PREPARING ROW
|
STA
|
104.000
|
$500.000
|
$500.000
|
$1,465.860
|
$980.730
|
$440.000
|
$259.340
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
8,961.000
|
$4.500
|
$4.000
|
$4.360
|
$4.380
|
$4.300
|
$1.730
|
|
|
REMOVING STAB BASE AND ASPH PAV (5")
|
SY
|
7,340.000
|
$3.000
|
$2.500
|
$2.780
|
$3.010
|
$4.000
|
$1.360
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,742.000
|
$18.500
|
$17.000
|
$12.450
|
$19.440
|
$10.200
|
$6.300
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
4,853.000
|
$8.000
|
$7.500
|
$14.640
|
$8.710
|
$8.650
|
$6.220
|
|
|
BACKFILL (TY A OR B)
|
STA
|
766.000
|
$90.000
|
$100.000
|
$83.250
|
$108.450
|
$67.500
|
$79.830
|
|
|
FURNISH AND PLACE TOPSOIL (5")
|
SY
|
7,340.000
|
$8.000
|
$3.750
|
$1.090
|
$5.850
|
$3.550
|
$2.870
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
27,442.000
|
$0.270
|
$0.270
|
$0.380
|
$0.280
|
$0.400
|
$0.400
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
13,722.000
|
$0.270
|
$0.270
|
$0.300
|
$0.280
|
$0.350
|
$0.320
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
13,722.000
|
$0.270
|
$0.270
|
$0.300
|
$0.280
|
$0.350
|
$0.320
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
7,246.000
|
$36.000
|
$37.000
|
$67.280
|
$40.910
|
$82.400
|
$66.720
|
|
|
PRIME COAT (MC-30)
|
GAL
|
4,006.000
|
$3.000
|
$5.000
|
$4.590
|
$4.150
|
$4.000
|
$3.730
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
8,414.000
|
$3.000
|
$3.000
|
$4.590
|
$3.180
|
$4.200
|
$2.200
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
3,709.000
|
$69.000
|
$65.000
|
$67.200
|
$84.230
|
$48.000
|
$74.190
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
149,333.000
|
$2.000
|
$2.250
|
$2.890
|
$2.990
|
$2.600
|
$2.740
|
|
|
LRA PAV TY-I GR-B
|
TON
|
163.000
|
$400.000
|
$155.000
|
$105.930
|
$94.640
|
$116.000
|
$145.850
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
49,009.000
|
$67.500
|
$62.500
|
$73.440
|
$86.840
|
$80.000
|
$90.790
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
2,283.000
|
$8.750
|
$3.000
|
$3.380
|
$5.770
|
$3.200
|
$3.580
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
2,934.000
|
$2.500
|
$4.000
|
$2.850
|
$3.690
|
$1.650
|
$2.770
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
1,442.000
|
$2.500
|
$4.000
|
$4.430
|
$4.200
|
$1.800
|
$5.600
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
230.000
|
$19.250
|
$30.000
|
$31.000
|
$31.730
|
$33.650
|
$32.550
|
|
|
CEM STABIL BKFL
|
CY
|
4.000
|
$200.000
|
$475.000
|
$262.490
|
$255.900
|
$270.000
|
$262.500
|
|
|
FLOWABLE BACKFILL
|
CY
|
15.000
|
$200.000
|
$490.000
|
$467.240
|
$455.500
|
$480.000
|
$467.250
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,380.000
|
$56.000
|
$44.000
|
$67.200
|
$65.510
|
$53.000
|
$67.200
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
220.000
|
$158.000
|
$160.000
|
$224.100
|
$179.130
|
$190.000
|
$183.750
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
5.600
|
$715.000
|
$790.000
|
$446.240
|
$435.030
|
$460.000
|
$446.250
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
6.000
|
$130.000
|
$335.000
|
$522.880
|
$260.000
|
$540.000
|
$522.900
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
230.000
|
$21.000
|
$21.200
|
$31.000
|
$31.730
|
$33.600
|
$32.550
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
13.000
|
$675.000
|
$540.000
|
$309.740
|
$301.960
|
$320.000
|
$309.750
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
8.000
|
$1,600.000
|
$820.000
|
$510.280
|
$497.470
|
$527.000
|
$510.300
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
11.000
|
$1,450.000
|
$1,050.000
|
$561.730
|
$547.630
|
$580.000
|
$561.750
|
|
|
WINGWALL (SW - 0) (HW=7 FT)
|
EA
|
1.000
|
$11,660.000
|
$7,500.000
|
$6,179.070
|
$6,023.920
|
$6,400.000
|
$6,179.250
|
|
|
SET (PIPE RUNNER ASSEMBLY)
|
EA
|
16.000
|
$3,100.000
|
$750.000
|
$771.730
|
$752.350
|
$800.000
|
$771.750
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
2.000
|
$6,700.000
|
$4,000.000
|
$4,693.360
|
$4,575.520
|
$4,850.000
|
$4,693.500
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$6,900.000
|
$8,000.000
|
$7,672.120
|
$7,479.490
|
$7,925.000
|
$7,672.350
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
8.000
|
$9,000.000
|
$4,750.000
|
$4,682.860
|
$4,565.290
|
$4,840.000
|
$4,683.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 8 FT)(3:1) (C)
|
EA
|
8.000
|
$11,000.000
|
$6,000.000
|
$4,997.850
|
$4,872.370
|
$5,165.000
|
$4,998.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
6.000
|
$2,285.000
|
$2,400.000
|
$4,199.880
|
$4,094.430
|
$3,000.000
|
$4,200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$313,158.000
|
$400,000.000
|
$533,014.330
|
$217,250.000
|
$500,000.000
|
$459,905.410
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$8,000.000
|
$8,000.000
|
$3,472.300
|
$12,723.790
|
$15,500.000
|
$9,344.450
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
248.000
|
$52.000
|
$40.000
|
$39.800
|
$35.830
|
$43.000
|
$41.790
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
248.000
|
$15.150
|
$7.500
|
$7.450
|
$15.350
|
$8.000
|
$7.820
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$35.000
|
$16.450
|
$16.300
|
$17.000
|
$17.000
|
$17.120
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$11.000
|
$6.600
|
$6.550
|
$4.250
|
$7.000
|
$6.880
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
745.000
|
$5.000
|
$3.300
|
$3.300
|
$4.090
|
$3.600
|
$3.470
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
28,884.000
|
$4.550
|
$4.900
|
$4.900
|
$4.610
|
$5.300
|
$5.150
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
28,884.000
|
$0.750
|
$0.900
|
$0.900
|
$0.770
|
$1.000
|
$0.950
|
|
|
PTB (FUR & INST)(STEEL)
|
LF
|
300.000
|
$207.000
|
$180.000
|
$154.960
|
$167.980
|
$190.000
|
$147.010
|
|
|
PTB (MOVE)(STEEL)
|
LF
|
900.000
|
$19.000
|
$10.700
|
$18.450
|
$9.370
|
$12.500
|
$17.500
|
|
|
PTB (STKPL)(STEEL)
|
LF
|
300.000
|
$11.000
|
$10.700
|
$11.070
|
$12.240
|
$12.400
|
$10.500
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
98.000
|
$44.000
|
$40.400
|
$33.600
|
$40.950
|
$34.700
|
$33.600
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
153,898.000
|
$0.160
|
$0.130
|
$0.140
|
$0.130
|
$0.150
|
$0.150
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
76,484.000
|
$0.220
|
$0.170
|
$0.140
|
$0.170
|
$0.150
|
$0.150
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,800.000
|
$18.250
|
$22.000
|
$23.860
|
$22.520
|
$25.000
|
$23.100
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,550.000
|
$1,800.000
|
$2,494.530
|
$1,842.490
|
$2,300.000
|
$2,100.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$925.000
|
$1,000.000
|
$1,084.580
|
$1,023.600
|
$1,300.000
|
$1,050.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
50.000
|
$25.500
|
$22.000
|
$23.860
|
$22.520
|
$25.000
|
$21.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,355.000
|
$2.000
|
$2.500
|
$2.710
|
$2.560
|
$4.350
|
$2.100
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
13.000
|
$2,250.000
|
$2,550.000
|
$2,386.070
|
$2,251.930
|
$2,985.000
|
$2,205.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$2,300.000
|
$1,275.000
|
$1,557.720
|
$487.180
|
$542.000
|
$1,551.580
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$1,115.000
|
$635.000
|
$934.200
|
$603.580
|
$270.000
|
$930.520
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$9,250.000
|
$10,200.000
|
$13,085.260
|
$8,604.150
|
$12,265.000
|
$13,033.720
|
|
|
WIRE FENCE (TY C)
|
LF
|
40.000
|
$15.000
|
$14.000
|
$50.000
|
$51.180
|
$54.000
|
$52.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
20.000
|
$500.000
|
$655.000
|
$715.350
|
$665.340
|
$840.000
|
$813.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
5.000
|
$725.000
|
$800.000
|
$880.430
|
$818.880
|
$1,084.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,000.000
|
$1,000.000
|
$1,100.540
|
$1,023.610
|
$1,193.000
|
$1,155.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$380.000
|
$450.000
|
$495.240
|
$460.620
|
$813.000
|
$787.500
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
30.000
|
$110.000
|
$150.000
|
$165.080
|
$153.540
|
$108.000
|
$105.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
22.000
|
$12.000
|
$25.000
|
$27.510
|
$25.590
|
$22.420
|
$21.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
20.000
|
$18.000
|
$25.000
|
$27.510
|
$25.590
|
$22.420
|
$21.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
56.000
|
$18.000
|
$25.000
|
$27.510
|
$25.590
|
$22.420
|
$21.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
28.000
|
$66.000
|
$55.000
|
$60.530
|
$56.300
|
$146.000
|
$141.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,374.000
|
$2.000
|
$1.500
|
$1.760
|
$1.770
|
$0.850
|
$2.100
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,268.000
|
$1.610
|
$1.500
|
$1.760
|
$1.810
|
$0.850
|
$2.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
510.000
|
$0.610
|
$0.550
|
$0.550
|
$0.560
|
$0.620
|
$0.580
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
13.000
|
$12.140
|
$12.100
|
$12.000
|
$12.280
|
$13.000
|
$12.600
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
12,633.000
|
$0.130
|
$0.100
|
$0.110
|
$0.110
|
$0.100
|
$0.120
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
153,898.000
|
$0.120
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.110
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
510.000
|
$0.250
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.210
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
13.000
|
$3.030
|
$2.500
|
$2.500
|
$2.560
|
$2.700
|
$2.630
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
10,685.000
|
$0.130
|
$0.110
|
$0.110
|
$0.110
|
$0.100
|
$0.120
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
113,281.000
|
$0.120
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.110
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
12,633.000
|
$0.300
|
$0.270
|
$0.270
|
$0.280
|
$0.300
|
$0.280
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
153,898.000
|
$0.280
|
$0.260
|
$0.260
|
$0.270
|
$0.300
|
$0.270
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
10,685.000
|
$0.280
|
$0.270
|
$0.270
|
$0.280
|
$0.300
|
$0.280
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
113,281.000
|
$0.280
|
$0.260
|
$0.260
|
$0.270
|
$0.300
|
$0.270
|
|
PREFAB PAV MRK TY C (W) (4") (DOT)
|
LF
|
525.000
|
$2.020
|
$2.000
|
$2.000
|
$2.050
|
$2.150
|
$2.100
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$217.450
|
$200.000
|
$200.000
|
$204.730
|
$217.000
|
$210.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$278.140
|
$265.000
|
$265.000
|
$271.260
|
$287.500
|
$278.250
|
|
REFL PAV MRKR TY I-C
|
EA
|
650.000
|
$4.000
|
$4.050
|
$4.050
|
$4.150
|
$4.400
|
$4.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,074.000
|
$3.690
|
$3.900
|
$3.900
|
$3.990
|
$4.250
|
$4.100
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
355.000
|
$36.500
|
$65.700
|
$69.110
|
$42.990
|
$45.550
|
$44.100
|
|
Totals: |
$6,070,340.700
|
$5,713,900.340
|
$6,812,856.814
|
$7,069,433.248
|
$7,087,602.960
|
$7,424,020.080
|