PREPARING ROW
|
STA
|
478.080
|
$500.000
|
$444.000
|
$206.310
|
$400.000
|
$432.000
|
$3,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
188.940
|
$15.000
|
$16.650
|
$13.990
|
$15.000
|
$20.000
|
$25.000
|
|
|
REMOVING STAB BASE & ASPH PAV (5" - 6")
|
SY
|
117,125.590
|
$3.000
|
$3.610
|
$2.420
|
$2.900
|
$2.750
|
$3.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
35,593.810
|
$8.500
|
$7.770
|
$11.480
|
$7.000
|
$12.000
|
$8.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
478.080
|
$1,620.000
|
$173.400
|
$236.830
|
$70.000
|
$275.000
|
$200.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
22,007.370
|
$12.000
|
$3.310
|
$4.740
|
$14.000
|
$10.000
|
$5.000
|
|
|
BLADING
|
HR
|
82.000
|
$91.500
|
$49.950
|
$53.830
|
$140.000
|
$100.000
|
$160.000
|
|
|
FURNISHING AND PLACING TOPSOIL (6")
|
SY
|
203,386.000
|
$1.400
|
$0.240
|
$0.520
|
$0.700
|
$1.000
|
$1.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
203,386.000
|
$0.170
|
$0.130
|
$0.130
|
$0.140
|
$0.130
|
$0.130
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
203,386.000
|
$0.120
|
$0.110
|
$0.080
|
$0.080
|
$0.090
|
$0.090
|
|
|
PROOF ROLLING
|
HR
|
100.570
|
$90.000
|
$27.750
|
$45.210
|
$90.000
|
$60.000
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
|
CY
|
56,994.210
|
$27.000
|
$24.920
|
$39.420
|
$28.000
|
$35.000
|
$55.000
|
|
|
CEMENT
|
TON
|
2,885.330
|
$170.000
|
$128.290
|
$240.000
|
$248.000
|
$240.000
|
$300.000
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
170,982.620
|
$2.250
|
$3.280
|
$2.010
|
$3.300
|
$1.500
|
$2.500
|
|
|
PRIME COAT (RC-250)
|
GAL
|
33,188.990
|
$4.000
|
$3.270
|
$4.630
|
$4.500
|
$4.150
|
$3.700
|
|
|
AGGR(TY-PE GR-5 SAC-B)
|
CY
|
1,276.500
|
$107.610
|
$85.680
|
$92.530
|
$150.000
|
$113.000
|
$81.000
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
2,107.190
|
$91.500
|
$107.990
|
$82.470
|
$95.000
|
$75.000
|
$120.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
|
TON
|
19,156.280
|
$102.540
|
$139.540
|
$89.390
|
$111.000
|
$105.000
|
$135.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
5,669.060
|
$2.800
|
$3.330
|
$3.640
|
$3.000
|
$2.300
|
$2.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
7,673.750
|
$65.000
|
$113.220
|
$115.310
|
$102.000
|
$115.000
|
$105.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
77.000
|
$13.000
|
$5.550
|
$15.000
|
$5.000
|
$5.500
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,150.000
|
$36.000
|
$8.880
|
$35.000
|
$8.000
|
$9.000
|
$8.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
62.100
|
$350.000
|
$449.550
|
$400.000
|
$410.000
|
$435.000
|
$420.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
349.540
|
$380.230
|
$471.750
|
$425.000
|
$425.000
|
$456.000
|
$430.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
819.000
|
$108.010
|
$213.120
|
$132.000
|
$225.000
|
$137.000
|
$395.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
4.710
|
$137.910
|
$499.500
|
$825.000
|
$450.000
|
$483.000
|
$450.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
35.530
|
$350.000
|
$555.000
|
$825.000
|
$500.000
|
$537.000
|
$510.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
32.500
|
$1,000.000
|
$666.000
|
$975.000
|
$600.000
|
$644.000
|
$600.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
999.000
|
$73.000
|
$83.250
|
$76.180
|
$75.000
|
$81.000
|
$75.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$27,659.520
|
$22,200.000
|
$35,000.000
|
$21,000.000
|
$21,500.000
|
$20,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$26,392.180
|
$25,530.000
|
$32,500.000
|
$24,000.000
|
$24,700.000
|
$23,500.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$17,816.030
|
$32,745.000
|
$42,500.000
|
$30,000.000
|
$31,700.000
|
$30,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$7,400.000
|
$7,770.000
|
$6,734.000
|
$7,000.000
|
$7,500.000
|
$7,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$14,800.000
|
$8,325.000
|
$6,799.000
|
$7,500.000
|
$8,100.000
|
$7,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1) (C)
|
EA
|
9.000
|
$10,000.000
|
$7,492.500
|
$9,842.300
|
$7,000.000
|
$7,300.000
|
$7,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
5.000
|
$10,000.000
|
$7,881.000
|
$13,534.300
|
$7,500.000
|
$7,700.000
|
$7,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$1,600.000
|
$1,665.000
|
$1,250.000
|
$1,500.000
|
$1,600.000
|
$1,600.000
|
|
|
REMOV STR (SET)
|
EA
|
14.000
|
$410.000
|
$555.000
|
$900.000
|
$500.000
|
$535.000
|
$500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
26.000
|
$1,378.520
|
$832.500
|
$900.000
|
$750.000
|
$800.000
|
$750.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
13.000
|
$1,584.490
|
$277.500
|
$900.000
|
$250.000
|
$270.000
|
$300.000
|
|
|
REMOV STR (PIPE)
|
LF
|
482.000
|
$14.800
|
$11.100
|
$15.000
|
$10.000
|
$10.750
|
$12.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
58.900
|
$39.000
|
$33.300
|
$200.000
|
$30.000
|
$33.000
|
$35.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,001,955.460
|
$766,000.000
|
$1,200,367.990
|
$1,000,000.000
|
$1,165,000.000
|
$1,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$4,500.000
|
$2,220.000
|
$3,901.500
|
$1,500.000
|
$4,400.000
|
$5,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
700.000
|
$30.000
|
$25.190
|
$23.750
|
$24.000
|
$13.000
|
$45.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
700.000
|
$10.000
|
$16.650
|
$13.500
|
$14.000
|
$5.500
|
$25.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
101.000
|
$60.000
|
$38.850
|
$53.830
|
$88.000
|
$120.000
|
$111.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,040.000
|
$1.500
|
$2.870
|
$2.700
|
$2.750
|
$3.500
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,040.000
|
$0.500
|
$1.110
|
$0.900
|
$1.000
|
$0.500
|
$0.500
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
3,592.000
|
$37.970
|
$21.440
|
$12.000
|
$17.000
|
$90.000
|
$70.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
1,784.000
|
$65.000
|
$29.650
|
$64.590
|
$40.000
|
$100.000
|
$56.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
5.000
|
$4,000.000
|
$4,995.000
|
$4,000.000
|
$5,300.000
|
$5,000.000
|
$4,100.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
2,100.000
|
$16.110
|
$31.220
|
$18.000
|
$17.000
|
$24.000
|
$35.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
10,440.000
|
$4.270
|
$31.220
|
$9.000
|
$10.000
|
$9.000
|
$6.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
2,100.000
|
$36.690
|
$31.220
|
$18.000
|
$17.000
|
$11.000
|
$17.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
792.500
|
$73.380
|
$88.800
|
$80.000
|
$81.000
|
$85.000
|
$80.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,953.000
|
$35.000
|
$24.420
|
$33.960
|
$35.000
|
$37.600
|
$65.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
89,057.000
|
$0.200
|
$0.110
|
$0.100
|
$0.200
|
$0.150
|
$0.350
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
42,359.000
|
$0.200
|
$0.110
|
$0.100
|
$0.200
|
$0.190
|
$0.350
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,175.000
|
$19.900
|
$25.250
|
$25.110
|
$19.000
|
$27.000
|
$24.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,635.840
|
$1,731.600
|
$1,349.000
|
$2,300.000
|
$1,875.000
|
$1,800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,657.000
|
$1.060
|
$2.220
|
$1.000
|
$2.000
|
$1.000
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
21.000
|
$2,227.050
|
$3,024.750
|
$2,665.000
|
$2,400.000
|
$2,860.000
|
$2,400.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
9.000
|
$140.820
|
$333.000
|
$136.000
|
$150.000
|
$136.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
28.000
|
$1,200.000
|
$1,376.400
|
$855.000
|
$2,550.000
|
$920.000
|
$1,800.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$751.310
|
$1,054.500
|
$300.000
|
$610.000
|
$300.000
|
$550.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$14,611.070
|
$9,512.700
|
$6,565.000
|
$9,250.000
|
$7,100.000
|
$10,000.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
4.000
|
$500.000
|
$166.500
|
$115.000
|
$120.000
|
$125.000
|
$215.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
39.000
|
$410.000
|
$516.150
|
$395.000
|
$400.000
|
$425.000
|
$470.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
13.000
|
$580.000
|
$604.950
|
$480.000
|
$490.000
|
$515.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
1.000
|
$1,200.000
|
$1,332.000
|
$845.000
|
$860.000
|
$900.000
|
$900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
48.000
|
$70.000
|
$94.350
|
$50.000
|
$51.000
|
$50.000
|
$76.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$13.000
|
$22.200
|
$20.000
|
$21.000
|
$22.000
|
$10.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
7.000
|
$80.000
|
$63.270
|
$50.000
|
$51.000
|
$53.000
|
$80.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
101.000
|
$40.000
|
$42.180
|
$28.000
|
$28.000
|
$30.000
|
$51.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
228,422.000
|
$0.300
|
$0.310
|
$0.280
|
$0.300
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
440.000
|
$4.420
|
$2.500
|
$2.250
|
$2.300
|
$2.410
|
$2.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
8,760.000
|
$0.210
|
$0.330
|
$0.300
|
$0.300
|
$0.320
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
303,410.000
|
$0.270
|
$0.310
|
$0.280
|
$0.300
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
3,529.000
|
$0.820
|
$3.610
|
$3.250
|
$3.000
|
$3.500
|
$3.250
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
51.000
|
$6.000
|
$1.670
|
$3.000
|
$3.000
|
$3.220
|
$3.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
18.000
|
$50.000
|
$24.420
|
$22.000
|
$23.000
|
$23.600
|
$22.000
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
51.000
|
$5.000
|
$1.670
|
$1.500
|
$1.500
|
$1.610
|
$1.500
|
|
REFL PAV MRK TY II (W) 36" (YLD TRI)
|
EA
|
18.000
|
$14.000
|
$22.200
|
$20.000
|
$20.000
|
$22.000
|
$20.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
95,401.000
|
$0.250
|
$0.310
|
$0.280
|
$0.300
|
$0.300
|
$0.280
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,375.000
|
$0.300
|
$0.360
|
$0.320
|
$0.350
|
$0.340
|
$0.330
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
72,474.000
|
$0.300
|
$0.330
|
$0.300
|
$0.400
|
$0.320
|
$0.300
|
|
RE PM W/RET REQ TY II (W) 4" (SLD)
|
LF
|
95,401.000
|
$0.150
|
$0.160
|
$0.140
|
$0.150
|
$0.150
|
$0.150
|
|
RE PM W/RET REQ TY II (Y) 4" (BRK)
|
LF
|
4,375.000
|
$0.150
|
$0.160
|
$0.140
|
$0.150
|
$0.150
|
$0.150
|
|
RE PM W/RET REQ TY II (Y) 4" (SLD)
|
LF
|
72,474.000
|
$0.150
|
$0.160
|
$0.140
|
$0.150
|
$0.150
|
$0.150
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,232.000
|
$3.000
|
$3.330
|
$3.000
|
$3.000
|
$3.250
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
172,250.000
|
$0.050
|
$0.020
|
$0.020
|
$0.030
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
51.000
|
$0.600
|
$0.060
|
$0.050
|
$0.050
|
$0.050
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
18.000
|
$0.700
|
$0.060
|
$0.050
|
$0.050
|
$0.050
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
1,232.000
|
$0.080
|
$0.020
|
$0.020
|
$0.030
|
$0.020
|
$0.020
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
304.000
|
$398.640
|
$333.000
|
$250.000
|
$500.000
|
$550.000
|
$800.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$10,171.120
|
$16,650.000
|
$3,000.000
|
$15,000.000
|
$8,000.000
|
$5,000.000
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
96.000
|
$130.000
|
$83.250
|
$60.000
|
$40.000
|
$65.000
|
$50.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
398.000
|
$203.000
|
$166.500
|
$20.000
|
$230.000
|
$135.000
|
$410.000
|
|
Totals: |
$11,016,398.070
|
$10,878,129.768
|
$10,892,437.374
|
$10,983,169.172
|
$11,651,853.239
|
$15,354,561.653
|