|
|
|
BACKFILL (TY A)
|
STA
|
2,404.000
|
$95.000
|
$88.550
|
$100.000
|
$42.000
|
$154.200
|
$50.000
|
$295.000
|
|
|
|
COMPOST MANUF TOPSOIL
|
CY
|
537.000
|
$49.130
|
$40.890
|
$125.000
|
$45.000
|
$31.750
|
$53.000
|
$73.000
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
43,480.000
|
$0.140
|
$0.250
|
$0.200
|
$0.150
|
$0.150
|
$0.130
|
$0.190
|
|
|
|
VEGETATIVE WATERING
|
MG
|
678.000
|
$19.640
|
$50.000
|
$43.000
|
$25.000
|
$23.310
|
$29.000
|
$75.000
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
42,800.000
|
$0.960
|
$1.000
|
$1.150
|
$1.500
|
$0.900
|
$0.790
|
$1.000
|
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
2,875.000
|
$3.000
|
$3.500
|
$3.500
|
$2.500
|
$4.060
|
$4.000
|
$3.750
|
|
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
331,889.000
|
$1.500
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
AGGR (TY-PB GR-4)
|
CY
|
9,209.000
|
$45.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
4,607.000
|
$80.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
72,176.000
|
$80.050
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
|
TON
|
3,294.000
|
$90.000
|
$107.950
|
$90.000
|
$79.000
|
$84.570
|
$90.000
|
$140.000
|
|
|
|
SUPERPAVE MIXTURES SP-D PG70-22
|
TON
|
122,026.000
|
$68.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
326,640.000
|
$2.750
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
326,640.000
|
$2.750
|
$2.850
|
$3.000
|
$3.000
|
$2.890
|
$3.000
|
$3.000
|
|
|
|
TBPFC (ASPHALT)(PG 76-22)
|
TON
|
4,607.000
|
$80.000
|
$120.400
|
$117.500
|
$115.000
|
$110.450
|
$131.000
|
$165.000
|
|
|
|
TBPFC (ASPHALT)(PG 76-22)
|
TON
|
4,607.000
|
$80.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
TBPFC (AGGREGATE) (SAC-A)
|
TON
|
72,176.000
|
$80.000
|
$120.400
|
$117.500
|
$115.000
|
$110.450
|
$131.000
|
$165.000
|
|
|
|
TBPFC (AGGREGATE) (SAC-A)
|
TON
|
72,176.000
|
$80.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
5,000.000
|
$50.000
|
$52.500
|
$48.000
|
$45.000
|
$50.550
|
$46.000
|
$95.000
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
111,525.000
|
$1.200
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
49,738.000
|
$2.410
|
$2.750
|
$3.500
|
$1.500
|
$1.570
|
$2.000
|
$8.500
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
28,648.000
|
$1.200
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
28,648.000
|
$1.200
|
$1.690
|
$3.500
|
$1.000
|
$1.580
|
$1.300
|
$3.250
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
978,226.000
|
$1.200
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
HIR (SURFACE) (2")
|
SY
|
1,061,103.000
|
$7.500
|
$3.360
|
$4.200
|
$4.000
|
$4.320
|
$3.800
|
$4.000
|
|
|
|
HIR (SURFACE) (2")
|
SY
|
1,061,103.000
|
$7.500
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
HIR (RECYCLING AGENT)
|
GAL
|
265,277.000
|
$6.060
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
HIR (RECYCLING AGENT)
|
GAL
|
265,277.000
|
$6.060
|
$9.000
|
$5.800
|
$5.500
|
$5.510
|
$5.250
|
$5.500
|
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
20.000
|
$128.000
|
$150.000
|
$200.000
|
$200.000
|
$162.720
|
$250.000
|
$200.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
865.000
|
$430.000
|
$400.000
|
$500.000
|
$400.000
|
$500.000
|
$500.000
|
$450.000
|
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
644.000
|
$9.320
|
$25.000
|
$10.000
|
$12.000
|
$12.000
|
$14.000
|
$12.000
|
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
3,830.000
|
$9.320
|
$6.500
|
$10.000
|
$12.000
|
$12.000
|
$14.000
|
$12.000
|
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
888.000
|
$80.000
|
$96.200
|
$148.000
|
$100.000
|
$125.000
|
$147.000
|
$96.500
|
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
732.400
|
$340.000
|
$368.250
|
$400.000
|
$325.000
|
$324.000
|
$326.000
|
$324.000
|
|
|
|
JOINT SEALANT
|
LF
|
4,474.000
|
$6.650
|
$9.000
|
$7.500
|
$6.000
|
$6.000
|
$8.000
|
$6.000
|
|
|
|
REMOVE STR (RAIL)
|
LF
|
888.000
|
$30.000
|
$40.000
|
$15.000
|
$40.000
|
$15.000
|
$5.000
|
$40.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,162,950.000
|
$730,171.900
|
$680,000.000
|
$1,900,000.000
|
$2,070,210.750
|
$2,240,000.000
|
$2,001,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$8,500.000
|
$3,000.000
|
$6,500.000
|
$17,500.000
|
$2,821.900
|
$8,000.000
|
$73,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,265.000
|
$29.380
|
$30.000
|
$30.000
|
$20.000
|
$28.230
|
$17.000
|
$30.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,265.000
|
$7.700
|
$15.000
|
$8.400
|
$5.000
|
$9.780
|
$9.500
|
$15.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
21,416.000
|
$2.260
|
$2.100
|
$2.250
|
$2.000
|
$1.820
|
$1.700
|
$2.100
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
21,416.000
|
$0.650
|
$0.650
|
$0.550
|
$0.250
|
$0.330
|
$0.500
|
$0.650
|
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,560.000
|
$15.000
|
$18.000
|
$28.000
|
$19.000
|
$12.000
|
$50.000
|
$18.000
|
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,560.000
|
$5.000
|
$8.000
|
$8.500
|
$8.000
|
$12.000
|
$10.000
|
$8.000
|
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,560.000
|
$5.000
|
$10.000
|
$10.500
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
477,821.000
|
$0.230
|
$0.160
|
$0.150
|
$0.100
|
$0.110
|
$0.100
|
$0.090
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
14,182.500
|
$18.940
|
$19.500
|
$22.300
|
$20.000
|
$19.950
|
$19.950
|
$19.500
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
34.000
|
$1,800.000
|
$1,900.000
|
$1,800.000
|
$2,000.000
|
$2,140.000
|
$1,640.000
|
$1,900.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
23.000
|
$1,200.000
|
$925.000
|
$1,100.000
|
$950.000
|
$995.000
|
$995.000
|
$925.000
|
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
4.000
|
$870.000
|
$1,065.000
|
$1,100.000
|
$1,000.000
|
$755.000
|
$755.000
|
$1,065.000
|
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$1,035.000
|
$980.000
|
$1,100.000
|
$1,000.000
|
$1,045.000
|
$1,045.000
|
$980.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
12,948.000
|
$1.380
|
$1.000
|
$1.000
|
$1.000
|
$0.900
|
$0.900
|
$1.000
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
19.000
|
$216.520
|
$125.000
|
$150.000
|
$125.000
|
$135.000
|
$135.000
|
$125.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
54.000
|
$2,417.800
|
$2,630.000
|
$2,800.000
|
$2,800.000
|
$2,386.000
|
$2,386.000
|
$2,630.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
52.000
|
$238.440
|
$215.000
|
$235.000
|
$200.000
|
$110.000
|
$110.000
|
$215.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$7,000.000
|
$8,500.000
|
$14,000.000
|
$9,000.000
|
$12,100.000
|
$12,100.000
|
$8,500.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$900.000
|
$2,500.000
|
$900.000
|
$1,900.000
|
$1,900.000
|
$900.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$800.000
|
$500.000
|
$1,200.000
|
$500.000
|
$325.000
|
$325.000
|
$500.000
|
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
2,459.000
|
$25.000
|
$35.000
|
$23.200
|
$35.000
|
$21.650
|
$20.000
|
$40.000
|
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
2,298.000
|
$30.490
|
$42.000
|
$28.750
|
$35.000
|
$28.860
|
$42.000
|
$42.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$490.000
|
$465.000
|
$535.000
|
$500.000
|
$477.660
|
$435.000
|
$465.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$600.000
|
$557.000
|
$645.000
|
$600.000
|
$577.680
|
$495.000
|
$557.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
1.000
|
$490.000
|
$582.000
|
$580.000
|
$600.000
|
$486.690
|
$545.000
|
$582.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T-2EXT)
|
EA
|
1.000
|
$600.000
|
$722.000
|
$800.000
|
$700.000
|
$695.810
|
$650.000
|
$722.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$780.000
|
$822.000
|
$985.000
|
$800.000
|
$799.810
|
$745.000
|
$822.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
2.000
|
$1,200.000
|
$912.000
|
$1,000.000
|
$900.000
|
$857.770
|
$875.000
|
$912.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
4.000
|
$1,200.000
|
$1,660.000
|
$1,850.000
|
$1,700.000
|
$1,165.110
|
$1,170.000
|
$1,660.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
10.000
|
$1,700.000
|
$1,740.000
|
$1,620.000
|
$1,500.000
|
$1,786.650
|
$1,645.000
|
$1,740.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
|
EA
|
1.000
|
$1,700.000
|
$1,844.000
|
$1,660.000
|
$1,900.000
|
$1,770.020
|
$1,697.000
|
$1,844.000
|
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$1,760.000
|
$2,300.000
|
$2,000.000
|
$2,900.000
|
$1,860.450
|
$2,300.000
|
$2,300.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
15.000
|
$150.000
|
$100.000
|
$45.000
|
$100.000
|
$100.000
|
$90.000
|
$100.000
|
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
2.000
|
$350.000
|
$500.000
|
$335.000
|
$250.000
|
$314.370
|
$500.000
|
$500.000
|
|
|
|
REMOVE LRSA
|
EA
|
20.000
|
$600.000
|
$500.000
|
$500.000
|
$500.000
|
$515.360
|
$500.000
|
$500.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
196.000
|
$49.000
|
$42.000
|
$47.000
|
$40.000
|
$42.290
|
$72.000
|
$42.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
70.000
|
$20.000
|
$13.000
|
$14.500
|
$13.000
|
$10.500
|
$18.000
|
$13.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
60.000
|
$75.000
|
$42.000
|
$47.000
|
$45.000
|
$43.110
|
$72.000
|
$42.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
55.000
|
$20.000
|
$13.000
|
$14.500
|
$13.000
|
$10.500
|
$18.000
|
$13.000
|
|
|
|
INSTL OM ASSM (OM-1)(FLX)GND
|
EA
|
5.000
|
$70.000
|
$175.000
|
$195.000
|
$175.000
|
$125.000
|
$72.000
|
$175.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
9.000
|
$47.920
|
$44.000
|
$49.000
|
$45.000
|
$43.840
|
$55.000
|
$44.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
55.000
|
$85.000
|
$45.000
|
$50.000
|
$45.000
|
$45.330
|
$72.000
|
$45.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
16.000
|
$85.000
|
$130.000
|
$145.000
|
$130.000
|
$89.750
|
$72.000
|
$130.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
166.000
|
$30.000
|
$17.000
|
$19.000
|
$18.000
|
$14.000
|
$24.000
|
$17.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
95.000
|
$25.000
|
$17.000
|
$19.000
|
$18.000
|
$14.000
|
$24.000
|
$17.000
|
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
12.000
|
$1.000
|
$17.000
|
$19.000
|
$18.000
|
$14.450
|
$24.000
|
$17.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
110,091.000
|
$0.300
|
$0.250
|
$0.160
|
$0.150
|
$0.180
|
$0.160
|
$0.280
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
220,182.000
|
$0.300
|
$0.250
|
$0.140
|
$0.150
|
$0.150
|
$0.140
|
$0.260
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
220,182.000
|
$0.300
|
$0.250
|
$0.140
|
$0.150
|
$0.150
|
$0.140
|
$0.260
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
1,390.000
|
$0.850
|
$0.850
|
$2.200
|
$2.250
|
$2.440
|
$2.200
|
$4.000
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
5,400.000
|
$0.850
|
$0.850
|
$1.500
|
$1.500
|
$1.660
|
$1.500
|
$3.670
|
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
5,400.000
|
$0.850
|
$0.850
|
$1.500
|
$1.500
|
$1.660
|
$1.500
|
$3.670
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
9,828.000
|
$0.800
|
$1.000
|
$1.000
|
$0.500
|
$1.760
|
$0.600
|
$1.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
660.000
|
$1.000
|
$1.000
|
$1.000
|
$0.500
|
$1.760
|
$0.620
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
11.000
|
$175.000
|
$200.000
|
$160.000
|
$150.000
|
$177.090
|
$160.000
|
$200.000
|
|
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
7.000
|
$888.000
|
$400.000
|
$600.000
|
$600.000
|
$664.100
|
$600.000
|
$880.000
|
|
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
7.000
|
$888.000
|
$400.000
|
$600.000
|
$600.000
|
$664.100
|
$600.000
|
$880.000
|
|
|
|
PAVEMENT SEALER 4"
|
LF
|
700.000
|
$0.200
|
$0.150
|
$1.000
|
$1.000
|
$1.110
|
$1.000
|
$0.200
|
|
|
|
PAVEMENT SEALER 6"
|
LF
|
574,408.000
|
$0.220
|
$0.150
|
$0.270
|
$0.300
|
$0.300
|
$0.270
|
$0.180
|
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
5.000
|
$300.000
|
$200.000
|
$400.000
|
$400.000
|
$442.730
|
$400.000
|
$350.000
|
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
5.000
|
$300.000
|
$200.000
|
$400.000
|
$400.000
|
$442.730
|
$400.000
|
$350.000
|
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
9.000
|
$88.720
|
$100.000
|
$90.000
|
$95.000
|
$99.610
|
$90.000
|
$133.000
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
61,241.000
|
$0.600
|
$0.400
|
$0.560
|
$0.600
|
$0.620
|
$0.560
|
$0.550
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
262,338.000
|
$0.500
|
$0.400
|
$0.510
|
$0.550
|
$0.560
|
$0.510
|
$0.520
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
700.000
|
$0.300
|
$0.400
|
$1.200
|
$1.250
|
$1.330
|
$1.200
|
$0.400
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
250,829.000
|
$0.510
|
$0.400
|
$0.520
|
$0.550
|
$0.580
|
$0.520
|
$0.520
|
|
|
|
RE PM W/RET REQ TY II (W) 6" (BRK)
|
LF
|
6,241.000
|
$0.850
|
$0.150
|
$0.240
|
$0.250
|
$0.270
|
$0.240
|
$0.220
|
|
|
|
RE PM W/RET REQ TY II (W) 6" (SLD)
|
LF
|
25,538.000
|
$0.850
|
$0.150
|
$0.200
|
$0.200
|
$0.220
|
$0.200
|
$0.200
|
|
|
|
RE PM W/RET REQ TY II (Y) 6" (SLD)
|
LF
|
25,529.000
|
$0.850
|
$0.150
|
$0.200
|
$0.200
|
$0.220
|
$0.200
|
$0.200
|
|
|
|
PRE PM TY C(ACC PRK)(BL&WH)(W/BORDR)SM
|
EA
|
2.000
|
$360.000
|
$400.000
|
$318.610
|
$325.000
|
$352.650
|
$318.610
|
$410.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
24.000
|
$3.250
|
$3.000
|
$3.350
|
$3.500
|
$3.700
|
$3.350
|
$10.000
|
|
|
|
REFL PAV MRKR TY I-R
|
EA
|
56.000
|
$5.000
|
$10.000
|
$7.820
|
$8.000
|
$8.650
|
$7.820
|
$10.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
10.000
|
$4.000
|
$3.000
|
$3.380
|
$3.500
|
$3.740
|
$3.380
|
$10.000
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,485.000
|
$3.200
|
$5.000
|
$3.350
|
$3.500
|
$3.700
|
$3.350
|
$3.330
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
12,190.000
|
$2.000
|
$0.500
|
$1.250
|
$1.250
|
$1.380
|
$1.250
|
$4.150
|
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
7,162.000
|
$4.070
|
$3.000
|
$3.000
|
$2.750
|
$2.630
|
$3.000
|
$3.750
|
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
7,162.000
|
$4.070
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
391.000
|
$110.000
|
$69.000
|
$45.000
|
$65.000
|
$253.840
|
$50.000
|
$185.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$110.000
|
$15,000.000
|
$8,000.000
|
$10,000.000
|
$7,615.230
|
$14,600.000
|
$48,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
128.000
|
$200.000
|
$250.000
|
$175.000
|
$200.000
|
$152.300
|
$150.000
|
$250.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
401.000
|
$130.480
|
$250.000
|
$175.000
|
$450.000
|
$253.840
|
$400.000
|
$250.000
|
|
1
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
331,889.000
|
$1.500
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1
|
|
AGGR (TY-PB GR-4)
|
CY
|
9,220.000
|
$45.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1
|
|
PFC (ASPHALT) PG76-22
|
TON
|
4,607.000
|
$80.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
72,176.000
|
$80.050
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1
|
|
SUPERPAVE MIXTURES SP-D PG70-22
|
TON
|
122,026.000
|
$68.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
111,525.000
|
$1.200
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
978,226.000
|
$1.200
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
Totals: |
$72,602,966.360
|
$20,658,005.590
|
$20,795,223.630
|
$21,226,415.850
|
$21,476,698.975
|
$22,498,799.655
|
$27,738,320.610
|