LEE US 77 (0211-07-046)

Items: 112

County: LEE
Length: 0.1490 MILES
Highway: US 77
District: AUSTIN
Control Number: 0211-07-046
DBE Goal: 7.0%
Project: BR 2025(758)
Guaranty: $100,000.00
Time: 238 WORKING DAYS
Engineer's Estimate: $14,780,998.48
Date: 08/07/2025 (10 months ago) Changed
Contract Number: 6253204
Type: BRIDGE REPLACEMENT
Project ID: A00135447
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES AT UPRR, FLATTEN ROADWAY PROFILE AND EXTEND ROADWAY TIE-IN.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DIANA SCHULZE
SHANE SWIMM
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (10)
E
Engineer's Estimate
$14,780,998.48
$13,219,085.43
Over/Under Est: -10.57% -$1,561,913.05
$14,346,152.96
Over/Under Est: -2.94% -$434,845.52
Amt Left: 8.53% $1,127,067.53
Over/Under Est: -2.75% -$405,998.48
Amt Left: 8.74% $1,155,914.57
Delta: -0.20% -$28,847.04
$15,389,854.66
Over/Under Est: 4.12% $608,856.18
Amt Left: 16.42% $2,170,769.23
Delta: -7.06% -$1,014,854.66
Over/Under Est: 7.35% $1,086,339.52
Amt Left: 20.03% $2,648,252.57
Delta: -3.10% -$477,483.34
$16,819,807.41
Over/Under Est: 13.79% $2,038,808.93
Amt Left: 27.24% $3,600,721.98
Delta: -6.00% -$952,469.41
$16,951,572.85
Over/Under Est: 14.68% $2,170,574.37
Amt Left: 28.24% $3,732,487.42
Delta: -0.78% -$131,765.44
Over/Under Est: 18.76% $2,772,804.77
Amt Left: 32.79% $4,334,717.82
Delta: -3.55% -$602,230.40
Over/Under Est: 39.58% $5,850,698.44
Amt Left: 56.08% $7,412,611.49
Delta: -17.53% -$3,077,893.67
$22,759,069.00
Over/Under Est: 53.98% $7,978,070.52
Amt Left: 72.17% $9,539,983.57
Delta: -10.31% -$2,127,372.08
Subcontractor Percentage Amount
FARR FOUNDATION, INC. 4.72% $625,407.42
HODGES AND SON CONSTRUCTION COMPANY, INC. 3.71% $491,580.83
LONE STAR PAVING COMPANY 3.59% $475,680.64
RHINO EQUITY, LLC 1.61% $213,327.53
CAPSTAR CONSTRUCTION, LLC 0.91% $120,576.43
JB PINNACLE GROUP, LLC 0.88% $116,601.38
GK CONSTRUCTION, LLC 0.56% $74,200.88
4E TREE WORX LLC 0.34% $45,050.53
STRIPE IT UP, LLC 0.19% $25,175.30
DUSTROL, INC. 0.15% $19,875.24
SUPERIOR TRAFFIC CONTROL, LLC 0.12% $15,900.19
A K FUQUAY CONSTRUCTION 0.10% $13,250.16
PRIMATE CONSTRUCTION, LP 0.08% $10,600.13
TORO BRAVO CONSTRUCTION, LLC 0.00% $0.00
Total: 16.96% $2,247,226.66

Bid Items & Bid Tabulations

112 Total 0 of 112
LEE  |  US 77  |  AUSTIN  |  0211-07-046  |  08/07/2025  |  $14,780,998.48  |  BR 2025(758)  |  BRIDGE REPL  |  238 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACME BRIDGE COMPANY, INC.
ALTUS CONSTRUCTION LLC
URBAN INFRACONSTRUCTION LLC
HUNTER INDUSTRIES, LTD.
JAMES CONSTRUCTION GROUP, LLC
COPASA INC
C. E. BARKER, LTD.
HARPER BROTHERS CONSTRUCTION LLC
JAY-REESE CONTRACTORS, INC.
MCMILLEN, INC.
PREPARING ROW
STA 15.620 $8,500.000 $3,220.000 $90,927.133 $92,029.000 $3,977.610 $67,421.000 $107,933.990 $108,515.000 $6,875.000 $3,400.000 $46,807.000
REMOV CONC (RIPRAP)
SY 390.000 $37.500 $16.500 $29.331 $13.240 $35.300 $23.150 $20.000 $12.630 $15.000 $25.000 $35.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 208.000 $60.000 $15.500 $10.999 $4.450 $5.430 $14.380 $25.000 $12.630 $15.000 $20.000 $55.000
RMV (6") TRT/UNTRT BASE & ASPH PAV
SY 7,597.000 $25.000 $6.100 $7.085 $5.940 $4.740 $6.630 $8.300 $12.630 $15.000 $10.000 $9.000
EXCAV (ROADWAY)
CY 12,259.900 $24.500 $15.000 $7.045 $11.200 $32.910 $39.420 $22.610 $30.820 $25.000 $30.000 $16.000
EMBANK (FNL)(OC)(TY B)
CY 13,172.100 $22.500 $16.900 $23.401 $4.210 $53.450 $70.360 $23.080 $30.820 $6.500 $12.000 $120.000
FURN & PLACE TOPSOIL (4")
SY 1,000.000 $3.000 $4.200 $2.933 $3.000 $8.860 $4.570 $18.000 $3.540 $10.000 $6.000 $16.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 1,000.000 $2.800 $0.610 $0.733 $0.580 $0.650 $1.000 $2.000 $2.020 $0.580 $3.000 $0.580
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
SY 1,000.000 $1.700 $1.450 $1.649 $1.350 $1.500 $2.500 $3.000 $3.030 $1.350 $4.000 $1.350
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 53.000 $85.000 $324.000 $78.132 $118.630 $131.740 $175.480 $251.030 $74.360 $75.000 $175.000 $300.000
FL BS (CMP IN PLC)(TY D GR 5)(FNAL POS)
CY 1,512.000 $85.000 $120.000 $44.676 $69.570 $74.940 $92.100 $104.730 $74.360 $100.000 $96.000 $150.000
PRIME COAT (MULTI OPTION)
GAL 1,336.000 $5.100 $5.300 $4.644 $5.550 $9.460 $4.750 $5.600 $4.800 $4.750 $9.500 $8.200
D-GR HMA TY-B PG64-22
TON 1,837.000 $125.000 $140.000 $135.521 $132.250 $103.190 $125.000 $132.250 $126.310 $125.000 $175.000 $133.760
D-GR HMA TY-D PG76-22
TON 735.000 $205.000 $189.000 $198.491 $172.600 $119.220 $169.000 $172.600 $170.780 $169.000 $240.000 $154.370
TACK COAT
GAL 1,203.000 $4.000 $4.650 $4.057 $6.400 $4.400 $4.150 $6.400 $4.190 $4.150 $9.500 $6.670
TOM-C PG76-22 SAC-A
TON 368.000 $310.000 $224.000 $195.545 $245.300 $163.130 $200.000 $245.300 $202.100 $200.000 $350.000 $205.340
PLAN & TEXT CONC PAV(0" TO 0.5")
SY 6,681.000 $5.000 $3.550 $3.893 $3.450 $1.660 $1.750 $6.000 $15.160 $4.000 $5.500 $4.030
PLANE ASPH CONC PAV(0" TO 0.5" MICRO)
SY 44.000 $0.250 $279.000 $244.431 $5.000 $2.880 $253.000 $25.000 $252.630 $4.000 $5.500 $10.350
CONC PVMT (CRCP)(HES) (11")
SY 400.000 $125.000 $165.000 $90.921 $126.170 $150.000 $154.630 $150.000 $107.370 $250.000 $235.000 $400.000
CUT & RESTORE ASPH PAVING
SY 307.000 $250.000 $333.000 $98.750 $112.080 $145.000 $145.550 $284.650 $353.680 $50.000 $95.000 $172.720
CEM STABIL BKFL
CY 2,234.000 $260.000 $107.000 $138.199 $1.000 $105.000 $168.250 $160.890 $153.600 $75.000 $215.000 $156.330
TRENCH EXCAVATION PROTECTION
LF 810.000 $26.000 $19.100 $11.732 $2.110 $25.000 $9.900 $18.000 $27.280 $10.000 $30.000 $57.000
TEMPORARY SPL SHORING
SF 15,666.000 $32.000 $42.100 $37.909 $44.300 $43.500 $84.150 $39.900 $40.420 $95.000 $65.000 $85.000
DRILL SHAFT (36 IN)
LF 1,575.000 $310.000 $320.000 $332.622 $219.070 $304.520 $228.130 $255.320 $276.680 $350.000 $565.000 $450.000
DRILL SHAFT (42 IN)
LF 912.000 $395.000 $328.000 $385.934 $323.770 $451.610 $299.440 $297.430 $381.310 $575.000 $635.000 $620.000
CL B CONC (FLUME)
CY 18.000 $950.000 $845.000 $890.488 $488.830 $1,100.000 $996.630 $2,099.590 $1,247.970 $450.000 $1,600.000 $1,140.000
CL C CONC (ABUT)
CY 130.900 $1,340.000 $1,080.000 $1,041.656 $1,000.000 $1,600.000 $1,350.940 $1,357.790 $1,605.120 $1,800.000 $1,900.000 $1,200.000
CL C CONC (CAP)
CY 185.500 $1,650.000 $1,270.000 $1,165.066 $1,100.000 $1,500.000 $1,300.550 $1,450.190 $2,023.500 $1,775.000 $1,950.000 $1,500.000
CL C CONC (COLUMN)
CY 125.500 $1,725.000 $1,160.000 $1,233.997 $1,200.000 $1,010.000 $1,049.060 $1,602.380 $1,864.120 $1,800.000 $1,800.000 $1,450.000
CL C CONC (CRASHWALL)
CY 228.800 $1,200.000 $1,010.000 $602.435 $964.580 $1,400.000 $1,080.290 $1,227.270 $887.470 $1,800.000 $1,500.000 $985.000
REINF CONC SLAB
SF 29,771.500 $28.000 $30.000 $17.758 $25.000 $29.000 $25.970 $27.860 $20.370 $50.000 $40.000 $41.000
BRIDGE SIDEWALK
SF 4,104.000 $35.000 $13.900 $12.548 $12.110 $14.770 $24.550 $16.710 $10.310 $15.000 $20.000 $11.000
APPROACH SLAB
CY 534.400 $800.000 $733.000 $413.052 $500.000 $750.000 $577.050 $578.180 $853.140 $700.000 $850.000 $662.000
RETAINING WALL (MSE)
SF 31,777.000 $90.000 $72.050 $90.604 $103.250 $99.260 $93.160 $97.920 $87.850 $120.000 $175.000 $150.000
RETAINING WALL (TEMP WALL)
SF 1,092.000 $26.000 $36.000 $23.465 $30.000 $36.000 $61.170 $37.400 $39.160 $50.000 $97.000 $125.000
PRESTR CONC GIRDER (TX40)
LF 1,965.546 $200.000 $228.000 $179.073 $200.000 $190.000 $222.520 $206.640 $251.510 $265.000 $275.000 $300.000
RIPRAP (CONC)(4 IN)
CY 25.000 $940.000 $721.000 $549.971 $765.640 $1,022.340 $556.640 $616.000 $1,243.930 $450.000 $850.000 $650.000
RIPRAP (MOW STRIP)(4 IN)
CY 255.000 $760.000 $624.000 $405.954 $463.680 $787.200 $679.530 $625.000 $732.620 $450.000 $800.000 $695.000
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 6.700 $280.000 $206.000 $196.156 $303.130 $318.790 $427.790 $280.000 $282.940 $550.000 $250.000 $395.000
ELASTOMERIC BEARING (EE6)
EA 11.000 $3,100.000 $3,060.000 $1,844.970 $2,253.050 $2,500.000 $2,688.710 $2,887.000 $2,526.260 $4,500.000 $3,750.000 $3,000.000
ELASTOMERIC BEARING (EF6)
EA 11.000 $4,800.000 $3,060.000 $1,844.970 $2,253.050 $2,500.000 $2,688.710 $2,377.000 $2,526.260 $4,500.000 $3,750.000 $3,000.000
STR STEEL (PLATE GIRDER)
LB 901,135.300 $2.400 $2.670 $2.409 $2.200 $2.910 $2.410 $2.460 $2.710 $3.500 $2.500 $3.050
STR STEEL (MISC NON-BRIDGE)
LB 1,043.800 $25.000 $22.500 $14.665 $29.590 $28.130 $21.940 $24.710 $10.610 $40.000 $30.000 $15.000
RAIL (TY T221)
LF 342.000 $250.000 $87.500 $171.413 $89.940 $77.300 $96.640 $153.090 $103.410 $75.000 $77.000 $208.000
RAIL (TY C221)
LF 1,242.000 $185.000 $114.000 $178.734 $117.910 $109.430 $120.600 $176.030 $302.660 $145.000 $172.000 $122.000
RAIL (CLF-RO)
LF 313.700 $162.000 $79.900 $123.193 $90.000 $92.700 $134.120 $180.000 $116.210 $100.000 $144.000 $130.000
RAIL (CLF-RO)(MOD)
LF 300.200 $162.000 $81.300 $124.660 $110.000 $113.300 $140.980 $250.000 $122.270 $150.000 $151.000 $152.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 579.444 $225.000 $241.000 $163.195 $200.670 $225.000 $199.480 $212.650 $202.100 $265.000 $255.000 $250.000
CONC BOX CULV (3 FT X 2 FT)
LF 87.000 $375.000 $336.000 $420.178 $453.400 $350.000 $318.810 $530.710 $573.000 $650.000 $1,240.000 $1,400.000
RC PIPE (CL III)(24 IN)
LF 728.000 $120.000 $85.900 $141.260 $79.590 $170.000 $102.480 $106.100 $164.030 $150.000 $263.000 $180.000
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 1.000 $10,000.000 $8,180.000 $8,799.543 $6,647.110 $14,000.000 $5,704.640 $8,250.210 $6,745.120 $16,000.000 $15,250.000 $11,780.000
INLET (COMPL)(PCO)(5FT)(RIGHT)
EA 1.000 $23,000.000 $12,100.000 $6,874.643 $9,442.650 $17,000.000 $12,138.500 $11,566.660 $10,585.040 $13,000.000 $16,100.000 $19,708.000
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 2.000 $9,900.000 $8,800.000 $7,097.748 $6,438.750 $13,000.000 $9,189.410 $8,819.260 $7,553.520 $12,000.000 $13,300.000 $11,525.000
WINGWALL (PW - 2) (HW=4 FT)
EA 2.000 $11,700.000 $10,200.000 $8,555.114 $12,264.810 $7,500.000 $23,203.810 $15,000.000 $21,220.610 $13,900.000 $12,500.000 $12,056.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $2,200.000 $2,000.000 $1,568.518 $1,448.070 $2,800.000 $1,303.410 $2,882.030 $2,526.260 $2,600.000 $6,000.000 $4,800.000
REMOV STR (HEADWALL)
EA 6.000 $1,750.000 $313.000 $1,569.035 $1,573.490 $1,100.000 $1,402.470 $2,250.000 $2,652.580 $1,000.000 $200.000 $2,050.000
REMOV STR (PIPE)
LF 255.000 $46.000 $21.300 $23.025 $59.950 $13.000 $31.120 $33.830 $35.370 $30.000 $35.000 $80.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $150,000.000 $260,000.000 $239,738.674 $337,273.170 $325,000.000 $192,933.460 $274,038.680 $301,181.020 $350,000.000 $404,550.000 $600,000.000
MOBILIZATION
LS 1.000 $1,193,579.940 $1,020,000.000 $1,427,454.966 $1,437,500.000 $1,205,522.930 $827,833.300 $1,815,232.980 $1,525,000.000 $550,000.000 $1,750,000.000 $2,258,600.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $9,250.000 $12,900.000 $3,666.476 $6,800.000 $6,058.740 $7,106.370 $15,000.000 $7,326.160 $9,950.000 $21,300.000 $40,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $8,000.000 $20,300.000 $7,048.529 $15,909.330 $7,740.380 $14,657.820 $5,384.070 $20,210.100 $25,000.000 $21,700.000 $27,800.000
TMA (STATIONARY)
DAY 162.000 $225.000 $285.000 $162.989 $350.000 $180.610 $786.940 $500.000 $1,010.510 $250.000 $325.000 $162.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,655.000 $4.500 $3.150 $3.351 $3.000 $3.340 $4.250 $3.600 $3.640 $3.000 $5.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,655.000 $1.800 $1.050 $1.011 $1.000 $1.110 $1.250 $1.200 $1.210 $1.000 $1.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 60.000 $8.900 $5.800 $5.536 $5.500 $6.130 $6.000 $10.000 $10.110 $5.500 $10.000 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $3.000 $1.050 $1.466 $1.000 $1.110 $1.000 $2.500 $5.050 $1.000 $5.000 $1.000
PCTB (FUR&INST)(F-SHAPE OR SNGL SLP)TY1
LF 1,092.000 $50.000 $19.000 $53.556 $25.580 $65.000 $47.380 $100.000 $62.650 $80.000 $95.000 $200.000
PCTB (MOVE)(F-SHAPE OR SNGL SLP)TY1
LF 480.000 $25.000 $8.600 $17.379 $12.970 $34.000 $19.180 $35.000 $7.070 $40.000 $35.000 $80.000
PCTB (REMOVE)(F-SHAPE OR SNGL SLP)TY1
LF 1,092.000 $26.000 $19.900 $21.778 $13.320 $45.000 $13.000 $30.000 $12.130 $20.000 $20.000 $10.000
CONC CURB & GUTTER (TY II)
LF 1,176.000 $70.000 $41.200 $45.830 $48.380 $45.440 $40.070 $35.000 $9.090 $50.000 $50.000 $38.600
DRIVEWAYS (CONC)
SY 321.000 $125.000 $88.100 $87.995 $179.930 $106.780 $95.350 $125.000 $116.210 $120.000 $185.000 $300.000
CONC SIDEWALKS (4")
SY 948.000 $85.000 $40.000 $134.644 $47.990 $96.550 $76.250 $106.320 $96.250 $110.000 $135.000 $300.000
CURB RAMPS (TY 1)
EA 2.000 $3,370.000 $2,430.000 $2,493.203 $1,784.860 $2,385.460 $2,865.670 $5,000.000 $3,905.600 $2,100.000 $3,900.000 $1,730.000
MTL W-BEAM GD FEN (TIM POST)
LF 729.000 $25.000 $29.500 $21.038 $26.000 $26.780 $23.000 $26.000 $27.740 $26.500 $35.000 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,400.000 $2,600.000 $1,833.238 $2,000.000 $2,060.000 $1,550.000 $2,000.000 $2,005.850 $2,150.000 $2,500.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 767.000 $4.500 $0.620 $2.361 $0.550 $0.570 $3.000 $0.550 $3.030 $3.000 $4.000 $5.500
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $325.000 $283.000 $202.022 $250.000 $257.500 $200.000 $250.000 $222.310 $350.000 $275.000 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,500.000 $3,630.000 $2,443.002 $3,200.000 $3,296.000 $3,000.000 $3,200.000 $3,016.360 $3,150.000 $3,750.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $345.000 $227.000 $234.654 $200.000 $206.000 $200.000 $200.000 $333.470 $200.000 $415.000 $275.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,600.000 $2,830.000 $1,206.270 $2,500.000 $2,575.000 $3,000.000 $2,500.000 $3,031.520 $4,000.000 $3,150.000 $1,200.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,100.000 $2,270.000 $733.295 $2,500.000 $2,060.000 $1,000.000 $2,000.000 $1,040.820 $1,850.000 $1,700.000 $575.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $12,000.000 $31,700.000 $23,465.449 $28,000.000 $28,840.000 $28,400.000 $28,000.000 $31,876.380 $29,000.000 $34,500.000 $28,000.000
PIPE UNDERDRAINS (TY 6)(8")
LF 1,927.000 $45.000 $26.300 $7.912 $26.220 $41.900 $32.060 $15.000 $7.170 $55.000 $79.500 $14.000
REMOVE RD IL ASM (BRIDGE MOUNT)
EA 4.000 $200.000 $1,060.000 $1,539.920 $750.000 $937.000 $900.000 $490.000 $946.840 $1,000.000 $2,000.000 $1,000.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 20.000 $1,600.000 $1,200.000 $1,036.390 $1,060.000 $1,651.880 $1,060.000 $1,060.000 $1,669.230 $1,060.000 $1,325.000 $1,060.000
IN RD IL (TY SA) 40B-8 (250W EQ) LED
EA 4.000 $1,450.000 $5,090.000 $4,399.771 $4,500.000 $5,062.990 $4,500.000 $4,500.000 $5,116.180 $4,500.000 $5,625.000 $4,500.000
CONDT (PVC) (SCH 80) (4")
LF 415.000 $38.000 $25.400 $21.949 $22.450 $23.040 $22.450 $22.450 $23.280 $22.450 $28.000 $22.450
CONDT (RM) (3/4")
LF 2,375.000 $22.000 $16.200 $13.981 $14.300 $21.990 $14.300 $14.300 $22.220 $14.300 $18.000 $14.300
ELEC CONDR (NO.8) BARE
LF 2,955.000 $2.000 $1.350 $1.173 $1.200 $2.550 $1.200 $1.200 $2.580 $1.200 $1.500 $1.200
ELEC CONDR (NO.8) INSULATED
LF 11,100.000 $2.100 $1.600 $1.398 $1.430 $3.020 $1.430 $1.430 $3.050 $1.430 $1.750 $1.430
GROUND BOX TY D (162922)W/APRON
EA 2.000 $1,600.000 $2,440.000 $2,107.001 $2,155.000 $1,373.320 $2,155.000 $2,155.000 $1,387.750 $2,255.000 $2,700.000 $2,155.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 1.000 $6,700.000 $7,350.000 $6,355.225 $6,500.000 $7,560.620 $6,500.000 $6,500.000 $7,640.040 $6,500.000 $8,125.000 $6,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000 $900.000 $351.000 $733.295 $332.000 $341.960 $670.000 $332.000 $677.040 $750.000 $835.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $900.000 $438.000 $928.840 $415.000 $427.450 $855.000 $415.000 $863.980 $950.000 $1,075.000 $945.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,200.000 $517.000 $977.727 $490.000 $504.700 $1,075.000 $490.000 $1,086.290 $1,000.000 $1,350.000 $1,110.000
REMOVE SM RD SN SUP&AM
EA 2.000 $150.000 $158.000 $97.772 $150.000 $154.500 $110.000 $150.000 $111.160 $100.000 $135.000 $150.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GF2(BI)
EA 8.000 $24.000 $37.000 $48.886 $35.000 $36.050 $30.000 $35.000 $30.320 $35.000 $37.500 $35.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 16.000 $35.000 $21.100 $29.331 $20.000 $20.600 $24.500 $20.000 $24.760 $28.500 $31.000 $8.950
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 120.000 $1.000 $17.400 $2.933 $3.000 $10.600 $3.000 $16.500 $16.670 $16.500 $20.000 $3.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 11.000 $7.000 $34.800 $19.554 $20.000 $25.000 $20.000 $33.000 $33.350 $33.000 $41.000 $20.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 3.000 $90.000 $211.000 $342.204 $350.000 $520.000 $350.000 $200.000 $202.100 $200.000 $250.000 $350.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 22.000 $17.000 $37.000 $19.554 $20.000 $25.000 $20.000 $35.000 $35.370 $35.000 $44.000 $20.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 1,383.000 $0.850 $2.650 $2.199 $2.250 $7.000 $2.250 $2.500 $2.530 $2.500 $3.000 $2.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 113.000 $1.750 $4.200 $3.422 $3.500 $2.500 $3.500 $4.000 $4.040 $4.000 $5.000 $3.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 38.000 $11.000 $14.800 $14.665 $15.000 $10.600 $15.000 $14.000 $14.150 $14.000 $17.500 $15.000
RE PM TY II (W) 6" (SLD)
LF 2,680.000 $0.850 $1.600 $0.733 $0.750 $1.600 $0.750 $1.500 $1.520 $1.500 $2.000 $0.750
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 670.000 $1.000 $3.150 $1.955 $2.000 $1.600 $2.000 $3.000 $3.030 $3.000 $3.750 $2.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 670.000 $0.700 $3.150 $1.955 $2.000 $1.600 $2.000 $3.000 $3.030 $3.000 $3.750 $2.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 2,680.000 $1.000 $3.150 $1.466 $1.500 $1.600 $1.500 $3.000 $3.030 $3.000 $3.750 $1.500
REFL PAV MRKR TY I-C
EA 34.000 $7.000 $7.700 $4.644 $4.750 $10.600 $4.750 $7.250 $7.330 $7.250 $9.000 $4.750
REFL PAV MRKR TY II-A-A
EA 68.000 $7.500 $7.700 $4.644 $4.750 $10.600 $4.750 $7.250 $7.330 $7.250 $9.000 $4.750
PAV SURF PREP FOR MRK (6")
LF 2,952.000 $0.360 $0.260 $0.391 $0.400 $1.600 $0.400 $0.250 $0.250 $0.250 $0.300 $0.400
Totals: $14,780,998.480 $13,219,085.433 $14,346,152.892 $14,375,000.005 $15,389,854.662 $15,867,337.985 $16,819,807.393 $16,951,572.842 $17,553,803.250 $20,631,696.920 $22,759,068.995
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
ENVIRONMENTAL: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
RAILROAD FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $30,000.00