Items: 92

County: LIVE OAK
Length: N/A
Highway: US 59
District: CORPUS CHRISTI
Control Number: 0447-01-063
DBE Goal: N/A
Project: NH 2017(437)
Guaranty: N/A
Time: 187 WORKING DAYS
Engineer's Estimate: $10,630,040.46
Date: 01/04/2017 (9 years ago)
Contract Number: N/A
Type: OVERLAY ROADWAY_(NB & SB)
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$10,630,040.46
$8,991,858.57
Over/Under Est: -15.41% -$1,638,181.89
Over/Under Est: -12.96% -$1,377,559.85
Amt Left: 2.9% $260,622.04
$9,834,345.08
Over/Under Est: -7.49% -$795,695.38
Amt Left: 9.37% $842,486.51
Delta: -6.29% -$581,864.47
Over/Under Est: -4.53% -$481,545.06
Amt Left: 12.86% $1,156,636.83
Delta: -3.19% -$314,150.32

Bid Items & Bid Tabulations

92 Total 0 of 92
LIVE OAK  |  US 59  |  CORPUS CHRISTI  |  0447-01-063  |  01/04/2017  |  $10,630,040.46  |  NH 2017(437)  |  OVERLAY ROADWAY_(NB & SB)  |  187 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
HUNTER INDUSTRIES, LTD.
FOREMOST PAVING, INC.
H. L. ZUMWALT CONSTRUCTION, INC.
REMOVING CONC (RIPRAP)
SY 2,508.000 $20.000 $10.000 $17.670 $15.000 $6.000
REMOVING CONCRETE(MOW STRIP)
LF 16,033.000 $8.000 $2.250 $5.920 $3.000 $8.000
BACKFILL (TY A OR B)
STA 925.000 $145.000 $105.000 $72.750 $150.000 $100.000
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 219,523.000 $2.750 $2.000 $2.360 $3.600 $1.850
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 5,683.000 $80.000 $52.000 $66.860 $60.000 $75.000
D-GR HMA TY B SAC-B PG (64-22)
TON 36,770.000 $70.000 $63.000 $57.950 $71.000 $61.500
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 39,039.000 $75.000 $66.000 $64.410 $70.000 $73.150
PLANE ASPH CONC PAV (1.5")
SY 51,376.000 $1.700 $0.900 $1.440 $1.000 $1.150
PLANE ASPH CONC PAV (7")
SY 17,165.000 $2.500 $3.750 $3.380 $2.900 $3.300
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 17,098.000 $1.500 $0.900 $1.440 $1.000 $1.000
PLANE ASPH CONC PAV (4")
SY 137,094.000 $2.400 $2.000 $2.330 $1.750 $1.500
TRENCH EXCAVATION PROTECTION
LF 2,820.000 $5.000 $2.000 $2.100 $1.000 $4.200
CL C CONC (RAIL FOUNDATION)
CY 395.000 $800.000 $430.000 $435.720 $425.000 $525.000
RIPRAP (CONC)(4 IN)
CY 335.000 $600.000 $405.000 $425.220 $400.000 $430.000
RIPRAP (MOW STRIP)(4 IN)
CY 728.000 $450.000 $460.000 $467.220 $450.000 $450.000
CLEANING AND SEALING EXISTING JOINTS
LF 5,357.000 $30.000 $27.000 $21.640 $22.000 $22.000
RAIL (TY SSTR)
LF 2,820.000 $50.000 $72.000 $73.500 $68.000 $147.000
RETROFIT RAIL (TY SSTR)
LF 332.000 $160.000 $130.000 $125.990 $125.000 $158.000
MOBILIZATION
LS 1.000 $600,000.000 $405,000.000 $696,617.970 $430,000.000 $570,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $5,000.000 $3,500.000 $3,381.690 $6,050.000 $7,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 230.000 $4.500 $5.000 $4.000 $6.000 $8.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 6,130.000 $5.000 $5.750 $4.600 $5.000 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,360.000 $1.000 $1.000 $1.000 $1.000 $1.100
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 5,720.000 $20.000 $24.000 $9.930 $20.000 $60.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 4,290.000 $10.000 $9.000 $10.020 $7.000 $20.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 2,820.000 $10.000 $9.000 $11.220 $12.000 $12.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 5,720.000 $11.000 $9.000 $10.620 $15.000 $15.000
RUMBLE STRIPS (SHOULDER)
LF 172,523.000 $0.150 $0.160 $0.130 $0.130 $0.150
RUMBLE STRIPS (CENTERLINE)
LF 40,985.000 $0.250 $0.210 $0.170 $0.170 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 9,675.000 $18.000 $16.000 $18.300 $18.300 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 46.000 $1,500.000 $1,550.000 $1,725.000 $1,225.000 $1,300.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 11.000 $800.000 $775.000 $719.000 $719.000 $780.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 300.000 $25.000 $20.000 $19.340 $19.340 $20.000
REMOVE METAL BEAM GUARD FENCE
LF 10,880.000 $1.500 $1.000 $0.750 $0.750 $0.800
REMOVE TERMINAL ANCHOR SECTION
EA 13.000 $120.000 $200.000 $50.000 $50.000 $55.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 26.000 $150.000 $200.000 $35.000 $35.000 $40.000
GUARDRAIL END TREATMENT (INSTALL)
EA 79.000 $2,000.000 $1,925.000 $1,849.000 $1,849.000 $1,950.000
GUARDRAIL END TREATMENT (REMOVE)
EA 79.000 $200.000 $200.000 $50.000 $50.000 $55.000
CRASH CUSH ATTEN (INSTL)
EA 7.000 $9,500.000 $8,300.000 $6,880.000 $6,880.000 $7,400.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,500.000 $1,200.000 $950.000 $995.000 $1,000.000
CRASH CUSH ATTEN (REMOVE)
EA 7.000 $900.000 $625.000 $300.000 $300.000 $330.000
ALUMINUM SIGNS (TY A)
SF 127.000 $25.000 $23.000 $22.000 $22.000 $19.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 187.500 $25.000 $29.000 $27.500 $28.000 $19.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 71.000 $500.000 $425.000 $410.000 $410.000 $455.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 86.000 $600.000 $500.000 $475.000 $475.000 $550.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 20.000 $250.000 $750.000 $725.000 $725.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SB(P-BM)
EA 4.000 $700.000 $950.000 $925.000 $925.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SB(U-EXAL)
EA 8.000 $500.000 $1,050.000 $1,025.000 $1,025.000 $1,300.000
REMOVE SM RD SN SUP&AM
EA 185.000 $60.000 $55.000 $55.000 $55.000 $80.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 6.000 $20.000 $21.000 $20.000 $20.000 $17.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 2.000 $850.000 $900.000 $850.000 $850.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 44.000 $50.000 $61.000 $60.000 $60.000 $63.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 27.000 $25.000 $12.250 $12.000 $12.000 $13.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 34.000 $25.000 $12.250 $12.000 $12.000 $13.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 30.000 $55.000 $61.000 $60.000 $60.000 $63.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 27.000 $25.000 $12.250 $12.000 $12.000 $13.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 79.000 $70.000 $61.000 $60.000 $60.000 $63.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 88.000 $50.000 $23.000 $22.500 $22.500 $19.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 36.000 $50.000 $22.000 $21.000 $21.000 $19.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 23.000 $50.000 $22.000 $21.000 $21.000 $19.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 21,761.000 $0.230 $0.190 $0.180 $0.180 $0.180
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 563.000 $0.750 $0.190 $0.180 $0.180 $0.530
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 10,402.000 $0.500 $0.350 $0.350 $0.350 $0.390
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 2,906.000 $1.400 $1.250 $1.200 $1.200 $2.500
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
EA 244.000 $30.000 $1.010 $1.000 $1.000 $29.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 1,266.000 $0.230 $0.190 $0.180 $0.180 $0.180
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 177,068.000 $0.200 $0.190 $0.180 $0.180 $0.150
WK ZN PAV MRK NON-REMOV (Y)8"(SLD)
LF 3,086.000 $0.350 $0.350 $0.350 $0.350 $0.390
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 5,736.000 $1.000 $1.250 $1.200 $1.200 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 13,717.000 $1.000 $0.660 $1.550 $1.000 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 30,413.000 $1.000 $0.660 $1.550 $1.000 $1.250
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 338.000 $0.700 $0.310 $0.300 $0.300 $1.050
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 531.000 $1.250 $0.610 $0.600 $0.600 $1.050
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 16,684.000 $0.700 $0.610 $0.600 $0.600 $0.700
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 2,965.000 $1.000 $0.610 $0.600 $0.600 $0.700
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 17,881.000 $0.300 $0.290 $0.280 $0.280 $0.320
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 141,138.000 $0.300 $0.290 $0.280 $0.280 $0.300
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 828.000 $0.300 $0.290 $0.280 $0.280 $0.320
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 140,963.000 $0.300 $0.290 $0.280 $0.280 $0.300
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 2,004.000 $12.000 $12.250 $12.000 $12.000 $12.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 72.000 $200.000 $205.000 $200.000 $200.000 $190.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 9.000 $350.000 $305.000 $300.000 $300.000 $355.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 6.000 $500.000 $455.000 $450.000 $450.000 $385.000
PREFAB PAV MRK TY C (W) (WORD)
EA 72.000 $250.000 $275.000 $270.000 $270.000 $230.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 122.000 $15.000 $14.500 $14.250 $14.250 $38.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 5,649.000 $12.000 $12.250 $12.000 $12.000 $12.000
REFL PAV MRKR TY I-C
EA 421.000 $3.000 $3.050 $3.000 $3.000 $4.200
REFL PAV MRKR TY II-A-A
EA 1,816.000 $2.500 $3.050 $3.000 $3.000 $3.500
REFL PAV MRKR TY II-C-R
EA 1,286.000 $3.000 $3.050 $3.000 $3.000 $3.500
POST AND CABLE FENCE (NEW INSTALLATION)
LF 750.000 $20.000 $11.500 $12.990 $13.000 $15.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 200.000 $85.000 $56.000 $59.540 $70.000 $70.000
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 292.000 $60.000 $46.000 $45.000 $45.000 $70.000
Totals: $10,630,040.460 $8,991,858.570 $9,252,480.610 $9,834,345.080 $10,148,495.400