|
|
PREPARING ROW
|
STA
|
690.000
|
$5,000.000
|
$11,000.000
|
$33,292.640
|
$12,500.000
|
$32,877.080
|
$35,600.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
638,687.000
|
$4.750
|
$6.000
|
$4.500
|
$6.000
|
$9.700
|
$4.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,404,144.000
|
$5.000
|
$29.000
|
$8.500
|
$29.000
|
$8.820
|
$22.000
|
|
|
BACKFILL (TY A)
|
STA
|
101.000
|
$400.000
|
$532.350
|
$2,998.490
|
$500.000
|
$694.020
|
$456.580
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
1,541,599.000
|
$0.500
|
$0.440
|
$0.440
|
$0.440
|
$0.420
|
$0.450
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
770,800.000
|
$0.500
|
$0.390
|
$0.390
|
$0.270
|
$0.260
|
$0.390
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
770,800.000
|
$0.500
|
$0.390
|
$0.390
|
$0.270
|
$0.260
|
$0.390
|
|
|
VEGETATIVE WATERING
|
MG
|
25,946.000
|
$40.000
|
$38.600
|
$22.440
|
$28.000
|
$41.680
|
$21.060
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
144,941.000
|
$50.000
|
$38.000
|
$36.550
|
$59.000
|
$56.360
|
$43.240
|
|
|
REWORK BS MTL (TY B) (8") (DENS CONT)
|
SY
|
418,499.000
|
$2.000
|
$1.250
|
$0.870
|
$5.350
|
$4.680
|
$6.470
|
|
|
REWORK BS MTL(TY B)(18"-24")(DENS CONT)
|
SY
|
145,298.000
|
$2.500
|
$3.460
|
$2.430
|
$5.000
|
$7.790
|
$13.240
|
|
|
CEMENT
|
TON
|
22,953.000
|
$200.000
|
$230.000
|
$334.070
|
$238.000
|
$210.800
|
$190.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
2,922.000
|
$10.000
|
$1.860
|
$9.660
|
$5.750
|
$7.240
|
$5.900
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(11")
|
SY
|
85,025.000
|
$3.000
|
$1.870
|
$3.330
|
$4.150
|
$4.220
|
$10.000
|
|
|
CEM TRT(MX EXST MTL & NEW BS)(14")
|
SY
|
654,942.000
|
$3.000
|
$2.130
|
$2.800
|
$3.420
|
$3.160
|
$5.000
|
|
|
CEMENT TREAT (SUBGRADE)(12")
|
SY
|
778,662.000
|
$2.750
|
$2.000
|
$2.550
|
$2.780
|
$3.130
|
$2.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (4 TO 6")
|
SY
|
145,298.000
|
$2.000
|
$2.560
|
$3.850
|
$3.860
|
$3.090
|
$5.260
|
|
|
SLV, HAUL & STKPL RCL APH PV (8 TO 10")
|
SY
|
418,499.000
|
$3.500
|
$3.750
|
$5.770
|
$6.280
|
$4.860
|
$6.170
|
|
|
PRIME COAT (MC-30)
|
GAL
|
141,312.000
|
$5.500
|
$5.000
|
$3.200
|
$6.100
|
$5.760
|
$6.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(1")
|
SY
|
7,107.000
|
$100.000
|
$9.950
|
$34.220
|
$50.000
|
$24.000
|
$27.000
|
|
|
PLAN & TEXT CONC PAV(0" TO 2")
|
SY
|
24,583.000
|
$20.000
|
$0.550
|
$1.740
|
$4.000
|
$1.830
|
$2.150
|
|
|
PLAN & TEXT ASPH CONC PAV (1.5")
|
SY
|
15,847.000
|
$6.000
|
$0.860
|
$2.210
|
$5.000
|
$2.850
|
$2.240
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
2,846.000
|
$110.000
|
$135.840
|
$198.970
|
$200.000
|
$143.300
|
$150.380
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
1,454.000
|
$85.000
|
$12.430
|
$0.940
|
$48.000
|
$31.420
|
$112.720
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
4,425.000
|
$200.000
|
$12.320
|
$140.590
|
$65.000
|
$23.520
|
$113.580
|
|
|
CEM STABIL BKFL
|
CY
|
768.000
|
$250.000
|
$123.250
|
$480.330
|
$220.000
|
$350.590
|
$380.610
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
918.000
|
$200.000
|
$102.020
|
$107.910
|
$146.000
|
$350.250
|
$83.630
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
4,207.000
|
$20.000
|
$5.660
|
$16.480
|
$4.000
|
$29.570
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,607.000
|
$17.000
|
$13.900
|
$94.390
|
$30.000
|
$119.490
|
$28.830
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
8,380.000
|
$200.000
|
$157.000
|
$201.250
|
$242.000
|
$419.680
|
$109.620
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
66.000
|
$300.000
|
$411.110
|
$400.000
|
$716.000
|
$654.000
|
$400.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
20.000
|
$600.000
|
$488.190
|
$1,200.000
|
$748.000
|
$683.000
|
$475.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
253.000
|
$267.000
|
$179.860
|
$200.000
|
$178.000
|
$175.000
|
$175.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
696.000
|
$300.000
|
$241.530
|
$235.000
|
$234.000
|
$214.000
|
$235.000
|
|
|
CL B CONC (FLUME)
|
CY
|
64.000
|
$1,500.000
|
$600.000
|
$750.950
|
$620.000
|
$839.940
|
$565.500
|
|
|
CL C CONC (ABUT)
|
CY
|
537.600
|
$1,600.000
|
$1,149.240
|
$1,901.080
|
$2,200.000
|
$2,645.000
|
$1,328.450
|
|
|
CL C CONC (MISC)
|
CY
|
181.000
|
$550.000
|
$943.890
|
$941.760
|
$1,000.000
|
$1,100.660
|
$760.150
|
|
|
REINF CONC SLAB
|
SF
|
40,800.000
|
$35.000
|
$24.000
|
$34.790
|
$33.000
|
$39.650
|
$29.440
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
4,163.000
|
$25.000
|
$23.360
|
$37.250
|
$33.000
|
$40.350
|
$36.630
|
|
|
RETAINING WALL (MSE)
|
SF
|
431,525.000
|
$80.000
|
$39.000
|
$100.000
|
$68.000
|
$103.600
|
$130.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
25,245.000
|
$40.000
|
$29.000
|
$36.600
|
$15.000
|
$15.790
|
$33.830
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
99.000
|
$250.000
|
$261.350
|
$478.530
|
$242.000
|
$662.270
|
$195.680
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
742.500
|
$275.000
|
$270.870
|
$440.570
|
$242.000
|
$662.270
|
$196.460
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
5,077.550
|
$250.000
|
$254.000
|
$325.120
|
$232.000
|
$669.400
|
$189.690
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
507.800
|
$500.000
|
$475.000
|
$676.300
|
$625.000
|
$704.660
|
$600.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
213.000
|
$300.000
|
$74.660
|
$361.200
|
$280.000
|
$524.000
|
$325.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
2,121.700
|
$490.000
|
$325.000
|
$693.420
|
$625.000
|
$576.560
|
$568.000
|
|
|
RAIL (TY SSTR)
|
LF
|
23,758.700
|
$125.000
|
$51.000
|
$76.820
|
$65.000
|
$75.870
|
$39.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
864.000
|
$225.000
|
$188.710
|
$323.550
|
$242.000
|
$250.250
|
$208.100
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
831.000
|
$460.000
|
$448.130
|
$645.770
|
$840.000
|
$680.380
|
$457.400
|
|
|
RC PIPE (CL III)(18 IN)(SPL)
|
LF
|
1,314.000
|
$100.000
|
$76.350
|
$106.220
|
$100.000
|
$122.440
|
$98.750
|
|
|
RC PIPE (CL III)(24 IN)(SPL)
|
LF
|
18,103.000
|
$130.000
|
$95.000
|
$120.000
|
$140.000
|
$117.470
|
$111.750
|
|
|
RC PIPE (CL III)(30 IN)(SPL)
|
LF
|
3,426.000
|
$180.000
|
$153.610
|
$196.890
|
$180.000
|
$166.970
|
$136.430
|
|
|
RC PIPE (CL III)(36 IN)(SPL)
|
LF
|
182.000
|
$230.000
|
$205.830
|
$352.920
|
$260.000
|
$224.540
|
$185.660
|
|
|
RC PIPE (CL III)(42 IN)(SPL)
|
LF
|
256.000
|
$230.000
|
$279.620
|
$366.680
|
$330.000
|
$278.640
|
$221.760
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
55.000
|
$8,000.000
|
$5,400.000
|
$8,036.350
|
$4,800.000
|
$4,338.370
|
$6,952.330
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
31.000
|
$6,000.000
|
$6,205.490
|
$9,237.930
|
$5,600.000
|
$6,164.650
|
$8,384.090
|
|
|
INLET (COMPL)(TY MSE1)
|
EA
|
103.000
|
$8,000.000
|
$5,215.660
|
$7,323.380
|
$6,000.000
|
$5,950.210
|
$5,046.670
|
|
|
INLET(COMPL)(WALL)(SPL)
|
EA
|
16.000
|
$4,000.000
|
$7,000.000
|
$2,504.990
|
$6,800.000
|
$8,205.280
|
$5,082.330
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
5.000
|
$12,000.000
|
$8,003.200
|
$18,601.060
|
$8,800.000
|
$9,016.690
|
$10,354.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
6.000
|
$13,000.000
|
$10,495.880
|
$20,952.410
|
$9,000.000
|
$10,522.360
|
$12,696.620
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
1.000
|
$10,000.000
|
$12,282.160
|
$20,960.110
|
$12,000.000
|
$13,019.720
|
$16,313.650
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
11.000
|
$9,000.000
|
$30,000.000
|
$43,837.710
|
$19,000.000
|
$11,302.510
|
$47,992.820
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$1,750.000
|
$4,141.940
|
$19,629.220
|
$12,000.000
|
$17,089.210
|
$15,635.040
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
|
EA
|
8.000
|
$2,500.000
|
$3,562.120
|
$28,102.420
|
$13,000.000
|
$21,572.600
|
$36,963.560
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
22.000
|
$2,250.000
|
$2,917.320
|
$4,092.150
|
$2,300.000
|
$2,269.700
|
$2,417.510
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$3,064.890
|
$4,011.440
|
$2,500.000
|
$4,002.600
|
$2,426.740
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
23.000
|
$3,000.000
|
$2,524.150
|
$4,080.180
|
$2,500.000
|
$3,642.410
|
$2,348.840
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
27.000
|
$4,200.000
|
$2,711.700
|
$4,377.590
|
$2,800.000
|
$3,625.010
|
$4,018.300
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$4,200.000
|
$3,462.370
|
$4,666.810
|
$3,700.000
|
$4,989.630
|
$4,357.190
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
20.000
|
$3,000.000
|
$3,039.050
|
$3,906.930
|
$3,700.000
|
$3,818.410
|
$3,904.470
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
11.000
|
$7,000.000
|
$3,675.540
|
$4,342.740
|
$4,200.000
|
$4,064.160
|
$4,014.480
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$8,000.000
|
$5,267.480
|
$5,947.980
|
$10,600.000
|
$4,295.540
|
$7,544.260
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$5,800.000
|
$6,037.190
|
$7,017.460
|
$14,000.000
|
$5,650.210
|
$8,523.760
|
|
|
REMOV STR (SET)
|
EA
|
84.000
|
$285.000
|
$1,147.380
|
$1,699.340
|
$670.000
|
$1,044.210
|
$751.870
|
|
|
REMOV STR (PIPE)
|
LF
|
3,818.000
|
$10.000
|
$13.680
|
$107.440
|
$25.000
|
$25.440
|
$32.160
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$16,642,690.620
|
$17,363,481.450
|
$22,971,923.730
|
$23,240,000.000
|
$23,500,000.000
|
$24,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
53.000
|
$12,000.000
|
$20,580.960
|
$13,710.580
|
$28,000.000
|
$200,000.000
|
$25,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,065.000
|
$100.000
|
$51.410
|
$51.410
|
$43.000
|
$51.410
|
$50.730
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,885.000
|
$50.000
|
$14.000
|
$14.000
|
$25.000
|
$14.000
|
$23.750
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$30.000
|
$63.620
|
$63.620
|
$46.000
|
$63.620
|
$21.320
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$15.000
|
$13.200
|
$13.200
|
$30.000
|
$13.200
|
$28.950
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
108,579.000
|
$6.000
|
$3.140
|
$3.140
|
$4.000
|
$3.140
|
$2.430
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
108,579.000
|
$2.000
|
$0.910
|
$0.910
|
$2.000
|
$0.910
|
$1.450
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,450.000
|
$7.000
|
$7.470
|
$7.470
|
$8.000
|
$7.470
|
$5.930
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,450.000
|
$2.000
|
$1.000
|
$1.000
|
$2.000
|
$1.000
|
$1.550
|
|
|
CONSTRUCTING DETOURS
|
SY
|
392,978.000
|
$40.000
|
$41.990
|
$60.000
|
$55.000
|
$45.740
|
$30.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
44,100.000
|
$45.000
|
$35.000
|
$85.600
|
$35.000
|
$85.200
|
$75.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
476,303.000
|
$15.000
|
$3.100
|
$8.750
|
$9.000
|
$3.700
|
$6.150
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
241,470.000
|
$12.000
|
$4.200
|
$7.250
|
$12.000
|
$5.030
|
$2.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
43,920.000
|
$10.000
|
$6.330
|
$9.650
|
$14.000
|
$34.600
|
$9.060
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,749.000
|
$50.000
|
$65.000
|
$10.310
|
$85.000
|
$85.080
|
$89.470
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
248,963.000
|
$0.150
|
$0.090
|
$0.090
|
$0.100
|
$0.210
|
$0.080
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,125.000
|
$25.000
|
$24.550
|
$26.230
|
$29.000
|
$24.550
|
$26.230
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
22.000
|
$1,650.000
|
$2,190.000
|
$2,069.760
|
$3,000.000
|
$2,190.000
|
$2,069.760
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
13.000
|
$2,300.000
|
$1,475.000
|
$1,295.420
|
$1,420.000
|
$1,475.000
|
$1,295.420
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
6,636.000
|
$15.000
|
$18.750
|
$14.170
|
$18.000
|
$18.750
|
$14.170
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
11.000
|
$4,000.000
|
$3,645.000
|
$2,629.410
|
$2,900.000
|
$3,645.000
|
$2,629.410
|
|
|
REMOVE CABLE BARRIER
|
LF
|
6,249.000
|
$20.000
|
$4.750
|
$5.000
|
$12.000
|
$4.750
|
$5.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
3.000
|
$550.000
|
$225.000
|
$426.340
|
$460.000
|
$225.000
|
$426.340
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
33.000
|
$3,500.000
|
$3,369.000
|
$3,510.570
|
$3,840.000
|
$3,369.000
|
$3,510.570
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
154.000
|
$2,400.000
|
$225.000
|
$1,309.720
|
$1,300.000
|
$225.000
|
$1,309.720
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
85.000
|
$1,200.000
|
$1,250.000
|
$1,182.370
|
$1,400.000
|
$1,150.000
|
$1,182.370
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
16.000
|
$10,000.000
|
$16,500.000
|
$9,941.220
|
$19,200.000
|
$20,000.000
|
$9,941.220
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
9,870.000
|
$100.000
|
$61.550
|
$61.550
|
$50.000
|
$61.550
|
$61.550
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
8.000
|
$1,100.000
|
$1,361.800
|
$1,325.000
|
$970.000
|
$889.000
|
$1,325.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
87.000
|
$2,700.000
|
$4,624.990
|
$4,500.000
|
$5,200.000
|
$4,677.000
|
$4,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
17,514.000
|
$10.000
|
$12.330
|
$12.000
|
$9.000
|
$7.850
|
$12.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
2,926.000
|
$33.000
|
$30.830
|
$30.000
|
$35.000
|
$32.000
|
$30.000
|
|
|
CONDT (RM) (3/4")
|
LF
|
960.000
|
$31.000
|
$18.500
|
$18.000
|
$16.000
|
$14.150
|
$18.000
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
5,265.000
|
$1.500
|
$1.030
|
$1.000
|
$2.000
|
$1.630
|
$1.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
705.000
|
$1.500
|
$1.440
|
$1.400
|
$2.000
|
$1.740
|
$1.400
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
59,355.000
|
$1.500
|
$1.440
|
$1.400
|
$2.000
|
$1.820
|
$1.400
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
126.000
|
$745.000
|
$1.950
|
$1.900
|
$2.000
|
$2.000
|
$1.900
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
252.000
|
$1,200.000
|
$2.210
|
$2.150
|
$2.500
|
$2.260
|
$2.150
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
52.000
|
$1,000.000
|
$1,027.780
|
$1,000.000
|
$1,100.000
|
$1,013.000
|
$1,000.000
|
|
|
GROUND BOX TY E (122317)W/APRON
|
EA
|
4.000
|
$1,400.000
|
$1,438.890
|
$1,400.000
|
$1,230.000
|
$1,129.000
|
$1,400.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
|
EA
|
21.000
|
$8,200.000
|
$4,650.000
|
$5,000.000
|
$7,100.000
|
$6,449.000
|
$5,000.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)TP(O)
|
EA
|
4.000
|
$5,500.000
|
$8,000.000
|
$4,200.000
|
$5,200.000
|
$4,738.000
|
$4,200.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)TP(O)
|
EA
|
1.000
|
$8,000.000
|
$8,000.000
|
$4,200.000
|
$5,100.000
|
$4,659.000
|
$4,200.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
4,855.000
|
$31.000
|
$25.690
|
$45.000
|
$28.000
|
$30.000
|
$25.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
45.000
|
$692.000
|
$725.000
|
$675.000
|
$760.000
|
$675.000
|
$675.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
23.000
|
$995.000
|
$775.000
|
$725.000
|
$900.000
|
$725.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
89.000
|
$806.000
|
$775.000
|
$775.000
|
$950.000
|
$775.000
|
$775.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
44.000
|
$930.000
|
$875.000
|
$850.000
|
$1,150.000
|
$850.000
|
$850.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
8.000
|
$2,250.000
|
$2,569.440
|
$2,500.000
|
$2,200.000
|
$5,000.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
15.000
|
$2,900.000
|
$6,680.550
|
$3,000.000
|
$3,900.000
|
$5,500.000
|
$3,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
173.000
|
$150.000
|
$75.000
|
$75.000
|
$100.000
|
$75.000
|
$75.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
25,451.400
|
$10.000
|
$6.170
|
$6.000
|
$6.000
|
$6.500
|
$6.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
1.000
|
$2,000.000
|
$59,199.930
|
$57,600.000
|
$65,000.000
|
$58,784.000
|
$57,600.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
64.000
|
$18.000
|
$28.360
|
$28.000
|
$33.000
|
$28.000
|
$28.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
55.000
|
$19.000
|
$28.360
|
$28.000
|
$33.000
|
$28.000
|
$28.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
1,759.000
|
$4.000
|
$5.000
|
$5.000
|
$6.000
|
$5.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
514,608.000
|
$0.500
|
$0.340
|
$0.340
|
$0.400
|
$0.340
|
$0.340
|
|
|
WK ZN PAV MRK REMOV (W)8"(DOT)
|
LF
|
340.000
|
$4.000
|
$3.000
|
$3.000
|
$3.500
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
36,527.000
|
$1.000
|
$0.480
|
$0.480
|
$0.600
|
$0.480
|
$0.480
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
998.000
|
$0.700
|
$8.000
|
$8.000
|
$9.000
|
$8.000
|
$8.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BKN W/MRKR)
|
LF
|
101,336.000
|
$5.000
|
$0.700
|
$0.700
|
$0.800
|
$0.700
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
13.000
|
$200.000
|
$125.000
|
$125.000
|
$137.000
|
$125.000
|
$125.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
9.000
|
$0.750
|
$175.000
|
$175.000
|
$192.000
|
$175.000
|
$175.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
512,814.000
|
$0.500
|
$0.340
|
$0.340
|
$0.400
|
$0.340
|
$0.340
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
12,160.000
|
$0.250
|
$0.780
|
$3.000
|
$1.800
|
$1.910
|
$1.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
22,707.000
|
$2.800
|
$1.200
|
$1.200
|
$1.300
|
$1.200
|
$1.200
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
3,239.000
|
$5.000
|
$6.000
|
$6.000
|
$7.000
|
$6.000
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
642.000
|
$11.000
|
$10.000
|
$10.000
|
$11.000
|
$10.000
|
$10.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(060MIL)
|
EA
|
12.000
|
$18.000
|
$250.000
|
$250.000
|
$280.000
|
$250.000
|
$250.000
|
|
REFL PAV MRK TY I(W)(U-LT ARW)(060 MIL)
|
EA
|
20.000
|
$19.000
|
$250.000
|
$250.000
|
$280.000
|
$250.000
|
$250.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
40,000.000
|
$0.500
|
$0.600
|
$0.600
|
$0.700
|
$0.600
|
$0.600
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
174,804.000
|
$0.750
|
$0.760
|
$0.760
|
$0.800
|
$0.760
|
$0.760
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
175,758.000
|
$0.750
|
$0.760
|
$0.760
|
$0.800
|
$0.760
|
$0.760
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
54.000
|
$4.000
|
$5.000
|
$5.000
|
$6.000
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,189.000
|
$3.000
|
$5.000
|
$5.000
|
$6.000
|
$5.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
111,537.000
|
$0.750
|
$0.450
|
$0.450
|
$0.500
|
$0.450
|
$0.450
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
122.000
|
$0.500
|
$0.700
|
$0.700
|
$0.800
|
$0.700
|
$0.700
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
56.000
|
$1.000
|
$10.000
|
$10.000
|
$11.000
|
$10.000
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
1.000
|
$3.250
|
$200.000
|
$200.000
|
$220.000
|
$200.000
|
$200.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$45.000
|
$200.000
|
$200.000
|
$220.000
|
$200.000
|
$200.000
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
250.000
|
$100.000
|
$181.410
|
$115.000
|
$163.000
|
$130.200
|
$110.000
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
196,401.000
|
$100.000
|
$115.000
|
$117.990
|
$125.000
|
$105.600
|
$110.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
6,945.000
|
$110.000
|
$155.590
|
$124.190
|
$135.000
|
$120.000
|
$125.000
|
|
|
SP MIXES SP-D SAC-B PG76-22
|
TON
|
56,988.000
|
$120.000
|
$140.000
|
$120.410
|
$137.000
|
$115.200
|
$120.000
|
|
|
STONE-MTRX-ASPH SMA-F SAC-A PG76-22
|
TON
|
56,988.000
|
$145.000
|
$165.000
|
$146.940
|
$145.000
|
$144.000
|
$150.000
|
|
|
BONDING COURSE
|
GAL
|
428,998.000
|
$3.500
|
$5.000
|
$3.500
|
$5.000
|
$3.360
|
$3.500
|
|
|
INTRLCK ART CONC BLKS (4" MIN)
|
SF
|
22,900.000
|
$15.000
|
$8.540
|
$8.540
|
$17.000
|
$20.690
|
$11.190
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
89,549.000
|
$2.250
|
$1.280
|
$3.000
|
$2.000
|
$2.000
|
$1.680
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$20,000.000
|
$22,390.200
|
$21,500.000
|
$43,000.000
|
$40,587.000
|
$18,943.750
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
3.000
|
$1,500.000
|
$1,130.550
|
$1,100.000
|
$950.000
|
$871.000
|
$1,100.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
1.000
|
$15,000.000
|
$10,791.650
|
$10,500.000
|
$12,300.000
|
$11,653.000
|
$28,914.960
|
|
|
ITS POLE (50 FT)(110 MPH)(W/STIFF)
|
EA
|
3.000
|
$18,000.000
|
$20,041.640
|
$19,500.000
|
$18,200.000
|
$16,704.000
|
$19,500.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
3.000
|
$6,000.000
|
$6,783.330
|
$6,600.000
|
$8,000.000
|
$7,301.000
|
$6,600.000
|
|
|
TMA (STATIONARY)
|
DAY
|
881.000
|
$200.000
|
$68.510
|
$276.000
|
$190.000
|
$317.540
|
$192.490
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
715.000
|
$150.000
|
$355.760
|
$326.000
|
$630.000
|
$417.570
|
$584.360
|
|
|
INSTALL OF FIELD HARD ETHERNET SWITCH
|
EA
|
4.000
|
$400.000
|
$4,111.110
|
$4,000.000
|
$400.000
|
$372.000
|
$4,000.000
|
|
|
INSTALL OF CELLULAR MODEM
|
EA
|
4.000
|
$250.000
|
$4,111.110
|
$4,000.000
|
$1,000.000
|
$922.000
|
$4,000.000
|
|
|
LOOP INSTALLATION
|
LF
|
12.000
|
$2,000.000
|
$925.000
|
$900.000
|
$16.000
|
$73.240
|
$900.000
|
|
|
SENSOR INSTALLATION
|
EA
|
8.000
|
$1,500.000
|
$925.000
|
$900.000
|
$1,100.000
|
$1,000.000
|
$900.000
|
|
|
CALIBRATION
|
EA
|
1.000
|
$7,500.000
|
$5,138.880
|
$5,000.000
|
$15,000.000
|
$6,000.000
|
$5,000.000
|
|
Totals: |
$181,963,013.520
|
$190,998,296.027
|
$229,719,235.207
|
$235,230,487.560
|
$240,050,877.234
|
$246,771,391.010
|