KERR IH 10 (0142-02-029)

Items: 140

County: KERR
Length: N/A
Highway: IH 10
District: SAN ANTONIO
Control Number: 0142-02-029
DBE Goal: N/A
Project: C 142-2-29
Guaranty: N/A
Time: 128 WORKING DAYS
Engineer's Estimate: $15,062,463.35
Date: 03/05/2019 (7 years ago)
Contract Number: N/A
Type: BASE REPAIR, SEAL, OVERLAY & PAV MRKNGS ON MAINLNS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$15,062,463.35
$17,870,936.37
Over/Under Est: 18.65% $2,808,473.02
Over/Under Est: 21% $3,163,349.30
Amt Left: 1.99% $354,876.28
Over/Under Est: 26.91% $4,053,124.55
Amt Left: 6.96% $1,244,651.53
Delta: -4.88% -$889,775.25
$19,220,250.08
Over/Under Est: 27.6% $4,157,786.73
Amt Left: 7.55% $1,349,313.71
Delta: -0.55% -$104,662.18

Bid Items & Bid Tabulations

140 Total 0 of 140
KERR  |  IH 10  |  SAN ANTONIO  |  0142-02-029  |  03/05/2019  |  $15,062,463.35  |  C 142-2-29  |  BASE REPAIR, SEAL, OVERLAY & PAV MRK...  |  128 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONE STAR PAVING COMPANY
ANGEL BROTHERS HOLDINGS CORP.
CLARK CONSTRUCTION OF TEXAS, INC.
HUNTER INDUSTRIES, LTD.
REMOVING CONCRETE(MOW STRIP)
LF 1,524.000 $8.880 $5.000 $15.000 $10.500 $12.270
BACKFILL (TY A)
STA 1,612.000 $3.250 $75.000 $80.000 $100.000 $240.900
COMPOST MANUF TOPSOIL
CY 100.000 $49.130 $65.000 $170.000 $71.500 $75.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 1,600.000 $0.300 $1.000 $1.700 $0.790 $0.750
VEGETATIVE WATERING
MG 239.000 $19.670 $20.000 $60.000 $100.000 $29.970
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 15,333.000 $1.000 $1.000 $1.250 $0.900 $1.100
PRIME COAT(MC-30 OR AE-P)
GAL 27,294.000 $4.030 $3.000 $2.500 $3.250 $4.150
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 272,783.000 $1.500 $0.000 $0.000 $0.000 $2.970
AGGR (TY-PB GR-4)
CY 7,669.000 $45.000 $0.000 $0.000 $0.000 $66.810
PFC (ASPHALT) PG76-22
TON 3,073.000 $80.000 $0.000 $0.000 $0.000 $111.870
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 48,168.000 $80.050 $0.000 $0.000 $0.000 $111.870
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 21,592.000 $68.000 $90.000 $90.000 $112.910 $81.810
SUPERPAVE MIXTURES SP-D PG70-22
TON 81,690.000 $43.480 $0.000 $0.000 $0.000 $0.000
TBPFC (MEMBRANE)
GAL 215,757.000 $2.000 $3.000 $2.500 $3.000 $0.000
TBPFC (MEMBRANE)
GAL 215,757.000 $2.000 $0.000 $0.000 $0.000 $0.000
TBPFC (ASPHALT)(PG 76-22)
TON 3,073.000 $80.000 $0.000 $0.000 $0.000 $0.000
TBPFC (ASPHALT)(PG 76-22)
TON 3,073.000 $80.000 $105.000 $700.000 $144.030 $0.000
TBPFC (AGGREGATE) (SAC-A)
TON 48,168.000 $80.000 $0.000 $0.000 $0.000 $0.000
TBPFC (AGGREGATE) (SAC-A)
TON 48,168.000 $80.000 $105.000 $85.950 $144.030 $0.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 33,662.000 $40.000 $50.000 $50.000 $50.900 $39.680
PLANE ASPH CONC PAV(0" TO 4")
SY 35,512.000 $1.300 $2.000 $3.300 $2.250 $2.560
PLANE ASPH CONC PAV (2")
SY 900,522.000 $1.200 $0.000 $0.000 $0.000 $0.000
PLANE ASPH CONC PAV (2")
SY 190,083.000 $1.200 $1.500 $1.250 $1.690 $0.000
PLANE ASPH CONC PAV (2")
SY 190,083.000 $1.200 $0.000 $0.000 $0.000 $1.490
HIR (SURFACE) (2")
SY 710,439.000 $6.200 $5.000 $5.000 $4.790 $0.000
HIR (SURFACE) (2")
SY 710,439.000 $6.200 $0.000 $0.000 $0.000 $5.540
HIR (RECYCLING AGENT)
GAL 177,610.000 $4.000 $0.000 $0.000 $0.000 $3.670
HIR (RECYCLING AGENT)
GAL 177,610.000 $4.000 $3.500 $3.500 $3.920 $0.000
RIPRAP (MOW STRIP)(4 IN)
CY 78.000 $430.000 $500.000 $570.000 $520.800 $671.520
CLEANING AND SEALING EXISTING JOINTS
LF 2,677.075 $9.320 $6.000 $9.700 $8.930 $8.630
RAIL (HANDRAIL)(TY E)
LF 62.000 $105.000 $125.000 $140.000 $130.290 $163.020
RETROFIT RAIL (TY C221)
LF 270.000 $250.000 $40.000 $192.000 $40.850 $230.000
HEADER TYPE EXPANSION JOINT
CF 447.000 $340.000 $400.000 $430.000 $398.230 $404.490
JOINT SEALANT
LF 2,677.075 $6.650 $9.000 $7.500 $6.830 $6.930
CLEAN EXIST CULVERTS
EA 2.000 $2,500.000 $2,500.000 $1,700.000 $525.000 $1,800.000
MOBILIZATION
LS 1.000 $1,030,765.000 $1,700,000.000 $1,175,000.000 $400,000.000 $1,774,685.430
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $8,500.000 $15,000.000 $15,000.000 $3,500.000 $3,072.580
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 680.000 $28.860 $25.000 $28.500 $27.800 $25.000
ROCK FILTER DAMS (REMOVE)
LF 680.000 $8.530 $8.000 $12.000 $7.880 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,260.000 $2.260 $2.500 $2.500 $3.410 $2.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,260.000 $0.650 $1.000 $0.800 $0.790 $0.750
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 460.000 $4.200 $3.500 $4.000 $5.250 $3.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 460.000 $1.250 $0.500 $0.600 $1.050 $0.500
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 216.000 $90.000 $125.000 $75.000 $100.000 $102.600
CONC SIDEWALKS (4")
SY 35.000 $50.000 $100.000 $230.000 $157.500 $80.000
RUMBLE STRIPS (SHOULDER)
LF 322,336.000 $0.230 $0.150 $0.150 $0.170 $0.130
MTL W-BEAM GD FEN (TIM POST)
LF 900.000 $18.940 $20.000 $23.000 $21.260 $26.320
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 22.000 $1,800.000 $1,700.000 $2,000.000 $1,520.400 $1,752.660
MTL BEAM GD FEN TRANS (T101)
EA 4.000 $1,400.000 $1,000.000 $1,200.000 $1,304.100 $1,241.710
MTL BEAM GD FEN TRANS (T6)
EA 4.000 $1,225.000 $800.000 $600.000 $794.850 $990.840
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,200.000 $1,000.000 $1,000.000 $1,128.750 $1,268.180
REMOVE METAL BEAM GUARD FENCE
LF 900.000 $1.380 $1.250 $2.300 $1.310 $1.150
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $216.530 $125.000 $143.000 $131.250 $166.870
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 17.000 $430.300 $100.000 $200.000 $105.000 $29.920
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,417.800 $2,500.000 $3,120.000 $2,866.500 $3,010.480
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $238.440 $200.000 $250.000 $131.250 $224.410
CONDT (PVC) (SCH 80) (2")
LF 100.000 $20.000 $20.000 $20.000 $18.900 $18.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 200.000 $30.000 $30.000 $29.000 $27.300 $26.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 3,659.000 $24.000 $27.000 $22.000 $36.750 $20.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 3,797.000 $25.000 $33.000 $30.000 $30.980 $29.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $550.000 $450.000 $530.000 $455.760 $434.060
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 15.000 $600.000 $500.000 $720.000 $542.670 $516.830
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 2.000 $650.000 $550.000 $720.000 $555.870 $529.400
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 10.000 $640.000 $650.000 $821.000 $378.270 $645.970
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $730.000 $700.000 $916.000 $687.350 $654.620
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $875.000 $700.000 $1,120.000 $726.520 $691.920
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 1.000 $1,100.000 $900.000 $1,162.000 $878.850 $837.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 1.000 $650.000 $700.000 $1,040.000 $716.020 $681.920
IN SM RD SN SUP&AM TYS80(1)SB(U-WC)
EA 1.000 $1,100.000 $700.000 $1,200.000 $726.520 $691.920
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 9.000 $1,050.000 $1,500.000 $1,615.000 $1,501.350 $1,429.860
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $1,600.000 $1,600.000 $1,800.000 $1,658.740 $1,579.750
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 286.000 $65.000 $45.000 $55.000 $44.400 $42.290
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 46.000 $20.000 $10.000 $24.000 $11.550 $11.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 179.000 $60.000 $45.000 $82.000 $45.410 $43.250
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 46.000 $15.000 $10.000 $24.000 $11.550 $11.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 46.000 $60.000 $45.000 $80.200 $44.630 $42.500
INSTL OM ASSM (OM-1)(FLX)GND
EA 20.000 $60.000 $130.000 $200.000 $136.500 $130.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 5.000 $60.000 $45.000 $82.100 $46.030 $43.840
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $70.000 $45.000 $84.250 $47.600 $45.330
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 14.000 $78.000 $80.000 $107.000 $82.900 $78.950
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 71.000 $24.000 $15.000 $31.000 $15.170 $14.450
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 82.000 $20.000 $15.000 $30.000 $15.170 $14.450
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 80,702.000 $0.250 $0.350 $0.340 $0.260 $0.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 161,404.000 $0.250 $0.300 $0.270 $0.260 $0.400
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 161,404.000 $0.250 $0.300 $0.270 $0.260 $0.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,733.000 $1.000 $1.000 $1.000 $0.890 $1.480
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 735.000 $5.300 $6.000 $6.000 $5.250 $8.850
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 12.000 $100.000 $120.000 $120.000 $99.750 $177.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 1.000 $145.000 $1,000.000 $1,000.000 $131.250 $1,475.020
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 10.000 $185.000 $130.000 $120.000 $125.000 $177.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 11.000 $120.000 $150.000 $140.000 $131.250 $206.500
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 10.000 $850.000 $750.000 $700.000 $315.000 $1,032.520
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 10.000 $850.000 $750.000 $700.000 $315.000 $1,032.520
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 74.000 $34.000 $50.000 $50.000 $26.250 $73.750
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 2.000 $300.000 $360.000 $500.000 $262.500 $737.510
REFL PAV MRK TY II (W) 4" (BRK)
LF 4,880.000 $0.500 $0.150 $0.150 $0.210 $0.220
REFL PAV MRK TY II (W) 4" (SLD)
LF 28,772.000 $0.500 $0.150 $0.130 $0.210 $0.190
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,515.000 $1.000 $0.300 $0.300 $0.260 $0.440
REFL PAV MRK TY II (W) 24" (SLD)
LF 597.000 $3.000 $3.000 $3.000 $1.050 $4.430
REFL PAV MRK TY II (Y) 4" (BRK)
LF 4,560.000 $0.500 $0.150 $0.150 $0.210 $0.220
REFL PAV MRK TY II (Y) 4" (SLD)
LF 29,163.000 $0.500 $0.150 $0.130 $0.210 $0.190
PAVEMENT SEALER 4"
LF 42,274.000 $0.100 $0.150 $0.130 $0.210 $0.190
PAVEMENT SEALER 6"
LF 441,357.000 $0.140 $0.200 $0.160 $0.260 $0.240
PAVEMENT SEALER 8"
LF 1,733.000 $0.350 $0.300 $0.300 $0.320 $0.440
PAVEMENT SEALER 24"
LF 735.000 $2.150 $2.000 $2.000 $1.050 $2.950
PAVEMENT SEALER (ARROW)
EA 12.000 $40.000 $65.000 $60.000 $15.750 $88.500
PAVEMENT SEALER (WORD)
EA 11.000 $56.000 $65.000 $70.000 $15.750 $103.250
PAVEMENT SEALER (MED NOSE)
EA 2.000 $180.000 $500.000 $500.000 $26.250 $737.510
PAVEMENT SEALER (DBL ARROW)
EA 1.000 $110.000 $100.000 $90.000 $57.750 $132.750
PAVEMENT SEALER (ENTR GORE)
EA 10.000 $350.000 $300.000 $300.000 $105.000 $442.510
PAVEMENT SEALER (EXIT GORE)
EA 10.000 $350.000 $300.000 $300.000 $210.000 $442.510
PAVEMENT SEALER (YLD TRI)
EA 65.000 $20.000 $30.000 $30.000 $15.750 $44.250
PAVEMENT SEALER (NUMBER)
EA 10.000 $95.000 $25.000 $25.000 $26.250 $36.880
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,102.000 $0.500 $0.500 $0.500 $0.370 $0.740
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 40,420.000 $0.600 $0.550 $0.570 $0.440 $0.840
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 214,717.000 $0.500 $0.550 $0.470 $0.440 $0.690
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,627.000 $0.280 $0.750 $0.750 $0.370 $1.110
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 37,545.000 $0.290 $0.400 $0.380 $0.370 $0.560
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 186,220.000 $0.510 $0.500 $0.470 $0.440 $0.690
REFL PAV MRKR TY I-C
EA 373.000 $3.150 $4.000 $4.000 $3.150 $5.900
REFL PAV MRKR TY I-R
EA 140.000 $5.000 $10.000 $10.000 $26.250 $14.750
REFL PAV MRKR TY II-A-A
EA 1,492.000 $3.000 $3.500 $3.500 $3.150 $5.160
REFL PAV MRKR TY II-C-R
EA 2,020.000 $3.200 $3.500 $3.500 $4.200 $5.160
INSTALL HWY TRF SIG (UPGRADE)
EA 2.000 $2,500.000 $1,750.000 $2,000.000 $1,575.000 $1,500.000
TREE TRIMMING / BRUSH REMOVAL
MI 1.200 $15,000.000 $20,000.000 $23,000.000 $22,500.000 $31,500.000
MEMBRANE UNDERSEAL
GAL 50,203.000 $4.000 $0.000 $0.000 $0.000 $0.000
MEMBRANE UNDERSEAL
GAL 50,203.000 $4.000 $2.500 $2.500 $3.000 $0.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 292.000 $110.000 $65.000 $100.000 $100.000 $151.990
CONDUIT (PREPARE)
LF 530.000 $3.500 $5.000 $5.000 $4.730 $4.500
GROUND BOX (PREPARE)
EA 11.000 $160.000 $100.000 $110.000 $105.000 $100.000
TMA (STATIONARY)
DAY 76.000 $200.000 $150.000 $200.000 $400.000 $227.980
TMA (MOBILE OPERATION)
HR 120.000 $45.000 $75.000 $90.000 $50.000 $101.330
TMA (MOBILE OPERATION)
DAY 172.000 $130.480 $250.000 $200.000 $400.000 $202.650
RVDS(PRESENCE DETECTION ONLY)
EA 8.000 $6,500.000 $8,000.000 $9,000.000 $8,190.000 $7,800.000
1
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 272,783.000 $1.500 $0.000 $0.000 $0.000 $0.000
1
AGGR (TY-PB GR-4)
CY 7,669.000 $45.000 $0.000 $0.000 $0.000 $0.000
1
PFC (ASPHALT) PG76-22
TON 3,073.000 $80.000 $0.000 $0.000 $0.000 $0.000
1
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 48,168.000 $80.050 $0.000 $0.000 $0.000 $0.000
1
SUPERPAVE MIXTURES SP-D PG70-22
TON 81,690.000 $43.480 $0.000 $0.000 $0.000 $0.000
1
PLANE ASPH CONC PAV (2")
SY 900,532.000 $1.200 $0.000 $0.000 $0.000 $0.000
Totals: $44,700,818.158 $17,870,936.375 $18,225,812.660 $19,115,587.912 $19,220,250.097