Bid Cobra

MTL BM GD FEN TRANS (THRIE-BEAM)(OPT2)

Engineer's Estimate

Average: $1,620.83
Maximum: $2,000.00
Minimum: $1,225.00

Bid Information

Average Bid: $1,082.21