PREPARING ROW
|
STA
|
490.900
|
$1,900.000
|
$400.000
|
$500.000
|
$191.000
|
$570.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
55.000
|
$7.000
|
$22.000
|
$25.000
|
$9.650
|
$80.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
1,939.000
|
$12.000
|
$39.000
|
$25.000
|
$13.850
|
$11.000
|
|
|
|
BACKFILL (TY A OR B)
|
STA
|
431.000
|
$143.100
|
$90.000
|
$150.000
|
$99.150
|
$120.000
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
284,824.000
|
$0.120
|
$0.010
|
$0.110
|
$0.150
|
$0.150
|
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
142,412.000
|
$0.070
|
$0.010
|
$0.060
|
$0.130
|
$0.150
|
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
142,412.000
|
$0.070
|
$0.010
|
$0.060
|
$0.130
|
$0.150
|
|
|
|
VEGETATIVE WATERING
|
MG
|
4,625.500
|
$9.030
|
$1.000
|
$1.000
|
$1.000
|
$8.000
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
27,756.000
|
$1.200
|
$0.800
|
$1.000
|
$1.210
|
$1.300
|
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
1,370.000
|
$34.920
|
$35.000
|
$45.000
|
$33.650
|
$60.000
|
|
|
|
FOG SEAL (SS-1)
|
GAL
|
17,803.000
|
$3.000
|
$3.350
|
$3.000
|
$3.400
|
$3.800
|
|
|
|
ASPH (CRS-2)
|
GAL
|
43,313.000
|
$2.660
|
$3.000
|
$2.250
|
$2.750
|
$3.400
|
|
|
|
AGGR (TY-D GR-5 OR TY-L GR-5)
|
CY
|
1,237.000
|
$70.000
|
$178.000
|
$95.000
|
$113.400
|
$100.000
|
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
438.000
|
$110.000
|
$82.000
|
$75.000
|
$86.150
|
$88.000
|
|
|
|
D-GR HMA TY-C SAC-B PG64-22
|
TON
|
19,936.000
|
$65.000
|
$78.500
|
$72.000
|
$69.700
|
$78.000
|
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
9,932.000
|
$1.340
|
$1.200
|
$2.000
|
$1.100
|
$2.200
|
|
|
|
CEM STABIL BKFL
|
CY
|
319.000
|
$63.540
|
$136.000
|
$125.000
|
$144.000
|
$140.000
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
493.000
|
$75.000
|
$10.000
|
$100.000
|
$10.500
|
$165.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
195.000
|
$1.920
|
$6.000
|
$10.000
|
$6.350
|
$22.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,468.000
|
$9.000
|
$16.000
|
$25.000
|
$16.850
|
$50.000
|
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
52.500
|
$350.000
|
$168.000
|
$250.000
|
$177.000
|
$83.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
21.000
|
$367.920
|
$395.000
|
$400.000
|
$415.000
|
$500.000
|
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
298.000
|
$101.420
|
$130.000
|
$100.000
|
$137.000
|
$110.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
191.000
|
$440.180
|
$395.000
|
$450.000
|
$415.000
|
$720.000
|
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
168.000
|
$75.580
|
$46.000
|
$75.000
|
$46.500
|
$55.000
|
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
120.000
|
$167.410
|
$308.960
|
$200.000
|
$395.000
|
$166.000
|
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
220.000
|
$171.370
|
$280.000
|
$375.000
|
$295.000
|
$440.000
|
|
|
|
CONC BOX CULV (8 FT X 6 FT)
|
LF
|
100.000
|
$443.000
|
$657.000
|
$675.000
|
$690.000
|
$990.000
|
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
32.000
|
$582.050
|
$562.000
|
$750.000
|
$590.000
|
$825.000
|
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
32.000
|
$650.000
|
$602.000
|
$850.000
|
$635.000
|
$935.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,644.000
|
$50.650
|
$48.000
|
$55.000
|
$50.500
|
$55.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
192.000
|
$52.820
|
$63.000
|
$75.000
|
$66.300
|
$121.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
24.000
|
$71.020
|
$85.000
|
$115.000
|
$90.000
|
$160.000
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
58.000
|
$92.830
|
$119.000
|
$135.000
|
$165.000
|
$195.800
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$5,500.000
|
$8,019.000
|
$5,000.000
|
$8,440.000
|
$9,350.000
|
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$33,000.000
|
$31,000.000
|
$40,000.000
|
$32,630.000
|
$31,900.000
|
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$11,500.000
|
$9,423.000
|
$8,000.000
|
$9,920.000
|
$8,800.000
|
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$14,500.000
|
$10,342.000
|
$14,000.000
|
$10,855.000
|
$12,100.000
|
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$19,000.000
|
$11,481.000
|
$20,000.000
|
$12,085.000
|
$18,700.000
|
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
5.000
|
$23,500.000
|
$15,000.000
|
$27,500.000
|
$15,790.000
|
$22,000.000
|
|
|
|
SET (TY I) (36 IN) (3: 1) (C)
|
EA
|
3.000
|
$7,350.000
|
$8,015.000
|
$5,250.000
|
$8,440.000
|
$7,150.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$6,605.260
|
$8,741.000
|
$4,000.000
|
$9,200.000
|
$8,250.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
3.000
|
$8,000.000
|
$9,063.000
|
$5,500.000
|
$9,540.000
|
$8,800.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
2.000
|
$8,274.850
|
$11,062.000
|
$9,500.000
|
$11,645.000
|
$12,650.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$462.400
|
$900.000
|
$800.000
|
$950.000
|
$935.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
124.000
|
$710.000
|
$975.000
|
$900.000
|
$1,025.000
|
$1,045.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$794.380
|
$980.000
|
$1,000.000
|
$1,030.000
|
$990.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,040.000
|
$1,113.000
|
$1,050.000
|
$1,170.000
|
$1,100.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,302.000
|
$1,425.000
|
$1,600.000
|
$1,500.000
|
$3,850.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,430.000
|
$3,012.000
|
$2,000.000
|
$3,170.000
|
$4,400.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
17.000
|
$2,572.830
|
$1,440.000
|
$1,750.000
|
$1,515.000
|
$1,650.000
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
9.000
|
$1,500.000
|
$1,110.000
|
$1,500.000
|
$1,170.000
|
$1,650.000
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
8.000
|
$2,500.000
|
$1,110.000
|
$1,500.000
|
$1,170.000
|
$1,650.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
1,189.000
|
$10.760
|
$9.000
|
$15.000
|
$9.500
|
$33.000
|
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
46.000
|
$32.320
|
$217.000
|
$100.000
|
$230.000
|
$220.000
|
|
|
|
SALV MATRL (CREDIT ITEM)
|
LS
|
1.000
|
$1.000
|
$1.000
|
$0.010
|
$1.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$603,000.000
|
$646,010.000
|
$700,000.000
|
$444,805.000
|
$800,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$5,000.000
|
$800.000
|
$8,500.000
|
$4,271.000
|
$6,500.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
5,200.000
|
$25.000
|
$30.000
|
$26.000
|
$28.420
|
$30.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
5,200.000
|
$4.710
|
$10.000
|
$5.000
|
$9.470
|
$10.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
852.000
|
$21.770
|
$31.250
|
$10.000
|
$17.890
|
$15.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
852.000
|
$6.640
|
$9.220
|
$3.000
|
$8.420
|
$5.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
22,882.000
|
$2.730
|
$1.900
|
$3.000
|
$2.890
|
$3.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
22,882.000
|
$0.460
|
$0.500
|
$0.500
|
$0.790
|
$0.700
|
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
3.000
|
$4,036.090
|
$5,500.000
|
$7,500.000
|
$2,600.000
|
$9,000.000
|
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
360.000
|
$10.000
|
$16.400
|
$25.000
|
$20.950
|
$35.000
|
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
2,070.000
|
$10.000
|
$14.000
|
$15.000
|
$16.900
|
$35.000
|
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
360.000
|
$8.000
|
$15.200
|
$25.000
|
$19.750
|
$35.000
|
|
|
|
INTERSECTIONS (ACP)
|
SY
|
3,021.000
|
$35.000
|
$15.600
|
$25.000
|
$27.000
|
$20.000
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
156.000
|
$70.060
|
$90.000
|
$90.000
|
$94.750
|
$140.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
10,106.000
|
$28.570
|
$26.000
|
$17.000
|
$25.800
|
$18.000
|
|
|
|
TURNOUTS (ACP)
|
SY
|
1,077.000
|
$32.710
|
$37.150
|
$25.000
|
$27.100
|
$18.000
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,450.000
|
$23.000
|
$22.820
|
$25.000
|
$26.320
|
$24.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,946.540
|
$1,975.560
|
$1,750.000
|
$2,642.030
|
$1,700.000
|
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
4.000
|
$1,500.000
|
$1,265.600
|
$1,000.000
|
$1,263.120
|
$1,100.000
|
|
|
|
TRANSITION ADJUSTMENT
|
EA
|
1.000
|
$225.000
|
$399.250
|
$550.000
|
$894.710
|
$600.000
|
|
|
|
SHORT RADIUS
|
LF
|
22.000
|
$40.000
|
$25.190
|
$25.000
|
$73.680
|
$25.000
|
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$870.000
|
$992.050
|
$525.000
|
$1,105.230
|
$578.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,512.000
|
$2.730
|
$2.000
|
$3.000
|
$3.950
|
$3.500
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
21.000
|
$2,537.000
|
$2,830.000
|
$2,750.000
|
$2,605.190
|
$2,800.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
40.000
|
$1,500.000
|
$1,750.000
|
$1,500.000
|
$1,735.000
|
$2,200.000
|
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
12.000
|
$1,000.000
|
$1,250.000
|
$1,000.000
|
$1,365.000
|
$2,200.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
12.000
|
$14,000.000
|
$13,425.000
|
$14,000.000
|
$12,710.000
|
$18,000.000
|
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
60.000
|
$200.000
|
$200.000
|
$200.000
|
$205.260
|
$220.000
|
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
5.000
|
$261.110
|
$225.000
|
$250.000
|
$226.310
|
$240.000
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
2.000
|
$500.000
|
$450.000
|
$350.000
|
$368.410
|
$390.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
82.000
|
$463.780
|
$400.000
|
$400.000
|
$399.990
|
$420.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
12.000
|
$500.000
|
$450.000
|
$450.000
|
$473.670
|
$500.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$515.810
|
$450.000
|
$500.000
|
$499.990
|
$520.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
5.000
|
$552.830
|
$550.000
|
$550.000
|
$552.620
|
$580.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
|
EA
|
2.000
|
$700.770
|
$700.000
|
$600.000
|
$621.040
|
$650.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$759.110
|
$600.000
|
$650.000
|
$652.610
|
$680.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$799.800
|
$700.000
|
$700.000
|
$736.820
|
$780.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
11.000
|
$700.000
|
$800.000
|
$800.000
|
$842.080
|
$900.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
106.000
|
$72.210
|
$100.000
|
$50.000
|
$47.370
|
$50.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
38.000
|
$70.670
|
$71.500
|
$60.000
|
$61.050
|
$65.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
24.000
|
$36.680
|
$25.950
|
$30.000
|
$30.530
|
$40.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
132.000
|
$0.200
|
$5.000
|
$2.000
|
$5.250
|
$2.200
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
132.000
|
$0.210
|
$5.000
|
$2.000
|
$5.250
|
$2.200
|
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
184.000
|
$10.000
|
$45.000
|
$15.000
|
$47.400
|
$13.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
9,800.000
|
$0.900
|
$0.900
|
$1.000
|
$1.000
|
$0.600
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,335.000
|
$0.770
|
$0.650
|
$2.000
|
$0.680
|
$1.820
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
230.000
|
$4.960
|
$11.850
|
$7.000
|
$12.500
|
$7.700
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
320.000
|
$0.550
|
$0.900
|
$3.000
|
$0.950
|
$3.300
|
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
99,837.000
|
$0.600
|
$0.690
|
$0.700
|
$0.730
|
$0.720
|
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
6,330.000
|
$0.710
|
$0.740
|
$0.750
|
$0.780
|
$0.830
|
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
69,640.000
|
$0.600
|
$0.700
|
$0.700
|
$0.740
|
$0.720
|
|
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
2.000
|
$475.000
|
$600.000
|
$575.000
|
$632.000
|
$610.500
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
64.000
|
$4.000
|
$8.000
|
$4.500
|
$8.450
|
$4.950
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,153.000
|
$4.000
|
$4.250
|
$4.500
|
$4.500
|
$4.950
|
|
|
|
EMULSION
|
GAL
|
784,143.000
|
$1.210
|
$0.000
|
$0.000
|
$2.260
|
$2.200
|
|
|
|
CEMENT
|
TON
|
886.000
|
$149.460
|
$0.000
|
$0.000
|
$255.000
|
$158.000
|
|
|
|
EMUL TRTMNT (MX EXST MTRL)10"
|
SY
|
187,594.000
|
$4.000
|
$0.000
|
$0.000
|
$1.720
|
$4.200
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$5,125.000
|
$6,500.000
|
$10,000.000
|
$2,500.000
|
$14,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
170.000
|
$190.000
|
$250.000
|
$150.000
|
$425.000
|
$500.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
144.000
|
$40.000
|
$45.000
|
$50.000
|
$65.700
|
$90.000
|
|
1
|
|
CEMENT
|
TON
|
886.000
|
$149.460
|
$150.000
|
$190.000
|
$0.000
|
$0.000
|
|
1
|
|
FOAMED ASPHALT TREAT (10")(DC)
|
SY
|
187,594.000
|
$4.000
|
$3.150
|
$3.510
|
$0.000
|
$0.000
|
|
1
|
|
ASPHALT BINDER (PG64-22)
|
TON
|
2,110.000
|
$450.240
|
$435.000
|
$450.000
|
$0.000
|
$0.000
|
|
Totals: |
$9,490,246.695
|
$7,107,480.070
|
$7,287,478.670
|
$7,427,957.090
|
$9,067,069.690
|