KIMBLE US0377 (6442-66-001)

Items: 53

County: KIMBLE
Length: N/A
Highway: US0377
District: SAN ANGELO
Control Number: 6442-66-001
DBE Goal: 0.0%
Project: RMC - 644266001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $829,230.00
Date: 04/04/2024 (2 years ago) Changed
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
JESUS GARCIA9
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$829,230.00
$648,564.00
Over/Under Est: -21.79% -$180,666.00
Over/Under Est: -18.83% -$156,143.00
Amt Left: 3.78% $24,523.00
$733,650.00
Over/Under Est: -11.53% -$95,580.00
Amt Left: 13.12% $85,086.00
Delta: -9.00% -$60,563.00
Over/Under Est: -2.32% -$19,225.00
Amt Left: 24.89% $161,441.00
Delta: -10.41% -$76,355.00

Bid Items & Bid Tabulations

53 Total 0 of 53
KIMBLE  |  US0377  |  SAN ANGELO  |  6442-66-001  |  04/04/2024  |  $829,230.00  |  RMC - 644266001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
BK FIELD OPERATIONS LLC
E.V.G. ENTERPRISE
AUSTIN BARRICADE COMPANY, L.L.C.
REMOVING CONC (RIPRAP)
SY 8.000 $50.000 $1.000 $20.000 $26.000 $25.000
MOBILIZATION (CALLOUT)
EA 10.000 $3,000.000 $1.000 $1.000 $1.000 $500.000
CONCRETE CURB (SPECIAL)
LF 98.000 $85.000 $1.000 $5.000 $1.000 $8.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,750.000 $38.000 $30.000 $25.000 $22.000 $25.000
MTL BEAM GD FEN TRANS (T101)
EA 2.000 $1,100.000 $1.000 $1.000 $1.000 $100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,400.000 $1,500.000 $1,250.000 $1,500.000 $1,400.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 60.000 $85.000 $20.000 $5.000 $1.000 $35.000
MTL BM GD FEN TRANS (THRIE-BEAM)(OPT1)
EA 4.000 $1,000.000 $100.000 $100.000 $1,600.000 $250.000
MTL BM GD FEN TRANS (THRIE-BEAM)(OPT2)
EA 4.000 $1,500.000 $100.000 $100.000 $1.000 $50.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $1,330.000 $200.000 $100.000 $677.000 $250.000
MTL BM GD FEN TRANS (31"-28")
EA 40.000 $880.000 $100.000 $1.000 $615.000 $250.000
CONNECTOR PLATE FOR THRIE BEAM
EA 6.000 $1,100.000 $600.000 $1,500.000 $650.000 $300.000
MTL W-BEAM GD FEN (NESTED)(TIM POST)
LF 25.000 $40.000 $30.000 $30.000 $30.000 $50.000
MTL W-BEAM GD FEN (NESTED)(STEEL POST)
LF 25.000 $40.000 $30.000 $30.000 $30.000 $50.000
REMOVE METAL BEAM GUARD FENCE
LF 3,200.000 $6.500 $0.010 $1.000 $1.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $310.000 $1.000 $1.000 $1.000 $150.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $250.000 $1.000 $1.000 $1.000 $1,900.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $780.000 $1.000 $1.000 $945.000 $1.000
GUARDRAIL END TREATMENT (REMOVE)
EA 60.000 $400.000 $1.000 $1.000 $1.000 $1.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 64.000 $2,450.000 $4,600.000 $5,000.000 $4,000.000 $4,000.000
GUARDRAIL END TRTMNT(RETRO)(STEEL POST)
EA 2.000 $2,950.000 $1.000 $1.000 $1.000 $5,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 20.000 $60.000 $10.000 $5.000 $24.000 $1.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 60.000 $45.000 $10.000 $5.000 $24.000 $1.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 20.000 $70.000 $10.000 $5.000 $24.000 $1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 40.000 $60.000 $1.000 $10.000 $24.000 $1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 120.000 $45.000 $10.000 $5.000 $24.000 $1.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 40.000 $70.000 $1.000 $5.000 $24.000 $1.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 7,800.000 $24.250 $24.000 $22.000 $21.000 $28.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 80.000 $160.000 $20.000 $60.000 $19.000 $10.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $30.500 $20.000 $1.000 $14.000 $20.000
REM / REPL TIMBER POST W / O CONC FND
EA 80.000 $40.000 $20.000 $10.000 $22.000 $30.000
REM / REPL STEEL POST W / O CONC FND
EA 120.000 $50.000 $20.000 $100.000 $50.000 $30.000
REM / REPL STEEL POST W / CONC FND
EA 240.000 $80.000 $35.000 $55.000 $50.000 $60.000
REALIGN POSTS
EA 60.000 $24.000 $10.000 $75.000 $50.000 $50.000
REMOVE & REPLACE BLOCKOUT
EA 440.000 $70.000 $1.000 $40.000 $250.000 $20.000
REM & RESET SGT IMPACT HEAD
EA 4.000 $240.000 $10.000 $1.000 $100.000 $500.000
REPLACE SGT OBJECT MARKER
EA 4.000 $35.000 $30.000 $1.000 $30.000 $1.000
REPLACE POSTS (TL-4)
EA 200.000 $190.000 $150.000 $125.000 $178.000 $150.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $680.000 $100.000 $1.000 $1.000 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 8.000 $1,800.000 $1,500.000 $1,000.000 $1,500.000 $900.000
REPLACE CABLE (TL-4)
LF 1,600.000 $5.700 $0.010 $0.100 $0.100 $2.000
CHECK / RE-TENSION CABLE
EA 20.000 $370.000 $10.000 $1.000 $300.000 $1.000
REPLACE POST HARDWARE (TL-4)
EA 200.000 $50.000 $30.000 $40.000 $58.000 $80.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 400.000 $25.000 $3.000 $4.000 $1.000 $8.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 4.000 $43.000 $50.000 $20.000 $1.000 $50.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 4.000 $62.000 $10.000 $1.000 $1.000 $50.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 200.000 $13.500 $1.000 $1.000 $2.000 $10.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 50.000 $62.000 $20.000 $35.000 $2.000 $25.000
REP METAL POST W/ BASE PLATE (T6 RAIL)
EA 25.000 $100.000 $200.000 $30.000 $2.000 $50.000
REP METAL POST W/ BASE PLATE (TYPE T1)
EA 15.000 $300.000 $100.000 $1.000 $2.000 $100.000
REPAIR (TY T1)
LF 125.000 $80.000 $20.000 $90.000 $2.000 $25.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 20.000 $165.000 $20.000 $20.000 $2.000 $78.000
TMA (STATIONARY)
DAY 100.000 $310.000 $100.000 $0.100 $100.000 $1,250.000
Totals: $829,230.000 $648,564.000 $673,087.000 $733,650.000 $810,005.000