Show Job Controls
Bid Cobra

LAMAR BU 271B (0221-01-083)

Items: 37

County: LAMAR
Length: 1.5350 MILES
Highway: BU 271B
District: PARIS
Control Number: 0221-01-083
DBE Goal: 0.0%
Project: F 2025(206)
Guaranty: $51,000.00
Time: 275 WORKING DAYS
Engineer's Estimate: $2,535,515.90
Date: 11/06/2024 (1 year ago)
Contract Number: 11243022
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00197743
Project Description: CONSTRUCT SIDEWALK
Mail/Deliver Bids To: N/A
DANIEL TAYLOR
ZACHARY SMITH
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (9)
E
Engineer's Estimate
$2,535,515.90
$2,222,428.62
Over/Under Est: -12.35% -$313,087.28
Over/Under Est: -11.91% -$301,865.00
Amt Left: 0.5% $11,222.28
Over/Under Est: -7.01% -$177,802.06
Amt Left: 6.09% $135,285.22
Delta: -5.55% -$124,062.94
$2,368,610.39
Over/Under Est: -6.58% -$166,905.51
Amt Left: 6.58% $146,181.77
Delta: -0.46% -$10,896.55
$2,611,437.51
Over/Under Est: 2.99% $75,921.61
Amt Left: 17.5% $389,008.89
Delta: -10.25% -$242,827.12
$3,003,977.46
Over/Under Est: 18.48% $468,461.56
Amt Left: 35.17% $781,548.84
Delta: -15.03% -$392,539.95
$3,245,844.60
Over/Under Est: 28.02% $710,328.70
Amt Left: 46.05% $1,023,415.98
Delta: -8.05% -$241,867.14
$3,623,742.78
Over/Under Est: 42.92% $1,088,226.88
Amt Left: 63.05% $1,401,314.16
Delta: -11.64% -$377,898.18
$4,134,142.33
Over/Under Est: 63.05% $1,598,626.43
Amt Left: 86.02% $1,911,713.71
Delta: -14.08% -$510,399.55
Subcontractor Percentage Amount
A. E. MOORE CONSTRUCTION, INC. 2.93% $65,908.38
SOUTHWEST ENVIRONMENT SERVICES LLC 2.85% $64,108.83
CATOCON, INC. 2.72% $61,184.57
DIAMOND ELITE BARRICADES, LLC 0.75% $16,870.74
AREA WIDE PROTECTIVE, INC. 0.64% $14,396.37
Total: 9.89% $222,468.89

Bid Items & Bid Tabulations

37 Total 0 of 37
LAMAR  |  BU 271B  |  PARIS  |  0221-01-083  |  11/06/2024  |  $2,535,515.90  |  F 2025(206)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  275 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THK CONSTRUCTION LLC
GARRET SHIELDS INFRASTRUCTURE
PROJECT ALLIED RESOURCES, LLC
TI-ZACK CONCRETE, LLC
RB CONTRACTING, LLC
STX CIVIL
FNH CONSTRUCTION, LLC
C. E. BARKER, LTD.
SKYLINE BRIDGE LLC
PREPARING ROW
STA 106.510 $1,250.000 $700.000 $500.000 $940.000 $110.000 $1,000.000 $4,000.000 $2,000.000 $3,400.000 $1,000.000
PREP ROW (TREE REMOVE) (0"-12" DIA)
EA 26.000 $625.000 $500.000 $500.000 $614.000 $550.000 $780.000 $700.000 $2,500.000 $1,088.140 $2,000.000
PREP ROW (TREE REMOVE) (24"-36" DIA)
EA 8.000 $2,000.000 $1,000.000 $1,000.000 $1,590.000 $2,750.000 $1,600.000 $2,000.000 $10,000.000 $1,568.200 $4,000.000
REMOV CONC (DRIVEWAYS)
SY 600.000 $20.000 $25.000 $20.000 $24.000 $31.920 $40.000 $50.000 $30.000 $32.000 $25.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 600.000 $20.000 $25.000 $20.000 $20.800 $31.920 $40.000 $50.000 $30.000 $41.610 $25.000
REMOV CONC (MISC)
SY 600.000 $20.000 $20.000 $20.000 $24.000 $15.960 $40.000 $50.000 $30.000 $60.810 $20.000
EXCAV (ROADWAY)
CY 1,144.530 $50.000 $20.000 $50.000 $24.600 $83.670 $20.000 $50.000 $50.000 $28.800 $30.000
EMBANK (FNL)(OC)(TY B)
CY 1,837.300 $75.000 $20.000 $60.000 $34.400 $73.120 $40.000 $50.000 $100.000 $54.410 $50.000
BLOCK SODDING
SY 11,886.000 $14.000 $5.840 $9.000 $8.100 $7.700 $12.000 $10.000 $10.000 $10.880 $8.000
VEGETATIVE WATERING
TGL 66.562 $200.000 $20.000 $200.000 $71.000 $1.100 $55.000 $80.000 $50.000 $92.950 $15.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 10.000 $300.000 $300.000 $200.000 $352.000 $385.000 $205.000 $1,000.000 $500.000 $352.450 $500.000
CUT & RESTORE ASPH PAVING
SY 600.000 $175.000 $150.000 $100.000 $124.000 $104.500 $210.000 $250.000 $200.000 $334.440 $150.000
BRIDGE SIDEWALK
SF 40.000 $40.000 $130.000 $120.000 $353.000 $106.860 $165.000 $225.000 $100.000 $59.530 $800.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 137.000 $110.000 $200.000 $300.000 $231.000 $110.000 $200.000 $280.000 $185.000 $249.630 $300.000
RAIL (HANDRAIL)(TY E)
LF 1,157.000 $250.000 $136.080 $180.000 $187.000 $143.760 $180.000 $190.000 $185.000 $167.300 $500.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 69.000 $1,200.000 $1,150.000 $1,000.000 $1,130.000 $1,650.000 $1,000.000 $1,250.000 $600.000 $1,746.650 $3,000.000
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 18.000 $2,000.000 $1,200.000 $1,000.000 $1,450.000 $1,650.000 $2,250.000 $1,350.000 $1,000.000 $2,192.150 $5,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.500 $30,000.000 $60,000.000 $15,000.000 $31,100.000 $38,500.000 $32,000.000 $60,000.000 $25,000.000 $38,404.800 $50,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 0.500 $50,000.000 $80,000.000 $40,000.000 $42,800.000 $55,000.000 $50,000.000 $80,000.000 $65,000.000 $65,928.240 $75,000.000
MOBILIZATION
LS 1.000 $222,320.000 $200,000.000 $200,000.000 $227,000.000 $226,627.910 $240,000.000 $235,000.000 $300,000.000 $329,428.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $5,000.000 $10,008.360 $5,000.000 $3,110.000 $2,750.000 $2,200.000 $4,000.000 $8,500.000 $9,601.200 $10,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,500.000 $25,000.000 $1,000.000 $15,200.000 $1.100 $15,000.000 $7,500.000 $16,500.000 $22,082.760 $20,000.000
TMA (STATIONARY)
DAY 300.000 $300.000 $250.000 $300.000 $202.000 $1.100 $465.000 $250.000 $250.000 $192.020 $500.000
TMA (MOBILE OPERATION)
DAY 150.000 $350.000 $250.000 $300.000 $101.000 $1.100 $350.000 $150.000 $550.000 $704.090 $500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 60.000 $20.000 $54.000 $6.000 $7.300 $11.000 $8.000 $8.000 $4.000 $6.400 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 60.000 $10.000 $27.000 $1.000 $2.190 $1.100 $8.000 $2.000 $2.000 $2.560 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 100.000 $20.000 $10.800 $10.000 $11.800 $11.000 $15.000 $10.000 $18.000 $8.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $10.000 $10.800 $1.000 $5.400 $1.100 $15.000 $2.000 $9.000 $2.880 $6.000
DRIVEWAYS (CONC)
SY 1,685.000 $105.000 $100.000 $120.000 $118.000 $116.250 $120.000 $135.000 $95.000 $132.450 $250.000
DRIVEWAYS (ACP)
SY 710.000 $75.000 $90.000 $100.000 $62.000 $99.000 $95.000 $90.000 $55.000 $290.240 $150.000
CONC SIDEWALKS (5")
SY 6,037.000 $80.000 $90.000 $90.000 $104.000 $110.620 $107.000 $95.000 $65.000 $147.070 $100.000
CURB RAMPS (TY 5)
EA 1.000 $3,400.000 $3,500.000 $3,000.000 $3,510.000 $2,326.310 $3,500.000 $5,000.000 $3,250.000 $3,291.840 $10,000.000
CURB RAMPS (TY 7)
EA 22.000 $2,800.000 $3,500.000 $3,000.000 $3,510.000 $2,326.310 $3,300.000 $4,000.000 $3,250.000 $2,880.360 $15,000.000
CONCRETE SIDEWALK (RETAINING WALL)
CY 126.590 $700.000 $150.000 $500.000 $961.000 $1,485.880 $700.000 $900.000 $5,000.000 $576.070 $2,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 23.000 $600.000 $621.000 $500.000 $727.000 $495.000 $750.000 $750.000 $1,100.000 $761.700 $1,500.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $700.000 $696.600 $500.000 $1,130.000 $495.000 $750.000 $750.000 $1,000.000 $761.700 $2,000.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 8.000 $100.000 $78.300 $80.000 $94.000 $495.000 $60.000 $200.000 $100.000 $70.410 $200.000
Totals: $2,535,515.900 $2,222,428.620 $2,233,650.900 $2,357,713.850 $2,368,610.418 $2,611,437.510 $3,003,977.460 $3,245,844.600 $3,623,742.796 $4,134,142.330