $12.000 $15.000 $20.000 $14.000
SANDBAGS FOR EROSION CONTROL (8")
LF 172.000 $10.000 $30.100 $32.000 $85.000 $32.000 $37.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 200.000 $8.000 $6.900 $7.500 $30.000 $6.500 $8.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 200.000 $8.000 $2.300 $4.000 $6.000 $3.000 $4.650
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 2,450.000 $10.000 $5.750 $8.500 $30.000 $11.000 $9.850
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,450.000 $5.000 $1.150 $1.500 $6.000 $2.000 $1.750
CONSTRUCTING DETOURS
SY 8,170.000 $90.000 $94.450 $98.250 $94.000 $85.000 $110.000
CONC CURB & GUTTER (TY II)
LF 9,483.000 $28.000 $38.150 $52.000 $42.000 $35.000 $52.500
CONC CURB & GUTTER (SLOTTED)
LF 751.000 $50.000 $29.100 $98.000 $100.000 $60.000 $105.000
DRIVEWAYS (CONC)
SY 2,304.000 $105.000 $105.850 $125.000 $98.000 $170.000 $115.000
CONC SIDEWALKS (4")
SY 10,813.000 $75.000 $62.250 $72.500 $88.000 $98.000 $68.500
CURB RAMPS (TY 2)
EA 4.000 $2,000.000 $3,983.100 $3,200.000 $3,000.000 $3,000.000 $3,500.000
CURB RAMPS (TY 7)
EA 17.000 $2,000.000 $4,420.200 $3,300.000 $3,000.000 $3,000.000 $3,500.000
CONC MEDIAN
SY 288.000 $200.000 $134.100 $98.000 $150.000 $180.000 $120.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 3.000 $500.000 $632.500 $950.000 $1,800.000 $600.000 $640.000
IN RD IL (TY SA) 30S-8 (250W EQ) LED
EA 29.000 $5,000.000 $6,325.000 $3,680.000 $4,050.000 $3,900.000 $4,300.000
CONDT (PVC) (SCH 80) (2")
LF 10,495.000 $16.000 $17.250 $9.500 $10.500 $10.000 $11.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 615.000 $27.000 $19.550 $20.500 $23.000 $22.000 $24.000
CONDT (PVC) (SCH 80) (3")
LF 355.000 $15.000 $28.750 $11.000 $12.000 $12.000 $13.000
CONDT (PVC) (SCH 80) (4")
LF 20.000 $25.000 $34.500 $14.000 $15.500 $15.000 $16.500
CONDT (PVC) (SCH 80) (4") (BORE)
LF 570.000 $40.000 $40.250 $31.000 $34.000 $33.000 $36.000
ELEC CONDR (NO.14) INSULATED
LF 5,510.000 $2.700 $3.150 $1.000 $1.100 $1.100 $1.150
ELEC CONDR (NO.12) INSULATED
LF 320.000 $2.000 $2.900 $1.050 $1.200 $1.200 $1.200
ELEC CONDR (NO.8) BARE
LF 5,505.000 $2.900 $2.900 $1.500 $1.700 $1.600 $1.750
ELEC CONDR (NO.8) INSULATED
LF 12,290.000 $2.000 $3.150 $1.600 $1.800 $1.700 $1.850
ELEC CONDR (NO.6) BARE
LF 1,015.000 $2.000 $3.450 $1.750 $2.000 $1.900 $2.050
ELEC CONDR (NO.6) INSULATED
LF 50.000 $2.000 $3.450 $2.000 $2.200 $2.200 $2.300
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 3.000 $6,000.000 $8,050.000 $3,400.000 $3,740.000 $3,600.000 $3,900.000
GROUND BOX TY A (122311)W/APRON
EA 4.000 $950.000 $1,725.000 $950.000 $1,050.000 $1,000.000 $1,100.000
GROUND BOX TY C (162911)W/APRON
EA 11.000 $1,200.000 $1,725.000 $1,100.000 $1,210.000 $1,200.000 $1,300.000
ELC SRV TY A 240/480 100(NS)AL(E)PS(U)
EA 1.000 $9,000.000 $10,350.000 $8,000.000 $8,800.000 $8,500.000 $9,300.000
ELC SRV TY D 120/240 070(NS)SS(E)SP(U)
EA 1.000 $6,825.000 $8,625.000 $8,000.000 $8,800.000 $8,500.000 $9,300.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 20.000 $1,500.000 $1,121.250 $760.000 $1,500.000 $1,100.000 $1,100.000
REMOVE SM RD SN SUP&AM
EA 72.000 $175.000 $115.000 $125.000 $1,000.000 $110.000 $115.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 15,441.000 $0.130 $0.700 $0.600 $0.800 $0.650 $0.700
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 31,825.000 $0.160 $0.700 $0.600 $0.800 $0.650 $0.700
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 487.000 $4.780 $6.900 $6.000 $7.200 $6.500 $6.950
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 780.000 $3.150 $6.900 $6.000 $7.200 $6.500 $6.950
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 737.000 $4.500 $6.300 $5.500 $6.600 $6.000 $6.400
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 930.000 $3.820 $6.300 $5.500 $6.600 $6.000 $6.400
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 397.000 $3.500 $20.150 $17.500 $21.000 $20.000 $20.500
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 107.000 $2.500 $1.750 $1.500 $2.000 $1.600 $1.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,008.000 $2.500 $1.750 $1.500 $2.000 $1.600 $1.750
PAVEMENT SLER 6"
LF 14,565.000 $1.250 $0.700 $0.600 $0.800 $0.650 $0.700
PAVEMENT SLER 8"
LF 5,115.000 $1.500 $0.900 $0.800 $1.000 $0.850 $0.930
PAVEMENT SLER 24"
LF 3,213.000 $2.000 $7.100 $6.150 $7.500 $6.500 $7.150
PAVEMENT SLER (ARROW)
EA 24.000 $50.000 $126.500 $110.000 $132.000 $120.000 $130.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 3,069.000 $2.250 $1.450 $1.250 $1.500 $1.300 $1.450
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 248.000 $2.250 $1.450 $1.250 $1.500 $1.300 $1.450
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 1,976.000 $2.250 $1.450 $1.250 $1.500 $1.300 $1.450
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 9,272.000 $2.250 $1.450 $1.250 $1.500 $1.300 $1.450
PREFAB PM TY B (W)(24")(SLD)
LF 3,213.000 $40.000 $40.250 $35.000 $42.000 $40.000 $40.500
PREFAB PM TY B (W)(ARROW)
EA 24.000 $1,100.000 $575.000 $500.000 $600.000 $550.000 $580.000
REFL PAV MRKR TY I-C
EA 157.000 $10.000 $6.900 $6.000 $7.200 $6.500 $6.950
REFL PAV MRKR TY II-A-A
EA 199.000 $10.000 $6.900 $6.000 $7.200 $6.500 $6.950
ELIM EXT PM & MRKS (24")
LF 312.000 $3.000 $5.750 $5.000 $6.000 $5.500 $5.800
PAV SURF PREP FOR MRK (6")
LF 14,565.000 $1.200 $0.600 $0.500 $0.600 $0.500 $0.580
PAV SURF PREP FOR MRK (8")
LF 5,115.000 $1.500 $0.700 $0.600 $0.800 $0.600 $0.700
PAV SURF PREP FOR MRK (24")
LF 3,213.000 $15.000 $6.350 $5.300 $6.600 $6.000 $6.400
PAV SURF PREP FOR MRK (ARROW)
EA 24.000 $15.000 $115.000 $100.000 $120.000 $110.000 $115.000
INSTALL HWY TRF SIG (SYSTEM)
EA 1.000 $22,142.000 $34,500.000 $24,791.200 $27,500.000 $28,000.000 $29,000.000
VEH SIG SEC (12")LED(GRN)
EA 12.000 $300.000 $575.000 $300.000 $330.000 $320.000 $350.000
VEH SIG SEC (12")LED(GRN ARW)
EA 8.000 $300.000 $575.000 $300.000 $330.000 $320.000 $350.000
VEH SIG SEC (12")LED(YEL)
EA 12.000 $300.000 $575.000 $300.000 $330.000 $320.000 $350.000
VEH SIG SEC (12")LED(YEL ARW)
EA 12.000 $300.000 $575.000 $300.000 $330.000 $320.000 $350.000
VEH SIG SEC (12")LED(RED)
EA 12.000 $300.000 $575.000 $300.000 $330.000 $320.000 $350.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $300.000 $575.000 $300.000 $330.000 $320.000 $350.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $900.000 $862.500 $800.000 $880.000 $850.000 $930.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 8.000 $200.000 $230.000 $250.000 $300.000 $270.000 $290.000
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 4.000 $250.000 $287.500 $300.000 $330.000 $320.000 $350.000
BACKPLATE W/REFL BRDR(5 SEC)ALUM
EA 4.000 $250.000 $287.500 $325.000 $360.000 $350.000 $375.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 495.000 $3.500 $3.450 $4.500 $5.000 $5.000 $5.250
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 375.000 $5.000 $3.750 $5.000 $5.500 $5.500 $5.800
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 1,410.000 $7.000 $5.750 $5.500 $6.000 $6.000 $6.400
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 735.000 $8.000 $14.400 $8.750 $10.000 $10.000 $10.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 1,450.000 $5.000 $3.450 $2.000 $2.200 $2.200 $2.300
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 1.000 $32,000.000 $43,700.000 $34,500.000 $38,000.000 $37,000.000 $40,000.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 2.000 $35,000.000 $44,275.000 $36,250.000 $40,000.000 $40,000.000 $42,000.000
INS TRF SIG PL AM(S)1 ARM(65')LUM
EA 1.000 $37,000.000 $44,852.000 $37,500.000 $42,000.000 $41,000.000 $43,500.000
PED POLE ASSEMBLY
EA 8.000 $3,000.000 $4,025.000 $1,750.000 $1,925.000 $2,000.000 $2,000.000
PEDESTRIAN PUSH BUTTON POLE
EA 8.000 $2,300.000 $4,025.000 $1,500.000 $1,650.000 $1,600.000 $1,700.000
RELOCATE PED POLE ASSEMBLY
EA 2.000 $6,000.000 $2,875.000 $1,300.000 $1,430.000 $1,400.000 $1,500.000
FULL - WIDTH MOWING
CYC 2.000 $2,500.000 $8,493.000 $10,000.000 $8,500.000 $10,000.000 $8,700.000
LITTER REMOVAL
CYC 2.000 $2,500.000 $979.950 $5,000.000 $8,500.000 $6,000.000 $3,500.000
POST AND CABLE FENCE (REMOVAL)
LF 493.000 $35.000 $9.800 $5.000 $25.000 $7.000 $17.500
POST AND CABLE FENCE (NEW INSTALLATION)
LF 493.000 $60.000 $39.200 $35.000 $125.000 $28.000 $115.000
VIVDS CABLING
LF 975.000 $3.000 $2.300 $3.000 $3.300 $3.200 $3.500
VIVDS PROSR SYS (INSTALL ONLY)
EA 1.000 $366.000 $862.500 $500.000 $550.000 $550.000 $580.000
VIVDS CAM ASSY (INSTALL ONLY)
EA 4.000 $2,000.000 $402.500 $500.000 $550.000 $550.000 $580.000
1
FL BS (CMP IN PLC)(TY A GR 4) (12")
SY 3,510.000 $17.809 $0.000 $28.700 $32.000 $48.000 $0.000
1
CEMENT
TON 587.000 $245.011 $0.000 $227.000 $400.000 $260.000 $0.000
1
CEMENT TRT (EXIST MATL)(8")
SY 52,160.000 $4.000 $0.000 $11.000 $9.000 $6.000 $0.000
1
PRIME COAT (MC-30)
GAL 11,134.000 $5.750 $0.000 $7.050 $16.000 $8.000 $0.000
1
FOG SEAL (CSS-1H)
GAL 8,474.000 $4.000 $0.000 $6.250 $9.000 $5.000 $0.000
1
D-GR HMA TY-C SAC-A PG70-28
TON 347.000 $250.000 $0.000 $190.000 $250.000 $215.000 $0.000
1
D-GR HMA TY-D SAC-B PG70-28
TON 2,712.000 $250.000 $0.000 $190.000 $185.000 $215.000 $0.000
1
D-GR HMA TY-B SAC-B PG70-28
TON 693.000 $300.000 $0.000 $192.000 $185.000 $200.000 $0.000
1
CONC PVMT (CRCP) (9")
SY 47,075.000 $97.000 $0.000 $101.000 $115.000 $107.000 $0.000
1
CONC PVMT(TRANSITION SLAB) (9")
SY 95.000 $150.000 $0.000 $197.000 $150.000 $260.000 $0.000
1A
FL BS (CMP IN PLC)(TY A GR 4) (12")
SY 18,069.000 $17.809 $27.950 $0.000 $0.000 $0.000 $40.000
1A
CEMENT
TON 431.000 $245.011 $277.600 $0.000 $0.000 $0.000 $265.000
1A
CEMENT TRT (EXIST MATL)(8")
SY 33,258.000 $4.000 $3.100 $0.000 $0.000 $0.000 $8.400
1A
PRIME COAT (MC-30)
GAL 11,259.000 $5.750 $5.850 $0.000 $0.000 $0.000 $10.000
1A
FOG SEAL (CSS-1H)
GAL 6,118.000 $4.000 $7.250 $0.000 $0.000 $0.000 $6.350
1A
D-GR HMA TY-C SAC-A PG70-28
TON 1,853.000 $250.000 $273.400 $0.000 $0.000 $0.000 $260.000
1A
D-GR HMA TY-D SAC-B PG70-28
TON 1,957.000 $250.000 $248.550 $0.000 $0.000 $0.000 $350.000
1A
D-GR HMA TY-B SAC-B PG70-28
TON 3,706.000 $300.000 $266.650 $0.000 $0.000 $0.000 $235.000
1A
CONC PVMT (CRCP) (9")
SY 33,982.000 $97.000 $114.250 $0.000 $0.000 $0.000 $130.000
1A
CONC PVMT(TRANSITION SLAB) (9")
SY 277.000 $150.000 $127.800 $0.000 $0.000 $0.000 $350.000
Totals: $20,505,596.649 $14,858,178.100 $16,166,600.000 $16,712,868.900 $17,152,642.400 $18,999,995.900
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $8,000.00
ITS: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $80,000.00
CITY FORCE ACCOUNT WORK (PART) $50,000.00
Total: $188,000.00