KENDALL RM 473 (0142-09-047)

Items: 96

County: KENDALL
Length: N/A
Highway: RM 473
District: SAN ANTONIO
Control Number: 0142-09-047
DBE Goal: 0.0%
Project: SSW 142-9-47
Guaranty: N/A
Time: 283 WORKING DAYS
Engineer's Estimate: $7,160,914.83
Date: 07/10/2024 (1 year ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
ANDRES GONZALEZ
ROBERTO MADRIGAL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$7,160,914.83
$4,477,118.86
Over/Under Est: -37.48% -$2,683,795.97
Over/Under Est: -35.66% -$2,553,586.15
Amt Left: 2.91% $130,209.82
Over/Under Est: -24.6% -$1,761,469.83
Amt Left: 20.6% $922,326.14
Delta: -17.19% -$792,116.32
Over/Under Est: -18.57% -$1,329,724.72
Amt Left: 30.24% $1,354,071.25
Delta: -8.00% -$431,745.11
$5,928,107.45
Over/Under Est: -17.22% -$1,232,807.38
Amt Left: 32.41% $1,450,988.59
Delta: -1.66% -$96,917.34
$6,427,861.45
Over/Under Est: -10.24% -$733,053.38
Amt Left: 43.57% $1,950,742.59
Delta: -8.43% -$499,754.00
$6,634,821.25
Over/Under Est: -7.35% -$526,093.58
Amt Left: 48.19% $2,157,702.39
Delta: -3.22% -$206,959.80
Over/Under Est: 0.02% $1,572.52
Amt Left: 59.98% $2,685,368.49
Delta: -7.95% -$527,666.10
Subcontractor Percentage Amount
J. H. ODEN CONTRACTING COMPANY 7.40% $328,767.63
MPB, INC. 5.17% $229,693.06
TRP CONSTRUCTION GROUP, LLC 4.23% $187,930.69
MURRAY CONSTRUCTION 2.43% $107,960.18
EGGEMEYER LAND CLEARING, LLC 1.47% $65,309.25
DIIBS SPECIALISTS, LLC 1.26% $55,979.35
SOUTH TEXAS TRAFFIC ALLIANCE INC. 0.52% $23,102.59
LONE STAR EROSION CONTROL 0.38% $16,882.66
Total: 22.86% $1,015,625.41

Bid Items & Bid Tabulations

96 Total 0 of 96
KENDALL  |  RM 473  |  SAN ANTONIO  |  0142-09-047  |  07/10/2024  |  $7,160,914.83  |  SSW 142-9-47  |  WIDEN ROAD - ADD SHOULDERS  |  283 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACME BRIDGE COMPANY, INC.
J. CARROLL WEAVER, INC.
LCR TOTAL TRANSPORT LLC
DEAN WORD COMPANY, LTD.
ALLEN KELLER COMPANY
CK NEWBERRY, LLC
J3 COMPANY, LLC
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 378.000 $900.000 $1,030.000 $220.000 $858.000 $675.805 $500.000 $500.000 $700.000 $1,165.500
REMOVING CONC (RIPRAP)
SY 316.000 $17.830 $19.200 $16.020 $25.000 $24.236 $62.200 $50.000 $30.000 $36.300
REMOVING CONC (DRIVEWAYS)
SY 554.000 $15.330 $14.400 $16.020 $25.000 $21.058 $57.300 $50.000 $30.000 $36.300
REMOVING STAB BASE & ASPH PAV (0-6")
SY 679.000 $10.950 $14.700 $8.450 $6.000 $11.513 $14.100 $25.000 $20.000 $7.000
REMOVING STAB BASE AND ASPH PAV (10")
SY 11,538.000 $13.850 $10.500 $14.700 $14.000 $4.740 $4.550 $30.000 $15.500 $16.400
EXCAVATION (ROADWAY)
CY 11,822.000 $24.880 $10.300 $28.120 $41.000 $24.506 $20.050 $30.000 $75.000 $87.500
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 2,622.000 $40.000 $11.300 $23.560 $28.000 $31.653 $19.200 $35.000 $20.000 $115.500
FURNISHING AND PLACING TOPSOIL (4")
SY 78,835.000 $4.970 $0.920 $1.830 $1.600 $1.252 $4.450 $2.000 $8.000 $3.380
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 78,835.000 $0.630 $0.290 $0.330 $0.200 $0.291 $0.300 $0.300 $0.200 $0.280
BROADCAST SEED (TEMP) (WARM)
SY 39,418.000 $0.200 $0.160 $0.110 $0.200 $0.198 $0.200 $0.200 $0.150 $0.190
BROADCAST SEED (TEMP) (COOL)
SY 39,418.000 $0.200 $0.160 $0.110 $0.200 $0.198 $0.200 $0.200 $0.150 $0.190
VEGETATIVE WATERING
MG 1,230.000 $143.830 $31.500 $30.800 $57.000 $27.553 $16.500 $25.000 $60.000 $28.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 78,835.000 $3.030 $0.950 $1.820 $1.000 $1.716 $1.650 $2.000 $1.200 $1.650
PROOF ROLLING
HR 105.000 $67.500 $39.200 $71.500 $122.000 $98.440 $150.500 $100.000 $95.000 $156.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 8,987.000 $80.100 $97.000 $74.930 $98.000 $222.867 $132.250 $140.000 $108.000 $134.640
PRIME COAT(MC-30 OR AE-P)
GAL 5,802.000 $10.000 $7.300 $6.350 $5.750 $5.115 $9.050 $7.000 $5.000 $12.500
AGGR(TY-PD GR-4 SAC-B)
CY 985.000 $264.320 $148.000 $121.580 $150.000 $115.774 $222.250 $140.000 $250.000 $174.210
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 310.000 $311.500 $347.000 $260.780 $150.000 $175.705 $449.500 $300.000 $400.000 $238.700
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 46,646.000 $4.740 $6.000 $4.040 $5.100 $4.729 $5.700 $5.000 $6.000 $6.800
STRUCT EXCAV (PIPE)
CY 50.000 $34.880 $32.900 $7.820 $22.500 $36.400 $100.500 $100.000 $55.000 $72.590
CUT & RESTORING PAV
SY 45.000 $254.340 $94.900 $159.500 $33.000 $117.700 $100.500 $125.000 $200.000 $186.220
FLOWABLE BACKFILL
CY 16.000 $433.330 $339.000 $330.000 $205.000 $260.000 $276.500 $300.000 $300.000 $262.340
TRENCH EXCAVATION PROTECTION
LF 64.000 $25.000 $13.300 $60.500 $35.000 $26.000 $42.700 $50.000 $5.000 $134.520
TEMPORARY SPL SHORING
SF 628.000 $47.060 $20.000 $82.500 $46.000 $26.750 $100.500 $100.000 $35.000 $33.240
RIPRAP (CONC)(4 IN)
CY 4.000 $435.830 $1,110.000 $1,320.000 $1,355.000 $728.000 $1,130.000 $1,200.000 $1,000.000 $791.420
RIPRAP (MOW STRIP)(4 IN)
CY 113.000 $435.830 $837.000 $880.000 $790.000 $583.150 $754.000 $850.000 $1,000.000 $679.210
CMP (GAL STL 24 IN)
LF 17.000 $94.260 $185.000 $308.170 $138.000 $314.580 $175.750 $200.000 $225.000 $274.180
CMP AR (GAL STL DES 3)
LF 19.000 $166.430 $361.000 $321.610 $226.000 $474.010 $377.000 $425.000 $275.000 $346.860
RC PIPE (CL III)(24 IN)
LF 68.000 $146.560 $174.000 $163.640 $173.000 $212.930 $271.500 $300.000 $200.000 $186.620
HEADWALL (CH - FW - A - 0) (DES= 3)
EA 2.000 $6,502.180 $5,240.000 $10,450.000 $7,150.000 $5,189.500 $3,420.000 $4,000.000 $10,000.000 $6,959.140
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000 $6,502.180 $9,290.000 $6,050.000 $10,650.000 $7,039.950 $3,170.000 $3,500.000 $15,000.000 $8,534.220
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $3,143.300 $2,890.000 $3,850.000 $1,980.000 $3,531.000 $2,310.000 $3,000.000 $5,000.000 $4,248.420
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $3,096.900 $4,250.000 $4,950.000 $1,770.000 $3,600.550 $2,510.000 $3,000.000 $5,000.000 $4,976.840
SET (TY II) (DES 3) (CMP) (4: 1) (C)
EA 2.000 $1,900.000 $2,140.000 $3,850.000 $2,055.000 $2,284.450 $2,510.000 $3,000.000 $4,500.000 $3,182.270
REMOV STR (SET)
EA 3.000 $1,224.520 $344.000 $1,650.000 $1,029.000 $1,658.500 $276.500 $2,000.000 $1,000.000 $1,292.330
REMOV STR (PIPE)
LF 65.000 $116.600 $22.600 $49.500 $29.000 $21.400 $50.300 $100.000 $50.000 $59.650
MOBILIZATION
LS 1.000 $714,332.960 $450,000.000 $567,322.760 $449,000.000 $581,973.317 $445,000.000 $625,000.000 $625,000.000 $716,249.480
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $8,596.120 $8,700.000 $7,289.150 $3,200.000 $5,388.432 $17,960.000 $30,000.000 $12,000.000 $8,828.520
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 124.000 $44.000 $42.400 $44.550 $44.500 $42.120 $40.700 $50.000 $48.000 $40.500
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,228.000 $46.290 $50.900 $47.300 $53.500 $44.200 $42.700 $50.000 $43.000 $42.500
ROCK FILTER DAMS (REMOVE)
LF 1,352.000 $17.700 $21.200 $2.200 $22.250 $9.235 $8.900 $10.000 $23.000 $8.880
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $15.430 $42.400 $5.500 $44.500 $23.556 $22.750 $25.000 $28.000 $22.650
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $8.000 $21.200 $2.200 $22.250 $9.880 $9.550 $10.000 $15.000 $9.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 25,747.000 $5.000 $4.500 $4.400 $4.750 $3.380 $3.250 $4.000 $4.000 $3.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 25,747.000 $1.180 $0.900 $0.550 $1.000 $0.520 $0.500 $1.000 $1.500 $0.500
CONSTRUCTING DETOURS
SY 641.000 $126.430 $94.600 $241.190 $92.000 $84.851 $123.000 $150.000 $175.000 $101.200
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 260.000 $111.000 $179.000 $51.150 $120.000 $87.740 $291.500 $150.000 $75.000 $84.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 40.000 $54.530 $56.300 $168.040 $91.500 $30.763 $262.000 $250.000 $100.000 $117.050
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $56.120 $40.800 $168.040 $90.500 $30.495 $242.250 $150.000 $100.000 $110.010
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 60.000 $17.560 $76.700 $152.400 $12.500 $20.651 $201.250 $125.000 $50.000 $160.140
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 120.000 $28.650 $55.300 $50.200 $15.500 $20.651 $149.500 $75.000 $50.000 $85.610
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 40.000 $20.920 $49.300 $75.300 $24.000 $24.343 $273.500 $100.000 $75.000 $105.680
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $26.490 $49.300 $75.300 $18.000 $24.075 $112.000 $100.000 $75.000 $72.320
DRIVEWAYS (CONC)
SY 472.000 $91.890 $155.000 $178.840 $116.000 $261.947 $191.250 $150.000 $130.000 $141.520
DRIVEWAYS (SURF TREAT)
SY 3,329.000 $41.890 $57.000 $71.500 $44.000 $37.536 $85.600 $50.000 $60.000 $56.500
TURNOUTS (CONC)
SY 26.000 $208.500 $154.000 $220.000 $125.000 $320.797 $244.000 $400.000 $150.000 $130.200
TURNOUTS (SURF TREAT)
SY 457.000 $85.270 $56.600 $13.200 $50.250 $48.792 $95.500 $50.000 $60.000 $56.500
MTL W-BEAM GD FEN (TIM POST)
LF 1,200.000 $35.830 $23.900 $27.500 $25.000 $25.740 $25.400 $30.000 $30.000 $23.720
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 4.000 $1,167.330 $1,270.000 $1,485.000 $1,350.000 $1,404.000 $1,410.000 $1,500.000 $1,500.000 $1,264.980
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,783.330 $3,130.000 $3,850.000 $3,275.000 $3,551.600 $3,800.000 $3,500.000 $3,250.000 $3,109.750
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 27.000 $338.080 $382.000 $335.500 $340.000 $374.400 $306.500 $400.000 $400.000 $360.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 5.000 $741.900 $690.000 $665.500 $675.000 $676.000 $608.000 $750.000 $700.000 $650.000
ALUMINUM SIGNS (TY A)
SF 12.000 $52.740 $37.100 $26.400 $28.500 $36.400 $25.650 $40.000 $30.000 $35.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 40.000 $853.330 $743.000 $770.000 $750.000 $728.000 $678.000 $800.000 $675.000 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 9.000 $1,515.430 $796.000 $913.000 $925.000 $780.000 $834.000 $850.000 $830.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 42.000 $897.500 $849.000 $880.000 $875.000 $832.000 $789.000 $900.000 $785.000 $800.000
IN SM RD SN SUP&AM TYFRP(1)UA(P)
EA 2.000 $450.000 $743.000 $1,144.000 $1,160.000 $728.000 $1,050.000 $800.000 $1,040.000 $700.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 8.000 $1,075.830 $1,030.000 $990.000 $960.000 $1,014.000 $864.000 $1,200.000 $860.000 $975.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 3.000 $980.550 $1,460.000 $1,149.500 $1,160.000 $1,430.000 $1,050.000 $1,600.000 $1,045.000 $1,375.000
REMOVE SM RD SN SUP&AM
EA 104.000 $167.600 $106.000 $115.500 $120.000 $104.000 $105.500 $125.000 $125.000 $100.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 1.000 $124.710 $79.600 $93.500 $95.000 $78.000 $85.400 $100.000 $100.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $39.250 $34.000 $22.000 $27.000 $33.280 $19.600 $30.000 $25.000 $32.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 21.000 $101.390 $79.600 $80.300 $81.000 $78.000 $72.900 $85.000 $80.000 $75.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 75,852.000 $1.260 $0.400 $0.390 $0.400 $0.478 $1.050 $0.500 $0.500 $1.050
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 1,435.000 $13.330 $1.100 $1.050 $1.100 $0.499 $20.100 $0.550 $1.250 $20.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 572.000 $13.330 $9.700 $9.900 $9.500 $4.992 $38.200 $5.500 $10.000 $38.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,742.000 $1.250 $1.500 $1.100 $2.500 $1.605 $2.250 $1.250 $4.000 $1.630
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,014.000 $7.830 $1.500 $1.100 $2.500 $1.605 $2.250 $1.250 $4.000 $1.630
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 228.000 $1.970 $1.100 $1.050 $1.100 $2.382 $3.950 $3.000 $1.250 $3.950
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 1.000 $249.780 $227.000 $220.000 $225.000 $182.000 $452.000 $200.000 $300.000 $450.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 $266.270 $256.000 $247.500 $250.000 $192.400 $502.000 $225.000 $300.000 $500.000
PAVEMENT SEALER 6"
LF 140,206.000 $0.570 $0.280 $0.280 $0.300 $0.468 $0.350 $0.500 $0.350 $0.360
PAVEMENT SEALER 8"
LF 228.000 $0.870 $0.570 $0.550 $0.600 $0.614 $1.050 $0.750 $0.750 $1.050
PAVEMENT SEALER (ARROW)
EA 1.000 $120.170 $28.400 $27.500 $28.000 $104.000 $125.500 $125.000 $50.000 $125.000
PAVEMENT SEALER (WORD)
EA 1.000 $125.690 $34.100 $33.000 $33.500 $109.200 $150.750 $125.000 $50.000 $150.000
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 74,574.000 $2.020 $0.910 $0.880 $0.900 $1.768 $1.250 $2.000 $1.000 $1.250
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
LF 62,682.000 $2.380 $0.910 $0.880 $0.900 $1.768 $1.250 $2.000 $1.000 $1.250
REF PROF PAV MRK TY I(Y)6"(BRK)(090MIL)
LF 2,950.000 $1.570 $0.970 $0.940 $0.950 $1.820 $1.300 $2.000 $1.100 $1.280
REFL PAV MRKR TY I-C
EA 12.000 $6.580 $6.800 $6.600 $6.700 $4.420 $20.100 $5.000 $8.000 $20.000
REFL PAV MRKR TY II-A-A
EA 944.000 $7.570 $6.800 $6.600 $6.700 $4.160 $8.400 $5.500 $8.000 $8.350
ELIM EXT PAV MRK & MRKS (4")
LF 65,327.000 $0.880 $0.400 $0.830 $0.400 $0.364 $0.500 $0.500 $0.500 $0.500
DITCH CLEANING AND RESHAPING (FOOT)
LF 36,896.000 $37.500 $1.750 $3.180 $21.350 $4.794 $5.650 $3.000 $3.000 $10.500
PREFORMED CENTERLINE RUMBLE STRIP
LF 72.000 $8.740 $22.700 $22.000 $22.250 $104.000 $42.200 $50.000 $25.000 $208.670
TMA (STATIONARY)
DAY 13.000 $232.680 $248.000 $550.000 $250.000 $321.000 $1,010.000 $500.000 $1,000.000 $269.860
TMA (MOBILE OPERATION)
DAY 43.000 $401.830 $493.000 $110.000 $450.000 $592.780 $1,040.000 $500.000 $1,250.000 $347.120
DRIVEWAY ASSISTANCE DEVICE(DAD) SYSTEM
MO 14.500 $10,619.510 $10,400.000 $13,750.000 $8,815.000 $14,525.423 $16,530.000 $25,000.000 $20,000.000 $12,081.590
Totals: $7,160,914.835 $4,477,118.860 $4,607,328.680 $5,399,445.000 $5,831,190.248 $5,928,107.450 $6,427,861.450 $6,634,821.250 $7,162,487.355