Show Job Controls
Bid Cobra

LUBBOCK SS 326 (0067-07-099)

Items: 53

County: LUBBOCK
Length: 0.0170 MILES
Highway: SS 326
District: LUBBOCK
Control Number: 0067-07-099
DBE Goal: 0.0%
Project: STP 2025(787)HES
Guaranty: $20,000.00
Time: 38 WORKING DAYS
Engineer's Estimate: $557,394.44
Date: 08/08/2025 (10 months ago) Changed
Contract Number: 6253231
Type: TRAFFIC SIGNAL IMPROVEMENTS
Project ID: A00184233
Contract Type: Federal
Project Description: IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JEREMY DEARING
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$557,394.44
$519,268.95
Over/Under Est: -6.84% -$38,125.49
Over/Under Est: 6.48% $36,142.31
Amt Left: 14.3% $74,267.80
Over/Under Est: 28.99% $161,606.23
Amt Left: 38.46% $199,731.72
Delta: -21.14% -$125,463.92
Over/Under Est: 32.22% $179,615.98
Amt Left: 41.93% $217,741.47
Delta: -2.50% -$18,009.75
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 6.09% $31,623.48
BARRICADES UNLIMITED 1.31% $6,802.42
Total: 7.40% $38,425.90

Bid Items & Bid Tabulations

53 Total 0 of 53
LUBBOCK  |  SS 326  |  LUBBOCK  |  0067-07-099  |  08/08/2025  |  $557,394.44  |  STP 2025(787)HES  |  TRAF SIGNAL IMPRVS  |  38 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
APOLLO CONSTRUCTORS, INC.
VACA UNDERGROUND UTILITIES INC
WG ENGINEERING & CONSTRUCTION, LLC
LONE STAR DIRT & PAVING, LTD.
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 30.000 $427.500 $425.000 $500.000 $685.000 $468.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $712.500 $525.000 $750.000 $975.000 $514.800
MOBILIZATION
LS 1.000 $51,000.000 $50,000.000 $55,000.000 $78,621.070 $70,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $4,750.000 $3,500.000 $5,000.000 $7,628.000 $10,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 152.000 $95.000 $175.000 $50.000 $128.000 $200.000
TMA (STATIONARY)
DAY 76.000 $190.000 $100.000 $50.000 $420.000 $500.000
SANDBAGS FOR EROSION CONTROL
EA 4.000 $47.500 $25.000 $500.000 $28.000 $100.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 30.000 $7.600 $6.350 $50.000 $15.000 $50.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 30.000 $1.900 $1.550 $50.000 $9.000 $20.000
CONDT (PVC) (SCH 80) (2")
LF 860.000 $20.900 $22.500 $20.000 $24.000 $14.890
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,095.000 $28.500 $38.000 $25.000 $32.000 $43.540
CONDT (PVC) (SCH 80) (4")
LF 125.000 $38.000 $45.000 $25.000 $30.000 $22.660
CONDT (PVC) (SCH 80) (4") (BORE)
LF 525.000 $42.750 $50.000 $30.000 $44.000 $63.050
ELEC CONDR (NO.6) BARE
LF 1,645.000 $2.520 $2.500 $3.500 $4.000 $3.420
ELEC CONDR (NO.2) INSULATED
LF 105.000 $5.700 $3.500 $5.250 $5.500 $12.840
GROUND BOX TY A (122311)W/APRON
EA 3.000 $2,327.500 $1,459.000 $2,000.000 $1,520.000 $1,857.380
GROUND BOX TY D (162922)W/APRON
EA 9.000 $2,612.500 $1,850.000 $2,000.000 $2,652.000 $2,106.000
REMOVE GROUND BOX
EA 4.000 $665.000 $350.000 $1,200.000 $465.000 $585.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $1,425.000 $900.000 $1,000.000 $998.000 $292.500
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 1.000 $11,400.000 $8,525.000 $9,500.000 $9,852.000 $8,775.000
ALUMINUM SIGNS (TY A)
SF 278.500 $33.250 $35.000 $50.000 $52.000 $50.000
IN SM RD SN SUP&AM TYS80(1)SB(P-BM)
EA 8.000 $1,140.000 $1,859.000 $1,600.000 $1,500.000 $2,000.000
REMOVE SM RD SN SUP&AM
EA 2.000 $152.000 $350.000 $300.000 $300.000 $1,500.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 6.000 $475.000 $500.000 $625.000 $325.000 $650.000
PREFAB PM TY C (W)(8")(DOT)
LF 551.000 $19.000 $8.500 $10.500 $10.000 $11.050
PREFAB PM TY C (W)(8")(SLD)
LF 1,155.000 $6.890 $7.750 $10.000 $8.000 $10.080
PREFAB PM TY C (W)(12")(SLD)
LF 197.000 $7.360 $12.000 $15.000 $10.000 $15.600
PREFAB PM TY C (W)(24")(SLD)
LF 217.000 $16.630 $17.500 $21.250 $14.000 $22.750
PREFAB PM TY C (W)(ARROW)
EA 10.000 $270.750 $275.000 $340.000 $580.000 $357.500
PREFAB PM TY C (W)(WORD)
EA 4.000 $332.500 $375.000 $500.000 $665.000 $487.500
ELIM EXT PM & MRKS (6")
LF 500.000 $4.750 $2.750 $3.500 $2.200 $3.580
ELIM EXT PM & MRKS (8")
LF 385.000 $5.230 $3.000 $3.750 $3.000 $3.900
ELIM EXT PM & MRKS (24")
LF 210.000 $5.700 $5.500 $4.250 $135.000 $7.150
ELIM EXT PM & MRKS (ARROW)
EA 6.000 $6.180 $150.000 $200.000 $146.000 $195.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $47,500.000 $28,000.000 $80,000.000 $56,550.000 $17,550.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $11,400.000 $7,500.000 $15,000.000 $12,008.000 $32,240.000
VEH SIG SEC (12")LED(GRN)
EA 12.000 $380.000 $375.250 $500.000 $472.000 $502.130
VEH SIG SEC (12")LED(GRN ARW)
EA 6.000 $380.000 $375.250 $500.000 $472.000 $531.380
VEH SIG SEC (12")LED(YEL)
EA 18.000 $380.000 $375.250 $500.000 $472.000 $502.130
VEH SIG SEC (12")LED(YEL ARW)
EA 10.000 $380.000 $375.250 $500.000 $472.000 $502.130
VEH SIG SEC (12")LED(RED)
EA 12.000 $380.000 $375.250 $500.000 $472.000 $502.130
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $380.000 $375.250 $500.000 $472.000 $531.380
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 10.000 $237.500 $225.000 $250.000 $325.000 $359.580
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 4.000 $318.250 $250.000 $275.000 $280.000 $438.750
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 2.000 $332.500 $300.000 $300.000 $398.000 $445.580
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 440.000 $3.610 $3.950 $4.500 $3.000 $5.470
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,405.000 $4.560 $4.150 $5.000 $4.500 $7.200
TRF SIG CBL (TY A)(12 AWG)(20 CONDR)
LF 850.000 $6.180 $7.450 $12.000 $11.000 $19.760
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 3.000 $5,700.000 $4,500.000 $10,000.000 $10,454.000 $7,137.000
INS TRF SIG PL AM(S)1 ARM(44')
EA 2.000 $16,150.000 $16,250.000 $17,000.000 $21,605.000 $29,577.210
INS TRF SIG PL AM(S)1 ARM(50')
EA 1.000 $38,000.000 $35,000.000 $30,000.000 $33,605.000 $51,746.960
INS TRF SIG PL AM(S)1 ARM(55')
EA 1.000 $40,375.000 $37,500.000 $32,000.000 $35,960.600 $53,432.730
INSTALL OF CABLES
LF 1,505.000 $2.850 $2.490 $2.000 $7.000 $2.340
Totals: $557,394.435 $519,268.950 $593,536.750 $719,000.670 $737,010.420
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $6,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $0.01
MATERIALS FURNISHED BY CITY (PART) $70,000.00
Total: $86,000.01