Show Job Controls
Bid Cobra

LIBERTY SH 105 (0951-01-068)

Items: 42

County: LIBERTY
Length: N/A
Highway: SH 105
District: BEAUMONT
Control Number: 0951-01-068
DBE Goal: N/A
Project: F 2023(742)
Guaranty: N/A
Time: 51 WORKING DAYS
Engineer's Estimate: $2,911,923.79
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
ROBERTO M RODRIGUEZ
NYEMB NYEMB
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,911,923.79
$1,980,516.24
Over/Under Est: -31.99% -$931,407.55
Over/Under Est: -24.89% -$724,843.75
Amt Left: 10.43% $206,563.80
Over/Under Est: -24.52% -$713,954.56
Amt Left: 10.98% $217,452.99
Delta: -0.50% -$10,889.19
Subcontractor Percentage Amount
WILLOW CITY SIGN & RAIL, INC. 2.28% $51,240.20
SEMPER STRIPING LLC 1.46% $32,811.71
CEN TEX HYDROSEED, INC. 0.83% $18,653.23
USA AMTECH, INC. 0.38% $8,540.03
CPAVE, INC. 0.28% $6,292.66
TRAFFIC SIGNS & LINES, LLC 0.28% $6,292.66
Total: 5.51% $123,830.49

Bid Items & Bid Tabulations

42 Total 0 of 42
LIBERTY  |  SH 105  |  BEAUMONT  |  0951-01-068  |  05/04/2023  |  $2,911,923.79  |  F 2023(742)  |  SURF/ROADWAY RESTOR  |  51 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
BACKFILL (TY A OR B)
STA 199.500 $502.000 $293.000 $409.350 $375.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 16,220.000 $0.600 $0.400 $0.520 $0.480
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 28,110.000 $0.500 $0.400 $0.520 $0.480
VEGETATIVE WATERING
MG 372.660 $120.000 $30.350 $25.000 $10.000
PLANE ASPH CONC PAV(0" TO 2")
SY 488.000 $33.100 $25.750 $30.070 $9.500
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 30.000 $310.000 $500.000 $1,071.550 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 44.000 $865.000 $778.000 $1,292.320 $1,200.000
MOBILIZATION
LS 1.000 $380,000.000 $106,000.000 $182,287.890 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $7,000.000 $751.000 $6,294.690 $5,000.000
RUMBLE STRIPS (SHOULDER)
LF 39,900.000 $3.150 $0.060 $0.060 $0.150
RUMBLE STRIPS (CENTERLINE)
LF 19,950.000 $5.100 $0.080 $0.090 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $27.000 $24.500 $24.500 $25.000
MTL BEAM GD FEN TRANS (T101)
EA 4.000 $900.000 $1,835.000 $1,841.560 $1,310.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $2.500 $2.150 $2.150 $4.000
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $145.000 $161.000 $161.540 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,990.000 $3,059.000 $3,069.270 $2,860.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $290.000 $161.000 $161.540 $250.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 11.000 $350.000 $327.350 $328.470 $290.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $610.000 $698.000 $700.010 $670.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $1,005.000 $520.500 $522.310 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $716.000 $655.000 $656.930 $711.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,000.000 $896.000 $899.240 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $975.000 $798.000 $980.010 $1,065.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 28.000 $32.000 $27.000 $26.920 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 38.000 $54.000 $37.500 $37.690 $31.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 10.000 $124.000 $134.000 $134.620 $66.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,146.000 $4.740 $0.700 $2.260 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,074.000 $1.750 $0.700 $1.060 $1.000
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 1,930.000 $0.750 $0.430 $0.430 $0.400
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 42,290.000 $0.750 $0.420 $0.420 $0.390
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 2,230.000 $0.750 $0.430 $0.430 $0.400
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 27,271.000 $0.750 $0.420 $0.420 $0.390
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 38.000 $15.700 $13.500 $13.460 $12.500
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $337.000 $268.000 $269.230 $250.000
REFL PAV MRKR TY I-C
EA 98.000 $6.700 $4.300 $4.310 $4.000
REFL PAV MRKR TY II-A-A
EA 443.000 $8.100 $4.300 $4.310 $4.000
PAV SURF PREP FOR MRK (6")
LF 5,472.000 $0.750 $0.020 $0.020 $0.020
SP MIXES SP-C SAC-A PG76-22
TON 12,156.000 $151.000 $130.500 $132.750 $138.000
TACK COAT
GAL 6,630.000 $7.300 $2.650 $4.650 $4.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 40.000 $17.000 $21.000 $21.000 $20.000
TMA (STATIONARY)
DAY 28.000 $258.000 $178.000 $537.760 $125.000
TMA (MOBILE OPERATION)
DAY 26.000 $511.000 $594.000 $25.000 $125.000
Totals: $2,911,923.790 $1,980,516.241 $2,187,080.045 $2,197,969.230