LAMAR VARIOUS (0901-29-104)

Items: 61

County: LAMAR
Length: 0.0000 MILES
Highway: VARIOUS
District: PARIS
Control Number: 0901-29-104
DBE Goal: 2.0%
Project: STP 2025(339)TAPS
Guaranty: $7,000.00
Time: 35 WORKING DAYS
Engineer's Estimate: $372,913.25
Date: 08/08/2025 (10 months ago)
Contract Number: 8253227
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00207311
Contract Type: Federal
Project Description: PROJECT WILL CONSTRUCT MORE THAN 1 MILE OF 5 FT WIDE BICYCLE LANES ALONG 1ST ST SW FROM HEARNE AVE TO SHERMAN ST. SB LANE WILL CONTINUE NORTH OF KAUFMAN ST. NB LANE WILL TURN EAST ON SHERMAN ST AND NORTH ON MAIN ST.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DANIEL TAYLOR
ZACHARY SMITH
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$372,913.25
Over/Under Est: 1.86% $6,945.33
Over/Under Est: 12.79% $47,709.15
Amt Left: 10.73% $40,763.82
Over/Under Est: 30.27% $112,882.65
Amt Left: 27.89% $105,937.32
Delta: -15.49% -$65,173.50
Subcontractor Percentage Amount
STRIPING TECHNOLOGY, L.P. 10.76% $40,872.78
KITECO PROPERTY SOLUTIONS INC. 3.36% $12,763.25
SOUTHERN CROSS CONTRACTORS, LLC 2.76% $10,484.10
BARRICADES UNLIMITED 0.63% $2,393.11
Total: 17.51% $66,513.24

Bid Items & Bid Tabulations

61 Total 0 of 61
LAMAR  |  VARIOUS  |  PARIS  |  0901-29-104  |  08/08/2025  |  $372,913.25  |  STP 2025(339)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  35 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.
HIGHWAY 19 CONSTRUCTION LLC
GARRET SHIELDS INFRASTRUCTURE
REMOV CONC (CURB OR CURB & GUTTER)
LF 574.000 $12.000 $12.650 $10.000 $20.000
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 2,050.000 $25.000 $21.600 $15.000 $30.000
TACK COAT
GAL 208.000 $6.000 $13.000 $13.000 $6.000
D-GR HMA TY-C PG76-22
TON 474.000 $180.000 $173.900 $250.000 $300.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 238.000 $200.000 $149.450 $200.000 $300.000
INLET (COMPL)(PCU)(3FT)(NONE)
EA 1.000 $10,500.000 $20,611.450 $7,500.000 $12,000.000
ADJUSTING INLETS
EA 2.000 $1,120.000 $1,900.000 $3,500.000 $1,500.000
REMOV STR (INLET)
EA 1.000 $2,175.000 $1,112.630 $1,000.000 $1,000.000
MOBILIZATION
LS 1.000 $30,000.000 $29,000.000 $50,000.000 $50,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $5,000.000 $4,400.000 $5,000.000 $10,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 105.000 $155.000 $150.000 $100.000 $10.000
TMA (STATIONARY)
DAY 35.000 $200.000 $350.000 $500.000 $300.000
TMA (MOBILE OPERATION)
DAY 35.000 $250.000 $500.000 $500.000 $10.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 56.000 $6.500 $36.000 $10.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 56.000 $2.000 $3.000 $1.000 $1.000
CONC CURB (TY II)
LF 554.000 $40.000 $62.650 $50.000 $50.000
ALUMINUM SIGNS (TY A)
SF 4.000 $40.000 $34.500 $35.000 $40.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $750.000 $820.000 $850.000 $800.000
REMOVE SM RD SN SUP&AM
EA 1.000 $120.000 $575.000 $100.000 $500.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
EA 20.000 $195.000 $150.000 $115.000 $50.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 13.000 $25.000 $172.500 $39.000 $140.000
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
LF 16.000 $0.750 $5.000 $8.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 763.000 $0.750 $2.500 $1.750 $1.800
PAVEMENT SLER 6"
LF 5,035.000 $0.500 $0.750 $0.350 $0.150
PAVEMENT SLER 8"
LF 763.000 $0.750 $1.250 $0.550 $0.200
PAVEMENT SLER 24"
LF 237.000 $2.500 $3.500 $5.000 $2.300
PAVEMENT SLER (ARROW)
EA 2.000 $65.000 $100.000 $75.000 $20.000
PAVEMENT SLER (WORD)
EA 3.000 $65.000 $100.000 $95.000 $25.000
PAVEMENT SLER (RR XING)
EA 1.000 $165.000 $250.000 $200.000 $120.000
PAVEMENT SLER (BIKE ARROW)
EA 13.000 $55.000 $55.000 $70.000 $25.000
PAVEMENT SLER (BIKE SYMBOL)
EA 22.000 $70.000 $75.000 $140.000 $25.000
PAVEMENT SLER (BIKE WORD)
EA 1.000 $30.000 $100.000 $95.000 $25.000
PAVEMENT SLER (BIKE RR XING)
EA 1.000 $70.000 $100.000 $250.000 $95.000
PAVENENT SLER (BIKE DOT)
LF 204.000 $20.000 $2.000 $7.750 $20.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 4,659.000 $1.000 $1.500 $1.000 $1.400
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 376.000 $1.000 $3.000 $1.000 $1.500
PREFAB PM TY C (W)(24")(SLD)
LF 237.000 $20.000 $13.800 $19.750 $16.000
PREFAB PM TY C (W)(ARROW)
EA 2.000 $250.000 $225.000 $375.000 $260.000
PREFAB PM TY C (W)(WORD)
EA 3.000 $305.000 $255.000 $355.000 $265.000
PREFAB PM TY C (W)(RR XING)
EA 1.000 $625.000 $675.000 $1,350.000 $450.000
PREFAB PM TY C (W)(BIKE ARROW)
EA 13.000 $135.000 $125.000 $225.000 $175.000
PREFAB PM TY C (W)(BIKE RR XING)
EA 1.000 $460.000 $550.000 $450.000 $350.000
PREFAB PM TY C (W)(BIKE SYMBOL)
EA 22.000 $245.000 $175.000 $345.000 $350.000
PREFAB PM TY C (W)(BIKE WORD)
EA 1.000 $245.000 $250.000 $355.000 $400.000
PREFAB PM TY C (W)(BIKE DOT)
EA 102.000 $150.000 $2.000 $10.000 $120.000
REFL PAV MRKR TY II-C-R
EA 18.000 $5.000 $6.000 $10.000 $5.000
ELIM EXT PM & MRKS (4")
LF 179.000 $0.200 $2.000 $3.000 $0.750
ELIM EXT PM & MRKS (24")
LF 34.000 $3.250 $5.000 $10.000 $5.000
ELIM EXT PM & MRKS (ARROW)
EA 2.000 $82.500 $100.000 $150.000 $55.000
ELIM EXT PM & MRKS (WORD)
EA 3.000 $40.000 $100.000 $200.000 $60.000
ELIM EXT PM & MRKS (RR XING)
EA 1.000 $200.000 $350.000 $700.000 $210.000
PAV SURF PREP FOR MRK (6")
LF 5,035.000 $0.250 $1.000 $0.500 $0.100
PAV SURF PREP FOR MRK (8")
LF 763.000 $0.400 $1.000 $1.000 $0.200
PAV SURF PREP FOR MRK (24")
LF 170.000 $2.000 $1.000 $3.000 $0.700
PAV SURF PREP FOR MRK (WORD)
EA 3.000 $35.000 $50.000 $70.000 $0.200
PAV SURF PREP FOR MRK (RR XING)
EA 1.000 $66.500 $150.000 $150.000 $65.000
PAV SURF PREP FOR MRK (BIKE ARROW)
EA 12.000 $37.000 $50.000 $65.000 $12.000
PAV SURF PREP FOR MRK (BIKE RR XING)
EA 1.000 $50.000 $150.000 $150.000 $52.000
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 22.000 $40.000 $50.000 $100.000 $24.000
PAV SURF PREP FOR MRK (BIKE WORD)
EA 1.000 $21.000 $50.000 $70.000 $24.000
PAV SURF PREP FOR MRK (BIKE DOT)
EA 102.000 $14.000 $2.000 $3.000 $18.000
Totals: $372,913.250 $379,858.580 $420,622.400 $485,795.900
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,755.00
Total: $13,755.00