LIBERTY US 59 (0177-03-109)

Items: 42

County: LIBERTY
Length: 0.0000 MILES
Highway: US 59
District: BEAUMONT
Control Number: 0177-03-109
DBE Goal: 0.0%
Project: STP 2026(283)MM
Guaranty: $22,000.00
Time: 24 WORKING DAYS
Engineer's Estimate: $1,089,707.00
Date: 01/07/2026 (5 months ago)
Contract Number: 1263216
Type: PREVENTIVE MAINTENANCE
Project ID: A00210033
Contract Type: Federal
Project Description: US 59 NB FR (SL 573(S) TO DUDLEY STREET) FULL DEPTH BASE REPAIR, AND OVERLAY
Mail/Deliver Bids To: N/A
ROBERTO RODRIGUEZ
ROBERTO M RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,089,707.00
Over/Under Est: -21.1% -$229,918.80
Over/Under Est: -7.79% -$84,865.36
Amt Left: 16.87% $145,053.44
Over/Under Est: 5.34% $58,170.75
Amt Left: 33.51% $288,089.55
Delta: -14.23% -$143,036.11
Over/Under Est: 10.45% $113,901.65
Amt Left: 39.99% $343,820.45
Delta: -4.86% -$55,730.90
Subcontractor Percentage Amount
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 7.64% $65,687.82
SCR CIVIL CONSTRUCTION, LLC 3.02% $25,965.60
STRIPE LINES, INC. 2.13% $18,313.49
PROFESSIONAL TRAFFIC CONTROL LLC 0.95% $8,167.99
LONESTAR TRAFFIC SAFETY, LLC 0.41% $3,525.13
A1 EROSION CONTROL 0.12% $1,031.75
Total: 14.27% $122,691.78

Bid Items & Bid Tabulations

42 Total 0 of 42
LIBERTY  |  US 59  |  BEAUMONT  |  0177-03-109  |  01/07/2026  |  $1,089,707.00  |  STP 2026(283)MM  |  PREVENT MAINT  |  24 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
ELITE KINGS CONSTRUCTION, LLC
DURWOOD GREENE CONSTRUCTION CO.
TEXAS MATERIALS GROUP, INC.
BACKFILL (TY A OR B)
STA 58.300 $300.000 $270.000 $110.000 $500.000 $299.850
BROADCAST SEED (TEMP_WARM)
SY 5,194.000 $1.000 $0.200 $0.160 $1.750 $0.200
VEGETATIVE WATERING
TGL 7.300 $20.000 $100.000 $6.000 $75.000 $200.000
SP MIXES SP-C SAC-A PG76-22
TON 3,283.000 $145.000 $132.600 $135.000 $155.000 $169.000
TACK COAT
GAL 1,791.000 $3.000 $3.800 $4.000 $3.750 $4.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 2,848.000 $100.000 $78.250 $70.000 $83.000 $121.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 1,866.000 $10.000 $1.000 $5.000 $15.000 $15.000
RIPRAP (MOW STRIP)(4 IN)
CY 5.200 $750.000 $805.000 $50.000 $1,400.000 $1,106.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,500.000 $5.000 $12.000 $15.000 $8.500 $13.000
MOBILIZATION
LS 1.000 $80,000.000 $41,000.000 $125,000.000 $110,000.000 $80,244.520
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $3,500.000 $2,500.000 $1,500.000 $27,000.000 $867.260
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,000.000 $2,000.000 $1,000.000 $5,500.000 $2,433.000
TMA (STATIONARY)
DAY 30.000 $200.000 $50.000 $200.000 $350.000 $331.000
TMA (MOBILE OPERATION)
DAY 10.000 $200.000 $50.000 $200.000 $300.000 $787.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 552.300 $150.000 $40.000 $80.000 $70.000 $47.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 10,090.000 $1.000 $0.260 $3.000 $0.300 $0.700
MTL W-BEAM GD FEN (TIM POST)
LF 275.000 $25.000 $29.600 $26.000 $28.000 $32.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $1,185.000 $1,090.000 $1,750.000 $1,576.000
REMOVE METAL BEAM GUARD FENCE
LF 275.000 $5.000 $3.000 $1.600 $2.500 $5.500
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,350.000 $3,375.000 $3,000.000 $3,750.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $300.000 $330.000 $175.000 $300.000 $553.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 34.000 $600.000 $760.000 $200.000 $700.000 $763.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 11.000 $900.000 $1,060.000 $200.000 $1,050.000 $1,063.000
REMOVE SM RD SN SUP&AM
EA 45.000 $125.000 $100.000 $10.000 $105.000 $83.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 4.000 $20.000 $30.000 $45.000 $45.000 $33.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 20.000 $80.000 $70.000 $115.000 $100.000 $83.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 654.000 $1.000 $1.000 $0.750 $2.500 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 198.000 $1.000 $1.000 $0.400 $2.500 $4.000
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 80.000 $1.000 $1.200 $2.000 $1.500 $2.200
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,190.000 $1.500 $1.200 $1.000 $1.500 $1.350
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 2,180.000 $1.000 $0.900 $30.000 $0.950 $1.050
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 3,940.000 $1.000 $0.900 $0.440 $0.950 $1.050
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 3,940.000 $1.000 $0.900 $0.600 $0.950 $1.050
PREFAB PM TY C (W)(24")(SLD)
LF 268.000 $15.000 $6.800 $13.000 $7.500 $23.000
PREFAB PM TY C (W)(ARROW)
EA 3.000 $200.000 $250.000 $215.000 $275.000 $310.000
PREFAB PM TY C (W)(DBL ARROW)
EA 2.000 $350.000 $280.000 $280.000 $300.000 $387.000
PREFAB PM TY C (W)(U-LT ARROW)
EA 2.000 $400.000 $325.000 $405.000 $350.000 $387.000
PREFAB PM TY C (W)(WORD)
EA 1.000 $250.000 $250.000 $245.000 $275.000 $404.000
REFL PAV MRKR TY II-C-R
EA 109.000 $4.000 $8.000 $3.500 $10.000 $7.750
ELIM EXT PM & MRKS (6")
LF 50.000 $1.000 $3.000 $7.500 $3.500 $1.100
ELIM EXT PM & MRKS (8")
LF 440.000 $1.000 $3.000 $1.150 $3.500 $1.400
ELIM EXT PM & MRKS (24")
LF 24.000 $4.000 $6.000 $3.000 $7.000 $2.750
Totals: $1,089,707.000 $859,788.200 $1,004,841.640 $1,147,877.750 $1,203,608.645