LIBERTY US 90 (0028-04-083)

Items: 61

County: LIBERTY
Length: 2.8260 MILES
Highway: US 90
District: BEAUMONT
Control Number: 0028-04-083
DBE Goal: 0.0%
Project: STP 2026(107)MM
Guaranty: $100,000.00
Time: 92 WORKING DAYS
Engineer's Estimate: $6,408,891.21
Date: 11/06/2025 (7 months ago)
Contract Number: 11253213
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00196627
Contract Type: Federal
Project Description: US 90 (TRINITY RIVER BRIDGE, EAST TO 0.08 MILES EAST OF SH 146 N.) MILL, FDCR, OCST, & OV
Mail/Deliver Bids To: N/A
ROBERTO RODRIGUEZ
ROBERT M RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$6,408,891.21
Over/Under Est: -36.21% -$2,320,714.01
Over/Under Est: -36.21% -$2,320,434.11
Amt Left: 0.01% $279.90
Over/Under Est: -35.21% -$2,256,822.96
Amt Left: 1.56% $63,891.05
Delta: -1.56% -$63,611.15
$4,630,949.24
Over/Under Est: -27.74% -$1,777,941.97
Amt Left: 13.28% $542,772.04
Delta: -11.53% -$478,880.99
Subcontractor Percentage Amount
CPAVE, INC. 12.91% $527,783.68
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 4.22% $172,521.08
STRIPE LINES, INC. 3.04% $124,280.59
LONESTAR TRAFFIC SAFETY, LLC 0.31% $12,673.35
PROFESSIONAL TRAFFIC CONTROL LLC 0.20% $8,176.35
Total: 20.68% $845,435.05

Bid Items & Bid Tabulations

61 Total 0 of 61
LIBERTY  |  US 90  |  BEAUMONT  |  0028-04-083  |  11/06/2025  |  $6,408,891.21  |  STP 2026(107)MM  |  SURF/ROADWAY RESTOR  |  92 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
DURWOOD GREENE CONSTRUCTION CO.
TEXAS MATERIALS GROUP, INC.
ISI CONTRACTING, INC.
REMOV CONC (MOWSTRIP)
SY 264.000 $25.000 $50.000 $30.000 $22.000 $1.000
REMOV CONC (CURB)
LF 780.000 $8.170 $20.000 $22.000 $22.000 $1.000
BACKFILL (TY A OR B)
STA 3,458.000 $145.370 $1.000 $10.000 $0.100 $7.000
BLADING
HR 40.000 $160.000 $125.000 $100.000 $10.000 $468.000
SPEC EXCAV WORK (BACKHOE)
HR 40.000 $280.000 $125.000 $125.000 $10.000 $163.000
BROADCAST SEED (PERM_URBAN_CLAY)
SY 1,921.000 $1.040 $1.250 $1.250 $1.100 $1.210
ASPH (AC-20-5TR)
GAL 46,361.000 $4.750 $4.050 $4.000 $3.000 $4.000
AGGR (TY-PB OR PL, GR-4)(SAC-A)
CY 991.000 $238.000 $225.450 $235.000 $215.000 $215.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 10,341.000 $275.000 $203.500 $195.000 $220.000 $220.000
TACK COAT
GAL 5,014.000 $5.000 $3.850 $3.750 $0.100 $4.000
PLAN & TEXT CONC PAV(0" TO 1")
SY 16,324.000 $5.300 $6.500 $10.000 $4.800 $3.200
PLANE ASPH CONC PAV (1" TO 2")
SY 125,347.000 $2.720 $2.000 $2.250 $2.400 $2.020
FULL - DEPTH REPAIR CRCP (8")
CY 21.000 $200.000 $3,100.000 $3,300.000 $2,725.000 $1,100.000
RIPRAP (CONC) (CL B) (4 IN)
CY 2.000 $1,200.000 $5,000.000 $4,000.000 $2,180.000 $6,983.000
RIPRAP (MOW STRIP)(4 IN)
CY 30.000 $500.000 $805.000 $1,000.000 $1,360.000 $405.000
CLEANING AND SEALING EXISTING JOINTS
LF 77,722.000 $12.500 $3.360 $3.400 $3.200 $1.000
MOBILIZATION
LS 1.000 $582,626.000 $250,000.000 $170,000.000 $166,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $3,900.000 $6,000.000 $5,000.000 $1,370.000 $6,250.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,000.000 $15,000.000 $6,000.000 $16,350.000 $9,400.000
TMA (STATIONARY)
DAY 90.000 $350.000 $125.000 $300.000 $260.000 $5,500.000
TMA (MOBILE OPERATION)
DAY 24.000 $215.000 $100.000 $300.000 $605.000 $4,000.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 310.000 $6.200 $7.500 $12.000 $11.000 $12.150
CONC CURB (TY II)
LF 780.000 $14.000 $77.000 $90.000 $43.500 $25.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 1,024.000 $1.700 $2.600 $9.000 $5.000 $13.820
MTL W-BEAM GD FEN (TIM POST)
LF 550.000 $30.000 $28.150 $30.000 $27.250 $34.090
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,040.000 $3,150.000 $2,000.000 $2,155.000
REMOVE METAL BEAM GUARD FENCE
LF 550.000 $5.000 $3.000 $5.000 $5.500 $14.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $265.000 $260.000 $300.000 $270.000 $258.730
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,200.000 $3,255.000 $3,650.000 $3,200.000 $3,046.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $330.000 $400.000 $325.000 $258.730
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 79.000 $645.000 $695.000 $620.000 $650.000 $658.540
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 16.000 $785.000 $855.000 $720.000 $710.000 $747.170
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $950.000 $1,030.000 $800.000 $890.000 $985.300
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 7.000 $880.000 $715.000 $675.000 $710.000 $698.080
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 1.000 $895.000 $835.000 $950.000 $960.000 $746.620
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,000.000 $1,025.000 $1,050.000 $1,060.000 $1,159.570
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 5.000 $1,100.000 $1,000.000 $1,200.000 $1,115.000 $1,219.400
REMOVE SM RD SN SUP&AM
EA 113.000 $105.970 $100.000 $120.000 $109.000 $77.700
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 20.000 $63.000 $70.000 $100.000 $87.000 $54.340
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 26,950.000 $0.730 $0.290 $0.320 $0.500 $0.320
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 22,014.000 $0.850 $0.290 $0.320 $0.500 $0.320
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 10,916.000 $0.600 $0.410 $0.420 $0.900 $0.450
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 910.000 $6.750 $3.500 $4.000 $6.500 $3.840
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 104.000 $105.000 $65.000 $70.000 $136.000 $71.240
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 8,757.000 $0.530 $0.290 $0.320 $0.500 $0.320
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 48,908.000 $0.420 $0.290 $0.320 $0.500 $0.320
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 690.000 $0.820 $1.000 $2.000 $1.000 $2.740
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,254.000 $2.600 $1.000 $2.000 $1.000 $2.740
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 5,458.000 $1.250 $0.820 $0.850 $1.000 $0.900
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 13,475.000 $0.850 $0.680 $0.700 $0.650 $0.750
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 11,007.000 $0.850 $0.680 $0.700 $0.650 $0.750
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 4,379.000 $0.950 $0.680 $0.700 $0.650 $0.750
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 24,454.000 $0.850 $0.680 $0.700 $0.650 $0.750
PREFAB PM TY B (W)(36")(YLD TRI)
EA 4.000 $60.950 $150.000 $160.000 $43.600 $164.400
PREFAB PM TY C (W)(24")(SLD)
LF 455.000 $20.300 $15.000 $16.000 $22.800 $16.440
PREFAB PM TY C (W)(ARROW)
EA 52.000 $200.000 $225.000 $235.000 $275.000 $246.590
PREFAB PM TY C (W)(WORD)
EA 45.000 $180.000 $260.000 $275.000 $370.000 $284.950
REFL PAV MRKR TY I-C
EA 597.000 $6.320 $5.000 $6.000 $6.500 $5.480
REFL PAV MRKR TY II-A-A
EA 917.000 $6.550 $5.000 $6.000 $6.500 $5.480
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 500.000 $225.000 $200.000 $210.000 $290.000 $109.000
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 80.000 $110.000 $330.000 $360.000 $290.000 $298.000
Totals: $6,408,891.210 $4,088,177.200 $4,088,457.100 $4,152,068.250 $4,630,949.240