PREPARING ROW
|
STA
|
26.000
|
$1,500.000
|
$1,500.000
|
$1,000.000
|
$455.000
|
$4,000.000
|
$2,127.260
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
84.000
|
$20.000
|
$15.000
|
$20.000
|
$8.000
|
$25.000
|
$9.100
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
11,495.000
|
$5.000
|
$5.000
|
$6.000
|
$7.000
|
$5.500
|
$7.140
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
18,562.000
|
$3.000
|
$5.000
|
$6.000
|
$4.200
|
$5.500
|
$3.300
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,233.000
|
$10.000
|
$15.000
|
$20.000
|
$35.000
|
$12.000
|
$10.420
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
13,645.000
|
$8.000
|
$15.000
|
$12.000
|
$7.000
|
$15.000
|
$8.710
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
84,540.000
|
$0.800
|
$0.500
|
$0.100
|
$0.100
|
$0.700
|
$1.660
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
84,540.000
|
$0.200
|
$0.100
|
$0.090
|
$0.110
|
$0.100
|
$0.150
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
42,270.000
|
$0.200
|
$0.080
|
$0.070
|
$0.060
|
$0.100
|
$0.080
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
42,270.000
|
$0.200
|
$0.080
|
$0.070
|
$0.060
|
$0.100
|
$0.080
|
|
|
VEGETATIVE WATERING
|
MG
|
1,370.000
|
$10.000
|
$5.000
|
$10.000
|
$6.250
|
$14.000
|
$48.510
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
2,945.000
|
$1.600
|
$2.000
|
$1.200
|
$1.000
|
$2.500
|
$1.230
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
10,106.000
|
$37.000
|
$35.000
|
$30.850
|
$39.000
|
$51.000
|
$64.830
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
1,145.000
|
$180.000
|
$160.000
|
$155.000
|
$166.000
|
$150.000
|
$230.820
|
|
|
LIME TRT (SUBGRADE)(12")
|
SY
|
42,389.000
|
$2.500
|
$3.000
|
$2.250
|
$4.200
|
$3.500
|
$5.540
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
7,538.000
|
$2.750
|
$3.500
|
$3.350
|
$3.400
|
$5.500
|
$3.590
|
|
|
ASPH(AC-15P,AC-20XP,AC10-2TR,AC-12-5TR)
|
GAL
|
146,442.000
|
$3.000
|
$3.000
|
$2.650
|
$3.100
|
$4.000
|
$3.270
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
3,349.000
|
$130.000
|
$75.000
|
$96.000
|
$106.000
|
$120.000
|
$111.850
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
5,357.000
|
$50.000
|
$58.000
|
$62.750
|
$68.000
|
$65.000
|
$79.140
|
|
|
D-GR HMA TY-D PG64-22(LEVEL-UP)
|
TON
|
28,766.000
|
$60.000
|
$56.000
|
$67.750
|
$73.000
|
$63.000
|
$79.140
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
1,566.000
|
$90.000
|
$95.000
|
$94.500
|
$110.000
|
$106.000
|
$126.620
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
21,449.000
|
$90.000
|
$95.000
|
$94.500
|
$110.000
|
$106.000
|
$126.620
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
500.000
|
$35.000
|
$40.000
|
$56.000
|
$54.000
|
$65.000
|
$25.060
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
33.000
|
$6.000
|
$15.000
|
$50.000
|
$27.750
|
$25.000
|
$131.890
|
|
|
PLANE ASPH CONC PAV (0" TO 4 1/2")
|
SY
|
4,060.000
|
$15.000
|
$3.000
|
$9.500
|
$4.750
|
$2.500
|
$3.590
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
1,128.000
|
$25.000
|
$50.000
|
$29.000
|
$26.680
|
$31.000
|
$38.910
|
|
|
CEM STABIL BKFL
|
CY
|
7.000
|
$500.000
|
$250.000
|
$194.000
|
$200.000
|
$230.000
|
$263.790
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,868.000
|
$15.000
|
$20.000
|
$16.650
|
$23.000
|
$24.000
|
$30.340
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
37.000
|
$195.000
|
$350.000
|
$250.000
|
$133.000
|
$150.000
|
$263.790
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
169.000
|
$450.000
|
$300.000
|
$395.000
|
$191.520
|
$450.000
|
$659.470
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
583.000
|
$105.000
|
$100.000
|
$112.000
|
$130.000
|
$125.000
|
$171.460
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
842.000
|
$375.000
|
$400.000
|
$387.000
|
$485.000
|
$520.000
|
$692.450
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
1,128.000
|
$24.000
|
$40.000
|
$27.000
|
$24.620
|
$28.000
|
$36.170
|
|
|
CLEANING AND SEALING JOINTS (CL 3)
|
LF
|
564.000
|
$30.000
|
$40.000
|
$27.000
|
$24.620
|
$28.000
|
$45.310
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
22.000
|
$600.000
|
$600.000
|
$359.000
|
$350.000
|
$1,000.000
|
$461.630
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
5.000
|
$2,000.000
|
$650.000
|
$459.000
|
$425.000
|
$1,100.000
|
$560.550
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
19.000
|
$750.000
|
$700.000
|
$470.000
|
$525.000
|
$850.000
|
$692.450
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
56.000
|
$2,000.000
|
$750.000
|
$547.000
|
$475.000
|
$850.000
|
$626.500
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
14.000
|
$650.000
|
$800.000
|
$617.000
|
$600.000
|
$1,100.000
|
$791.370
|
|
|
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
|
LF
|
102.000
|
$1,000.000
|
$900.000
|
$465.000
|
$500.000
|
$1,100.000
|
$659.470
|
|
|
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
|
LF
|
3.000
|
$775.000
|
$1,000.000
|
$1,578.000
|
$1,000.000
|
$2,500.000
|
$1,318.950
|
|
|
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
|
LF
|
17.000
|
$900.000
|
$1,500.000
|
$1,029.000
|
$740.000
|
$1,700.000
|
$976.020
|
|
|
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
|
LF
|
3.000
|
$3,500.000
|
$2,000.000
|
$1,353.000
|
$1,660.000
|
$3,800.000
|
$2,189.450
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
76.000
|
$75.000
|
$70.000
|
$62.500
|
$60.000
|
$65.000
|
$79.140
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
3.000
|
$25,000.000
|
$30,000.000
|
$33,300.000
|
$20,000.000
|
$30,000.000
|
$26,378.970
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
3.000
|
$8,000.000
|
$6,200.000
|
$4,340.000
|
$3,500.000
|
$7,500.000
|
$4,616.320
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$15,000.000
|
$9,000.000
|
$6,390.000
|
$4,900.000
|
$12,000.000
|
$6,462.850
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$10,300.000
|
$12,500.000
|
$9,070.000
|
$7,000.000
|
$16,000.000
|
$9,232.640
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
4.000
|
$22,000.000
|
$15,200.000
|
$9,750.000
|
$11,000.000
|
$19,000.000
|
$14,508.440
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
5.000
|
$27,000.000
|
$24,000.000
|
$19,700.000
|
$16,000.000
|
$24,000.000
|
$21,103.180
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
4.000
|
$5,000.000
|
$5,600.000
|
$6,400.000
|
$4,850.000
|
$7,500.000
|
$6,396.900
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
2.000
|
$6,000.000
|
$9,400.000
|
$8,850.000
|
$3,600.000
|
$10,000.000
|
$4,748.220
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$7,500.000
|
$11,300.000
|
$9,950.000
|
$5,200.000
|
$21,000.000
|
$6,858.530
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$8,000.000
|
$8,200.000
|
$8,900.000
|
$5,900.000
|
$10,000.000
|
$7,781.800
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$9,000.000
|
$14,000.000
|
$11,250.000
|
$8,000.000
|
$16,000.000
|
$10,551.590
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$7,000.000
|
$11,100.000
|
$9,700.000
|
$7,000.000
|
$9,500.000
|
$9,232.640
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$9,000.000
|
$13,250.000
|
$11,600.000
|
$8,000.000
|
$16,000.000
|
$10,551.590
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,000.000
|
$1,000.000
|
$1,050.000
|
$800.000
|
$950.000
|
$1,055.160
|
|
|
REMOV STR (PIPE)
|
LF
|
85.000
|
$10.000
|
$12.000
|
$9.250
|
$10.000
|
$40.000
|
$13.190
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$500,000.000
|
$635,000.000
|
$636,000.000
|
$487,800.000
|
$950,000.000
|
$869,137.200
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$5,000.000
|
$4,000.000
|
$9,550.000
|
$10,200.000
|
$10,000.000
|
$2,350.130
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,976.000
|
$30.000
|
$20.000
|
$27.500
|
$31.000
|
$32.000
|
$39.170
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
40.000
|
$50.000
|
$40.000
|
$46.000
|
$65.000
|
$50.000
|
$79.300
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,016.000
|
$7.500
|
$3.000
|
$9.000
|
$7.000
|
$5.000
|
$16.680
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
78.000
|
$30.000
|
$10.000
|
$8.000
|
$25.050
|
$22.000
|
$28.980
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
78.000
|
$10.000
|
$3.000
|
$1.500
|
$7.000
|
$4.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
12,591.000
|
$3.000
|
$3.000
|
$3.500
|
$2.750
|
$3.000
|
$3.300
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
12,591.000
|
$0.400
|
$0.500
|
$0.750
|
$0.500
|
$0.800
|
$1.980
|
|
|
DRIVEWAYS (CONC)
|
SY
|
84.000
|
$85.000
|
$85.000
|
$90.000
|
$70.000
|
$160.000
|
$112.110
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
2,952.000
|
$10.000
|
$10.000
|
$29.000
|
$14.000
|
$12.000
|
$14.770
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
1,974.000
|
$30.000
|
$25.000
|
$43.000
|
$40.250
|
$30.000
|
$32.710
|
|
|
INTERSECTIONS (ACP) (TYPE 1)
|
SY
|
744.000
|
$15.000
|
$20.000
|
$48.000
|
$28.150
|
$22.000
|
$32.710
|
|
|
INTERSECTIONS (ACP) (TYPE 2)
|
SY
|
286.000
|
$60.000
|
$50.000
|
$63.000
|
$53.550
|
$65.000
|
$47.480
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
72,623.000
|
$0.170
|
$0.170
|
$0.320
|
$0.130
|
$0.150
|
$0.170
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
11,288.000
|
$19.000
|
$30.000
|
$22.900
|
$22.150
|
$25.000
|
$29.020
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
24.000
|
$1,600.000
|
$2,000.000
|
$2,175.000
|
$1,784.000
|
$1,800.000
|
$1,978.420
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
6.000
|
$1,100.000
|
$1,500.000
|
$1,145.000
|
$1,323.000
|
$1,300.000
|
$1,450.840
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,020.000
|
$1,500.000
|
$885.000
|
$1,119.000
|
$970.000
|
$1,305.760
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
12,275.000
|
$1.600
|
$2.000
|
$3.100
|
$1.500
|
$4.000
|
$2.310
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
24.000
|
$375.000
|
$150.000
|
$234.000
|
$100.000
|
$250.000
|
$197.840
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
8.000
|
$180.000
|
$150.000
|
$234.000
|
$100.000
|
$250.000
|
$197.840
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
65.000
|
$2,000.000
|
$3,000.000
|
$2,470.000
|
$2,727.000
|
$2,700.000
|
$3,165.480
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
56.000
|
$300.000
|
$150.000
|
$234.000
|
$125.000
|
$250.000
|
$263.790
|
|
|
WIRE FENCE (WATER GAP)
|
LF
|
198.000
|
$500.000
|
$50.000
|
$25.000
|
$105.000
|
$25.000
|
$60.870
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$350.000
|
$400.000
|
$465.000
|
$450.000
|
$300.000
|
$329.740
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
19.000
|
$160.000
|
$150.000
|
$182.000
|
$175.000
|
$280.000
|
$329.740
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
2.000
|
$180.000
|
$200.000
|
$187.000
|
$180.000
|
$290.000
|
$296.760
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
|
EA
|
37.000
|
$800.000
|
$700.000
|
$625.000
|
$600.000
|
$770.000
|
$916.670
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
114.000
|
$320.000
|
$300.000
|
$312.000
|
$300.000
|
$420.000
|
$494.610
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
7.000
|
$450.000
|
$400.000
|
$364.000
|
$350.000
|
$450.000
|
$527.580
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
157.000
|
$90.000
|
$50.000
|
$100.000
|
$100.000
|
$75.000
|
$85.730
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
15.000
|
$220.000
|
$300.000
|
$185.000
|
$175.000
|
$200.000
|
$230.820
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
15.000
|
$60.000
|
$75.000
|
$52.000
|
$65.700
|
$60.000
|
$72.540
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
68.000
|
$52.000
|
$77.000
|
$62.000
|
$68.250
|
$70.000
|
$79.140
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
168.000
|
$38.000
|
$30.000
|
$21.000
|
$30.000
|
$25.000
|
$26.380
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
11,956.000
|
$1.000
|
$1.000
|
$0.500
|
$0.900
|
$0.600
|
$0.790
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,856.000
|
$1.000
|
$1.000
|
$1.400
|
$0.900
|
$0.600
|
$0.540
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
210.000
|
$1.100
|
$7.000
|
$2.050
|
$2.000
|
$6.000
|
$2.640
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
21.000
|
$1.000
|
$15.000
|
$4.150
|
$4.000
|
$12.000
|
$2.640
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
666.000
|
$0.650
|
$1.500
|
$0.880
|
$0.850
|
$1.000
|
$2.640
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
2,255.000
|
$7.000
|
$5.000
|
$1.550
|
$1.500
|
$5.000
|
$6.990
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
5,570.000
|
$0.300
|
$0.500
|
$0.360
|
$0.350
|
$0.400
|
$0.660
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
159,449.000
|
$0.300
|
$0.350
|
$0.330
|
$0.320
|
$0.300
|
$0.530
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
16,834.000
|
$0.300
|
$0.370
|
$0.360
|
$0.350
|
$0.400
|
$0.660
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
72,089.000
|
$0.300
|
$0.300
|
$0.330
|
$0.320
|
$0.320
|
$0.530
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
12.000
|
$150.000
|
$25.000
|
$285.000
|
$275.000
|
$230.000
|
$336.330
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
6.000
|
$450.000
|
$400.000
|
$675.000
|
$650.000
|
$400.000
|
$540.770
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$260.000
|
$300.000
|
$415.000
|
$400.000
|
$290.000
|
$501.200
|
|
REFL PAV MRKR TY I-C
|
EA
|
328.000
|
$4.000
|
$5.000
|
$5.200
|
$5.000
|
$3.500
|
$5.540
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,431.000
|
$4.000
|
$3.000
|
$4.050
|
$3.900
|
$3.200
|
$5.540
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$2,000.000
|
$4,000.000
|
$4,000.000
|
$5,245.000
|
$4,200.000
|
$3,261.010
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$7,500.000
|
$9,500.000
|
$8,120.000
|
$7,500.000
|
$15,827.380
|
|
|
TMA (STATIONARY)
|
DAY
|
130.000
|
$100.000
|
$150.000
|
$250.000
|
$255.000
|
$280.000
|
$239.810
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
330.000
|
$75.000
|
$50.000
|
$45.000
|
$25.000
|
$60.000
|
$37.470
|
|
Totals: |
$9,120,813.810
|
$9,187,964.040
|
$9,417,348.870
|
$9,835,872.710
|
$10,921,124.930
|
$12,179,800.000
|