KAUFMAN FM 148 (0751-03-043)

Items: 111

County: KAUFMAN
Length: N/A
Highway: FM 148
District: DALLAS
Control Number: 0751-03-043
DBE Goal: 850.0%
Project: F 2024(168)
Guaranty: N/A
Time: 294 WORKING DAYS
Engineer's Estimate: $10,945,982.68
Date: 04/04/2024 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
LANE SELMAN
NICHOLAS WADLINGTON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$10,945,982.68
$9,345,341.95
Over/Under Est: -14.62% -$1,600,640.73
Over/Under Est: -8.87% -$971,033.91
Amt Left: 6.74% $629,606.82
$11,841,139.22
Over/Under Est: 8.18% $895,156.54
Amt Left: 26.71% $2,495,797.27
Delta: -18.71% -$1,866,190.45
Over/Under Est: 11% $1,203,645.07
Amt Left: 30.01% $2,804,285.80
Delta: -2.61% -$308,488.53
$12,345,383.75
Over/Under Est: 12.78% $1,399,401.07
Amt Left: 32.1% $3,000,041.80
Delta: -1.61% -$195,756.00
Subcontractor Percentage Amount
TEXANA LAND & ASPHALT, INC. 28.43% $2,630,596.71
JM YANEZ CONSTRUCTION, INC. 6.58% $608,840.18
NEED GRASS NOW LLC 3.13% $289,615.47
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 1.96% $181,356.65
STRIPING TECHNOLOGY, L.P. 1.28% $118,437.00
COLD CREEK CONSTRUCTION, LTD 1.18% $109,184.11
SOUTHWEST ENVIRONMENT SERVICES LLC 0.74% $68,471.39
AWP SAFETY 0.70% $64,770.23
A. L. HELMCAMP, INC. 0.35% $32,385.12
FLEX SUPPLY, LLC 0.33% $30,534.54
DUSTROL, INC. 0.14% $12,954.05
PROFESSIONAL TRAFFIC CONTROL LLC 0.13% $12,028.76
SERNA CONTRACTORS, LLC 0.04% $3,701.16
CARTHAGE DRILLING, LLC 0.01% $925.29
Total: 45.00% $4,163,800.66

Bid Items & Bid Tabulations

111 Total 0 of 111
KAUFMAN  |  FM 148  |  DALLAS  |  0751-03-043  |  04/04/2024  |  $10,945,982.68  |  F 2024(168)  |  REHAB EXIST ROADWAY  |  294 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BAKER & COMPANY CONSTRUCTION, LLC
A. K. GILLIS & SONS, LLC
A. L. HELMCAMP, INC.
ED BELL CONSTRUCTION COMPANY
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 250.640 $1,500.000 $642.000 $699.000 $500.000 $1,500.000 $4,000.000
REMOVING CONC (DRIVEWAYS)
SY 51.000 $45.000 $18.300 $15.000 $20.000 $31.500 $50.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 6,221.000 $15.000 $6.000 $17.500 $20.000 $8.400 $20.000
REMOVE TRT BASE & ASPH PAV (12"-20")
SY 14,956.000 $20.450 $11.750 $23.000 $15.000 $15.750 $20.000
EXCAVATION (ROADWAY)
CY 936.300 $21.670 $26.750 $14.970 $30.000 $52.500 $20.000
SUBGRADE WIDENING (ORD COMP)
STA 188.330 $487.500 $189.000 $243.400 $500.000 $997.500 $450.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 5,376.750 $55.000 $29.000 $15.640 $75.000 $43.000 $30.000
BACKFILL (TY A OR B)
STA 249.420 $269.000 $303.000 $405.770 $200.000 $315.000 $450.000
ROAD GRADER WORK (ORD COMP)
STA 249.420 $250.000 $192.000 $245.050 $250.000 $525.000 $450.000
COMPOST MANUF TOPSOIL (4")
SY 144,802.000 $4.500 $1.650 $1.500 $1.500 $1.000 $3.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 144,802.000 $0.360 $0.300 $0.150 $0.140 $0.150 $0.500
DRILL SEED (TEMP)(WARM OR COOL)
SY 144,802.000 $1.000 $0.300 $0.150 $0.120 $0.130 $0.500
VEGETATIVE WATERING
MG 43,085.000 $1.500 $1.000 $0.950 $1.000 $1.050 $2.000
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 18,691.000 $14.000 $16.750 $14.200 $22.000 $20.000 $20.000
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 76,039.000 $29.000 $28.600 $28.450 $35.000 $33.000 $29.000
REWRKING BS MATL (TY C)(10")(ORD COMP)
SY 50,220.000 $3.160 $4.000 $3.110 $4.000 $3.000 $6.000
CEMENT
TON 479.000 $295.000 $303.000 $275.000 $310.000 $275.000 $325.000
CEMENT TREAT (EXIST MATL) (6")
SY 62,775.000 $5.000 $2.650 $3.250 $4.000 $3.000 $6.000
CEMENT TREAT (NEW BASE) (6")
SY 18,691.000 $5.000 $5.600 $3.270 $6.000 $3.000 $6.000
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 15,213.000 $5.000 $9.500 $4.550 $7.000 $10.500 $6.000
ASPH (CRS-2P)
GAL 37,548.000 $5.000 $7.950 $4.820 $6.000 $5.250 $6.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 15,972.000 $5.000 $7.750 $5.240 $6.000 $6.300 $6.000
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
CY 356.000 $265.000 $178.000 $160.190 $500.000 $288.200 $300.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 727.000 $265.000 $189.000 $169.550 $300.000 $310.200 $300.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 197.000 $85.000 $109.000 $195.000 $400.000 $189.000 $85.000
PLANE ASPH CONC PAV (2")
SY 1,958.000 $3.500 $7.000 $7.130 $10.000 $6.300 $20.000
CUT & RESTORE ASPH PAVING
SY 72.000 $210.000 $195.000 $100.000 $110.000 $315.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 128.000 $15.000 $49.000 $15.000 $16.500 $52.500 $10.000
TEMPORARY SPL SHORING
SF 4,754.000 $45.000 $52.400 $25.000 $55.000 $73.500 $55.000
RIPRAP (CONC)(5 IN)
CY 29.600 $650.000 $963.000 $650.000 $715.000 $1,365.000 $650.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 367.000 $200.000 $140.000 $310.400 $275.000 $525.000 $250.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 19.000 $800.000 $495.000 $800.000 $880.000 $760.000 $1,000.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 14.000 $800.000 $605.000 $850.000 $935.000 $900.000 $1,000.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 16.000 $900.000 $688.000 $900.000 $990.000 $1,025.000 $1,000.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 18.000 $900.000 $770.000 $950.000 $1,045.000 $1,105.000 $1,250.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 14.000 $1,000.000 $798.000 $850.000 $935.000 $1,175.000 $1,500.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 40.000 $1,000.000 $825.000 $950.000 $1,045.000 $1,225.000 $1,600.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 30.000 $1,250.000 $880.000 $1,000.000 $1,100.000 $1,275.000 $1,700.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 45.000 $1,500.000 $935.000 $1,100.000 $1,210.000 $1,375.000 $1,800.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 28.000 $1,500.000 $990.000 $1,200.000 $1,320.000 $1,525.000 $1,900.000
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 14.000 $1,250.000 $798.000 $900.000 $990.000 $1,475.000 $1,500.000
RC PIPE (CL III)(18 IN)
LF 1,466.000 $110.000 $61.000 $60.000 $66.000 $80.000 $85.000
RC PIPE (CL III)(24 IN)
LF 308.000 $133.000 $92.000 $95.000 $105.000 $100.000 $125.000
RC PIPE (CL III)(36 IN)
LF 38.000 $175.000 $262.000 $245.000 $270.000 $150.000 $165.000
RC PIPE (CL IV)(24 IN)
LF 116.000 $150.000 $134.000 $130.000 $145.000 $280.000 $160.000
RC PIPE (CL IV)(30 IN)
LF 98.000 $190.000 $158.000 $185.000 $204.000 $300.000 $185.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $5,500.000 $6,325.000 $6,500.000 $7,150.000 $6,300.000 $3,500.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $6,500.000 $7,975.000 $8,000.000 $8,800.000 $8,400.000 $4,500.000
WINGWALL (PW - 2) (HW=3 FT)
EA 2.000 $9,000.000 $10,450.000 $10,000.000 $11,000.000 $7,350.000 $8,500.000
WINGWALL (PW - 2) (HW=4 FT)
EA 4.000 $10,000.000 $13,365.000 $13,000.000 $14,300.000 $9,450.000 $12,500.000
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000 $12,000.000 $16,775.000 $19,000.000 $20,900.000 $14,700.000 $15,000.000
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000 $14,000.000 $18,535.000 $25,000.000 $27,500.000 $23,100.000 $22,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $16,000.000 $19,525.000 $30,000.000 $33,000.000 $34,650.000 $30,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 2.000 $10,000.000 $11,070.000 $9,500.000 $10,450.000 $13,650.000 $12,500.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $12,000.000 $11,920.000 $10,000.000 $11,000.000 $14,700.000 $14,500.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $14,000.000 $14,460.000 $10,000.000 $11,000.000 $9,450.000 $17,500.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $16,000.000 $14,735.000 $10,500.000 $11,550.000 $10,500.000 $18,500.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $18,000.000 $17,060.000 $12,000.000 $13,200.000 $16,800.000 $19,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 117.000 $1,000.000 $915.000 $900.000 $990.000 $840.000 $1,250.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,500.000 $1,826.000 $1,200.000 $1,320.000 $945.000 $2,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 28.000 $1,500.000 $1,435.000 $1,400.000 $1,540.000 $1,050.000 $2,200.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $2,500.000 $2,755.000 $2,500.000 $2,750.000 $1,260.000 $3,650.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $3,200.000 $7,050.000 $7,500.000 $8,250.000 $3,150.000 $4,500.000
CLEAN EXIST CULVERTS
EA 12.000 $1,600.000 $2,060.000 $1,200.000 $1,320.000 $2,100.000 $1,500.000
REMOV STR (SET)
EA 72.000 $500.000 $515.000 $300.000 $330.000 $210.000 $500.000
REMOV STR (WINGWALL)
EA 22.000 $1,600.000 $2,190.000 $1,200.000 $1,320.000 $3,675.000 $1,000.000
REMOV STR (PIPE)
LF 175.800 $50.000 $47.000 $15.000 $16.500 $63.000 $50.000
REMOV STR (PIPE)
EA 60.000 $500.000 $412.000 $350.000 $385.000 $420.000 $500.000
MOBILIZATION
LS 1.000 $976,789.330 $480,000.000 $969,506.000 $975,000.000 $1,148,000.000 $1,200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $10,000.000 $14,370.000 $28,668.330 $35,000.000 $42,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 1,170.000 $65.000 $110.000 $75.000 $82.500 $105.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 1,170.000 $10.000 $11.000 $15.000 $14.000 $26.250 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 328.000 $30.000 $49.000 $40.000 $30.000 $36.750 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 328.000 $15.000 $17.000 $15.000 $5.000 $15.750 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,042.000 $3.000 $3.850 $4.500 $4.000 $3.150 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,042.000 $1.000 $1.650 $1.500 $1.000 $1.050 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,111.000 $6.000 $3.850 $5.000 $6.000 $5.250 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,111.000 $1.000 $1.650 $1.000 $1.250 $1.050 $9.000
DRIVEWAYS (ACP)
SY 5,791.000 $60.000 $44.000 $103.220 $80.000 $94.500 $40.000
DRIVEWAYS (CONC) (HES)
SY 52.000 $150.000 $204.000 $125.000 $140.000 $175.000 $150.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 49,535.000 $0.250 $0.250 $0.120 $0.250 $0.150 $0.500
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 25,062.000 $0.250 $0.250 $0.120 $0.300 $0.150 $0.500
REMOVE METAL BEAM GUARD FENCE
LF 375.000 $3.000 $2.300 $5.000 $20.000 $5.330 $3.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $216.000 $300.000 $500.000 $319.500 $1,500.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 40.000 $300.000 $325.000 $295.000 $308.000 $314.180 $850.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 6.000 $320.000 $370.000 $305.000 $330.000 $324.830 $850.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $725.000 $755.000 $695.000 $605.000 $740.180 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 52.000 $1,000.000 $720.000 $650.000 $687.500 $692.250 $1,150.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $1,000.000 $820.000 $725.000 $742.500 $772.130 $1,150.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $1,100.000 $1,030.000 $960.000 $935.000 $1,022.400 $1,150.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,250.000 $1,144.000 $835.000 $792.000 $889.280 $1,150.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 5.000 $1,500.000 $1,293.000 $1,250.000 $1,078.000 $1,331.250 $1,150.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 44.000 $70.000 $94.000 $55.000 $60.500 $58.580 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,133.000 $1.630 $1.650 $2.350 $0.820 $4.910 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 140.000 $10.350 $7.150 $12.650 $13.920 $13.470 $9.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 126,185.000 $0.330 $0.300 $0.230 $0.250 $0.240 $0.350
REFL PAV MRK TY II (Y) 6" (BRK)
LF 7,025.000 $0.330 $0.350 $0.250 $0.280 $0.270 $0.750
REFL PAV MRK TY II (Y) 6" (SLD)
LF 73,443.000 $0.330 $0.300 $0.230 $0.250 $0.240 $0.500
PAVEMENT SEALER 6"
LF 366.000 $2.000 $1.100 $0.500 $0.550 $0.530 $6.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 49,535.000 $1.040 $0.850 $0.660 $0.730 $0.700 $0.750
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 2,789.000 $1.000 $1.100 $0.670 $0.740 $0.710 $1.500
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 29,338.000 $1.040 $0.850 $0.660 $0.730 $0.700 $0.750
REFL PAV MRKR TY II-A-A
EA 562.000 $5.950 $4.950 $5.250 $5.780 $5.590 $6.000
PAV SURF PREP FOR MRK (6")
LF 366.000 $1.000 $1.100 $0.250 $0.280 $0.270 $6.000
FULL - WIDTH MOWING
CYC 3.000 $3,500.000 $5,500.000 $5,000.000 $6,500.000 $5,250.000 $5,000.000
SP MIXES SP-C SAC-B PG64-22
TON 8,588.000 $145.000 $153.000 $150.700 $170.000 $168.000 $155.000
TACK COAT
GAL 4,788.000 $4.450 $0.110 $3.750 $5.000 $4.200 $5.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 40,097.000 $2.650 $2.150 $1.800 $3.000 $2.500 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $15,000.000 $5,250.000 $17,500.000 $20,000.000 $15,750.000 $22,000.000
TMA (STATIONARY)
DAY 294.000 $300.000 $320.000 $150.000 $300.000 $157.500 $250.000
TMA (MOBILE OPERATION)
DAY 20.000 $500.000 $1,600.000 $150.000 $750.000 $1,050.000 $550.000
Totals: $10,945,982.676 $9,345,341.955 $9,974,948.777 $11,841,139.220 $12,149,627.755 $12,345,383.750