KIMBLE US 83 (0035-07-043)

Items: 92

County: KIMBLE
Length: N/A
Highway: US 83
District: SAN ANGELO
Control Number: 0035-07-043
DBE Goal: N/A
Project: STP 2018(679)
Guaranty: N/A
Time: 339 WORKING DAYS
Engineer's Estimate: $6,070,340.70
Date: 02/02/2018 (8 years ago)
Contract Number: N/A
Type: ADD PASSING LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$6,070,340.70
$5,713,900.34
Over/Under Est: -5.87% -$356,440.36
Over/Under Est: 12.23% $742,516.11
Amt Left: 19.23% $1,098,956.47
$7,069,433.24
Over/Under Est: 16.46% $999,092.54
Amt Left: 23.72% $1,355,532.90
Delta: -3.77% -$256,576.43
Over/Under Est: 16.76% $1,017,262.26
Amt Left: 24.04% $1,373,702.62
Delta: -0.26% -$18,169.72
$7,424,020.08
Over/Under Est: 22.3% $1,353,679.38
Amt Left: 29.93% $1,710,119.74
Delta: -4.75% -$336,417.12

Bid Items & Bid Tabulations

92 Total 0 of 92
KIMBLE  |  US 83  |  SAN ANGELO  |  0035-07-043  |  02/02/2018  |  $6,070,340.70  |  STP 2018(679)  |  ADD PASSING LANES  |  339 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALLEN KELLER COMPANY
HUNTER INDUSTRIES, LTD.
REECE ALBERT, INC.
ANGEL BROTHERS HOLDINGS CORP.
RK HALL, LLC
PREPARING ROW
STA 104.000 $500.000 $500.000 $1,465.860 $980.730 $440.000 $259.340
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 8,961.000 $4.500 $4.000 $4.360 $4.380 $4.300 $1.730
REMOVING STAB BASE AND ASPH PAV (5")
SY 7,340.000 $3.000 $2.500 $2.780 $3.010 $4.000 $1.360
EXCAVATION (ROADWAY)
CY 3,742.000 $18.500 $17.000 $12.450 $19.440 $10.200 $6.300
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 4,853.000 $8.000 $7.500 $14.640 $8.710 $8.650 $6.220
BACKFILL (TY A OR B)
STA 766.000 $90.000 $100.000 $83.250 $108.450 $67.500 $79.830
FURNISH AND PLACE TOPSOIL (5")
SY 7,340.000 $8.000 $3.750 $1.090 $5.850 $3.550 $2.870
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 27,442.000 $0.270 $0.270 $0.380 $0.280 $0.400 $0.400
CELL FBR MLCH SEED(TEMP)(WARM)
SY 13,722.000 $0.270 $0.270 $0.300 $0.280 $0.350 $0.320
CELL FBR MLCH SEED(TEMP)(COOL)
SY 13,722.000 $0.270 $0.270 $0.300 $0.280 $0.350 $0.320
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 7,246.000 $36.000 $37.000 $67.280 $40.910 $82.400 $66.720
PRIME COAT (MC-30)
GAL 4,006.000 $3.000 $5.000 $4.590 $4.150 $4.000 $3.730
EMULS ASPH (EROSN CONT)(SS-1)
GAL 8,414.000 $3.000 $3.000 $4.590 $3.180 $4.200 $2.200
AGGR(TY-PB GR-4 SAC-B)
CY 3,709.000 $69.000 $65.000 $67.200 $84.230 $48.000 $74.190
ASPH (AC-20-5TR OR AC-20XP)
GAL 149,333.000 $2.000 $2.250 $2.890 $2.990 $2.600 $2.740
LRA PAV TY-I GR-B
TON 163.000 $400.000 $155.000 $105.930 $94.640 $116.000 $145.850
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
TON 49,009.000 $67.500 $62.500 $73.440 $86.840 $80.000 $90.790
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 2,283.000 $8.750 $3.000 $3.380 $5.770 $3.200 $3.580
PLANE ASPH CONC PAV(0" TO 1")
SY 2,934.000 $2.500 $4.000 $2.850 $3.690 $1.650 $2.770
PLANE ASPH CONC PAV (1")
SY 1,442.000 $2.500 $4.000 $4.430 $4.200 $1.800 $5.600
PAV JT UNDERSEAL (24")
LF 230.000 $19.250 $30.000 $31.000 $31.730 $33.650 $32.550
CEM STABIL BKFL
CY 4.000 $200.000 $475.000 $262.490 $255.900 $270.000 $262.500
FLOWABLE BACKFILL
CY 15.000 $200.000 $490.000 $467.240 $455.500 $480.000 $467.250
TEMPORARY SPL SHORING
SF 1,380.000 $56.000 $44.000 $67.200 $65.510 $53.000 $67.200
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 220.000 $158.000 $160.000 $224.100 $179.130 $190.000 $183.750
RIPRAP (CONC)(5 IN)
CY 5.600 $715.000 $790.000 $446.240 $435.030 $460.000 $446.250
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 6.000 $130.000 $335.000 $522.880 $260.000 $540.000 $522.900
CLEANING AND SEALING EXISTING JOINTS
LF 230.000 $21.000 $21.200 $31.000 $31.730 $33.600 $32.550
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 13.000 $675.000 $540.000 $309.740 $301.960 $320.000 $309.750
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 8.000 $1,600.000 $820.000 $510.280 $497.470 $527.000 $510.300
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 11.000 $1,450.000 $1,050.000 $561.730 $547.630 $580.000 $561.750
WINGWALL (SW - 0) (HW=7 FT)
EA 1.000 $11,660.000 $7,500.000 $6,179.070 $6,023.920 $6,400.000 $6,179.250
SET (PIPE RUNNER ASSEMBLY)
EA 16.000 $3,100.000 $750.000 $771.730 $752.350 $800.000 $771.750
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $6,700.000 $4,000.000 $4,693.360 $4,575.520 $4,850.000 $4,693.500
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $6,900.000 $8,000.000 $7,672.120 $7,479.490 $7,925.000 $7,672.350
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
EA 8.000 $9,000.000 $4,750.000 $4,682.860 $4,565.290 $4,840.000 $4,683.000
SET (TY I)(S= 6 FT)(HW= 8 FT)(3:1) (C)
EA 8.000 $11,000.000 $6,000.000 $4,997.850 $4,872.370 $5,165.000 $4,998.000
CLEAN EXIST CULVERTS
EA 6.000 $2,285.000 $2,400.000 $4,199.880 $4,094.430 $3,000.000 $4,200.000
MOBILIZATION
LS 1.000 $313,158.000 $400,000.000 $533,014.330 $217,250.000 $500,000.000 $459,905.410
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $8,000.000 $8,000.000 $3,472.300 $12,723.790 $15,500.000 $9,344.450
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 248.000 $52.000 $40.000 $39.800 $35.830 $43.000 $41.790
ROCK FILTER DAMS (REMOVE)
LF 248.000 $15.150 $7.500 $7.450 $15.350 $8.000 $7.820
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $35.000 $16.450 $16.300 $17.000 $17.000 $17.120
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $11.000 $6.600 $6.550 $4.250 $7.000 $6.880
CONSTRUCTION PERIMETER FENCE
LF 745.000 $5.000 $3.300 $3.300 $4.090 $3.600 $3.470
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 28,884.000 $4.550 $4.900 $4.900 $4.610 $5.300 $5.150
BIODEG EROSN CONT LOGS (REMOVE)
LF 28,884.000 $0.750 $0.900 $0.900 $0.770 $1.000 $0.950
PTB (FUR & INST)(STEEL)
LF 300.000 $207.000 $180.000 $154.960 $167.980 $190.000 $147.010
PTB (MOVE)(STEEL)
LF 900.000 $19.000 $10.700 $18.450 $9.370 $12.500 $17.500
PTB (STKPL)(STEEL)
LF 300.000 $11.000 $10.700 $11.070 $12.240 $12.400 $10.500
CONCRETE CURB (SPECIAL)
LF 98.000 $44.000 $40.400 $33.600 $40.950 $34.700 $33.600
RUMBLE STRIPS (SHOULDER)
LF 153,898.000 $0.160 $0.130 $0.140 $0.130 $0.150 $0.150
RUMBLE STRIPS (CENTERLINE)
LF 76,484.000 $0.220 $0.170 $0.140 $0.170 $0.150 $0.150
MTL W-BEAM GD FEN (STEEL POST)
LF 1,800.000 $18.250 $22.000 $23.860 $22.520 $25.000 $23.100
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,550.000 $1,800.000 $2,494.530 $1,842.490 $2,300.000 $2,100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $925.000 $1,000.000 $1,084.580 $1,023.600 $1,300.000 $1,050.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $25.500 $22.000 $23.860 $22.520 $25.000 $21.000
REMOVE METAL BEAM GUARD FENCE
LF 2,355.000 $2.000 $2.500 $2.710 $2.560 $4.350 $2.100
GUARDRAIL END TREATMENT (INSTALL)
EA 13.000 $2,250.000 $2,550.000 $2,386.070 $2,251.930 $2,985.000 $2,205.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $2,300.000 $1,275.000 $1,557.720 $487.180 $542.000 $1,551.580
CRASH CUSH ATTEN (STKPL)
EA 2.000 $1,115.000 $635.000 $934.200 $603.580 $270.000 $930.520
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,250.000 $10,200.000 $13,085.260 $8,604.150 $12,265.000 $13,033.720
WIRE FENCE (TY C)
LF 40.000 $15.000 $14.000 $50.000 $51.180 $54.000 $52.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 20.000 $500.000 $655.000 $715.350 $665.340 $840.000 $813.750
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 5.000 $725.000 $800.000 $880.430 $818.880 $1,084.000 $1,050.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,000.000 $1,000.000 $1,100.540 $1,023.610 $1,193.000 $1,155.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $380.000 $450.000 $495.240 $460.620 $813.000 $787.500
REMOVE SM RD SN SUP&AM
EA 30.000 $110.000 $150.000 $165.080 $153.540 $108.000 $105.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 22.000 $12.000 $25.000 $27.510 $25.590 $22.420 $21.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 20.000 $18.000 $25.000 $27.510 $25.590 $22.420 $21.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 56.000 $18.000 $25.000 $27.510 $25.590 $22.420 $21.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 28.000 $66.000 $55.000 $60.530 $56.300 $146.000 $141.750
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,374.000 $2.000 $1.500 $1.760 $1.770 $0.850 $2.100
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,268.000 $1.610 $1.500 $1.760 $1.810 $0.850 $2.100
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 510.000 $0.610 $0.550 $0.550 $0.560 $0.620 $0.580
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 13.000 $12.140 $12.100 $12.000 $12.280 $13.000 $12.600
REFL PAV MRK TY II (W) 4" (BRK)
LF 12,633.000 $0.130 $0.100 $0.110 $0.110 $0.100 $0.120
REFL PAV MRK TY II (W) 4" (SLD)
LF 153,898.000 $0.120 $0.100 $0.100 $0.100 $0.100 $0.110
REFL PAV MRK TY II (W) 8" (SLD)
LF 510.000 $0.250 $0.200 $0.200 $0.200 $0.200 $0.210
REFL PAV MRK TY II (W) 24" (SLD)
LF 13.000 $3.030 $2.500 $2.500 $2.560 $2.700 $2.630
REFL PAV MRK TY II (Y) 4" (BRK)
LF 10,685.000 $0.130 $0.110 $0.110 $0.110 $0.100 $0.120
REFL PAV MRK TY II (Y) 4" (SLD)
LF 113,281.000 $0.120 $0.100 $0.100 $0.100 $0.100 $0.110
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 12,633.000 $0.300 $0.270 $0.270 $0.280 $0.300 $0.280
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 153,898.000 $0.280 $0.260 $0.260 $0.270 $0.300 $0.270
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 10,685.000 $0.280 $0.270 $0.270 $0.280 $0.300 $0.280
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 113,281.000 $0.280 $0.260 $0.260 $0.270 $0.300 $0.270
PREFAB PAV MRK TY C (W) (4") (DOT)
LF 525.000 $2.020 $2.000 $2.000 $2.050 $2.150 $2.100
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $217.450 $200.000 $200.000 $204.730 $217.000 $210.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $278.140 $265.000 $265.000 $271.260 $287.500 $278.250
REFL PAV MRKR TY I-C
EA 650.000 $4.000 $4.050 $4.050 $4.150 $4.400 $4.250
REFL PAV MRKR TY II-A-A
EA 2,074.000 $3.690 $3.900 $3.900 $3.990 $4.250 $4.100
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 355.000 $36.500 $65.700 $69.110 $42.990 $45.550 $44.100
Totals: $6,070,340.700 $5,713,900.340 $6,812,856.814 $7,069,433.248 $7,087,602.960 $7,424,020.080