LUBBOCK SL 289 (0783-01-098)

Items: 101

County: LUBBOCK
Length: N/A
Highway: SL 289
District: LUBBOCK
Control Number: 0783-01-098
DBE Goal: N/A
Project: C 783-1-98
Guaranty: N/A
Time: 398 WORKING DAYS
Engineer's Estimate: $12,274,262.13
Date: 02/06/2019 (7 years ago)
Contract Number: N/A
Type: MILL,INLAY,FABRIC,SMA,& STRIPING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$12,274,262.13
$13,802,665.94
Over/Under Est: 12.45% $1,528,403.81
$14,047,183.12
Over/Under Est: 14.44% $1,772,920.99
Amt Left: 1.77% $244,517.18
Over/Under Est: 24.83% $3,047,127.66
Amt Left: 11% $1,518,723.85
Delta: -9.07% -$1,274,206.67

Bid Items & Bid Tabulations

101 Total 0 of 101
LUBBOCK  |  SL 289  |  LUBBOCK  |  0783-01-098  |  02/06/2019  |  $12,274,262.13  |  C 783-1-98  |  MILL,INLAY,FABRIC,SMA,& STRIPING  |  398 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALLEN BUTLER CONSTRUCTION, INC.
DUININCK, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
REMOVING CONC (RIPRAP)
SY 2,346.000 $30.000 $24.650 $22.000 $9.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 6,761.000 $6.000 $4.900 $6.600 $7.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,500.000 $27.410 $39.000 $41.500 $10.000
COMPOST MANUF TOPSOIL (4")
SY 6,000.000 $1.060 $4.400 $2.150 $2.750
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 6,000.000 $0.310 $0.750 $1.050 $0.250
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 6,000.000 $0.150 $0.750 $0.800 $0.250
DRILL SEEDING (TEMP) (WARM)
SY 6,000.000 $0.150 $0.750 $0.800 $0.250
DRILL SEEDING (TEMP) (COOL)
SY 6,000.000 $0.150 $0.750 $0.800 $0.300
VEGETATIVE WATERING
MG 20.000 $45.000 $510.000 $120.000 $25.000
D-GR HMA(SQ) TY-B PG70-28
TON 1,580.000 $150.000 $170.000 $135.000 $105.000
D-GR HMA TY-F SAC-B PG70-28
TON 5,414.000 $90.000 $129.000 $135.000 $105.000
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
TON 22,938.000 $115.000 $137.000 $135.000 $140.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 4,578.000 $35.000 $7.200 $9.350 $50.000
PLANE ASPH CONC PAV (2"-3 1/2")
SY 194,399.000 $1.750 $1.450 $1.750 $4.000
CEM STABIL BKFL
CY 1,366.090 $150.000 $150.000 $215.000 $75.000
CL C CONC (RAIL FOUNDATION)
CY 3,499.000 $600.000 $437.000 $640.000 $600.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 564.000 $100.000 $76.000 $120.000 $150.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 2,254.000 $110.000 $194.000 $230.000 $175.000
RIPRAP (CONC)(4 IN)
CY 587.000 $500.000 $669.000 $535.000 $500.000
RIPRAP (CONC)(6 IN)
CY 28.000 $500.000 $1,064.000 $535.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 265.500 $475.000 $613.000 $510.000 $600.000
RAIL (TY T551)
LF 16,307.000 $50.000 $77.000 $53.500 $70.000
RETROFIT RAIL (TY T551)
LF 2,166.000 $280.000 $199.000 $215.000 $300.000
ARMOR JOINT (SEALED)
LF 2,335.000 $125.000 $279.000 $210.000 $100.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 196.000 $600.000 $213.000 $280.000 $700.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 72.000 $575.000 $248.000 $340.000 $800.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 20.000 $550.000 $296.000 $480.000 $800.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 100.000 $525.000 $323.000 $480.000 $800.000
RC PIPE (CL III)(24 IN)
LF 854.000 $100.000 $80.000 $100.000 $100.000
RC PIPE (CL III)(30 IN)
LF 140.000 $150.000 $106.000 $135.000 $125.000
RC PIPE (CL III)(36 IN)
LF 12.000 $200.000 $202.000 $215.000 $150.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 2.000 $4,000.000 $6,417.000 $6,000.000 $7,500.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
EA 2.000 $4,750.000 $8,188.000 $7,200.000 $7,500.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
EA 2.000 $10,000.000 $8,525.000 $8,800.000 $10,500.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
EA 1.000 $12,500.000 $9,228.000 $8,200.000 $10,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 4.000 $2,488.000 $1,557.000 $1,300.000 $3,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 10.000 $2,357.530 $1,556.000 $1,300.000 $3,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $4,000.000 $2,410.000 $2,700.000 $5,800.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 1.000 $3,800.000 $3,759.000 $3,400.000 $7,000.000
CLEAN EXIST CULVERTS
EA 14.000 $1,800.000 $1,258.000 $4,300.000 $3,000.000
MOBILIZATION
LS 1.000 $1,083,256.000 $1,365,335.000 $1,350,000.000 $1,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 26.000 $8,000.000 $10,730.000 $23,000.000 $10,000.000
SANDBAGS FOR EROSION CONTROL
EA 480.000 $9.000 $6.000 $13.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,090.000 $3.500 $2.700 $5.350 $9.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,090.000 $1.000 $1.200 $1.050 $3.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 110.000 $5.750 $2.750 $5.350 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 110.000 $1.000 $1.100 $1.050 $3.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 4,600.000 $8.000 $8.750 $13.500 $5.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 4,500.000 $5.000 $4.450 $13.000 $9.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 4,600.000 $6.000 $8.750 $13.000 $8.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,902.000 $32.000 $47.000 $26.000 $30.000
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 30.000 $1,600.000 $2,222.000 $2,200.000 $3,000.000
REMOVE METAL BEAM GUARD FENCE
LF 22,196.000 $2.500 $2.400 $2.150 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 57.000 $350.000 $206.000 $265.000 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 30.000 $3,000.000 $3,025.000 $2,700.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 50.000 $405.330 $242.000 $265.000 $500.000
GDRAIL END TRT(INST)(WOOD POST)(TY II)
EA 10.000 $2,518.330 $2,541.000 $3,000.000 $4,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,250.000 $1,815.000 $1,900.000 $3,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $2,500.000 $2,420.000 $1,100.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $2,500.000 $12,098.000 $10,500.000 $12,000.000
CRASH CUSHION ATTEN (INSTALL) (QUAD)(W)
EA 2.000 $10,000.000 $12,098.000 $23,000.000 $25,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $650.000 $968.000 $855.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 1.000 $125.000 $91.000 $105.000 $130.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 126.000 $75.000 $109.000 $96.000 $115.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
EA 6.000 $150.000 $145.000 $130.000 $78.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 82.000 $145.000 $109.000 $96.000 $110.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 28.000 $145.000 $109.000 $96.000 $140.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 16.000 $45.000 $42.000 $37.500 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 14.000 $45.000 $42.000 $37.500 $50.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 61,864.000 $1.000 $0.200 $0.170 $0.500
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 22,692.000 $1.750 $0.300 $0.260 $0.500
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 11,646.000 $1.750 $0.400 $0.340 $1.000
WK ZN PAV MRK NON-REMOV (W)12"(LNDP)
LF 1,154.000 $3.000 $0.600 $0.510 $15.000
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 3,324.000 $4.250 $0.600 $0.510 $15.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 61,864.000 $0.850 $0.200 $0.170 $0.500
WK ZN PAV MRK REMOV (REFL) TY I-A
EA 726.000 $5.000 $4.250 $3.750 $5.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 726.000 $5.000 $4.250 $3.750 $5.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 2,178.000 $3.500 $3.000 $2.650 $4.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 2,178.000 $3.500 $3.000 $2.650 $4.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,000.000 $1.250 $1.150 $1.050 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,893.000 $1.000 $1.050 $0.910 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 30,392.000 $0.210 $0.500 $0.450 $0.500
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 11,346.000 $0.360 $0.750 $0.670 $0.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 45,393.000 $0.210 $0.500 $0.450 $0.300
PREFAB PAV MRK TY C (W) (12") (LNDP)
LF 577.000 $3.750 $13.300 $12.000 $15.000
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 1,662.000 $6.500 $13.300 $12.000 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $275.000 $363.000 $320.000 $300.000
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $400.000 $484.000 $430.000 $600.000
REFL PAV MRKR TY I-C
EA 567.000 $2.190 $3.800 $3.350 $5.000
REFL PAV MRKR TY II-C-R
EA 98.000 $2.160 $3.800 $3.350 $5.000
PAV SURF PREP FOR MRK (12")
LF 2,269.000 $2.000 $0.750 $0.640 $1.000
PAV SURF PREP FOR MRK (ARROW)
EA 6.000 $35.000 $30.000 $26.500 $35.000
PAV SURF PREP FOR MRK (WORD)
EA 6.000 $65.000 $42.000 $37.500 $50.000
FULL - WIDTH MOWING
CYC 2.000 $6,000.000 $23,575.000 $3,200.000 $4,500.000
LITTER REMOVAL
CYC 2.000 $3,250.000 $7,334.000 $3,200.000 $2,000.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 125,527.630 $5.300 $6.700 $5.500 $6.000
ASPH FOR REINF FAB (AC-20-5TR)
GAL 18,833.540 $3.500 $5.500 $3.150 $4.000
EMBEDDED GALVANIC ANODES
EA 1,810.000 $55.000 $24.300 $38.500 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $43,888.000 $13,500.000 $18,000.000
TMA (STATIONARY)
DAY 587.000 $194.570 $383.000 $150.000 $1,200.000
TMA (MOBILE OPERATION)
DAY 21.000 $488.590 $1,886.000 $105.000 $1,500.000
Totals: $12,274,262.129 $13,802,665.941 $14,047,183.126 $15,321,389.790