Show Job Controls
Bid Cobra

KARNES SH 80 (0348-04-055)

Items: 118

County: KARNES
Length: 0.9300 MILES
Highway: SH 80
District: CORPUS CHRISTI
Control Number: 0348-04-055
DBE Goal: 0.0%
Project: STP 2026(179)HES
Guaranty: $200,000.00
Time: 354 WORKING DAYS
Engineer's Estimate: $11,047,663.01
Date: 12/02/2025 (6 months ago)
Contract Number: 12253015
Type: BRIDGE REPLACEMENT
Project ID: A00176955
Contract Type: Federal
Project Description: RE-ALIGN INTERSECTION AND ADD LEFT TURN LANES
Mail/Deliver Bids To: N/A
NICK NOVOSAD
ROBERTO A JIMENEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$11,047,663.01
1
$11,964,432.59
Over/Under Est: 8.3% $916,769.58
$12,123,721.08
Over/Under Est: 9.74% $1,076,058.07
Amt Left: 1.33% $159,288.49
Over/Under Est: 23.07% $2,548,367.87
Amt Left: 13.64% $1,631,598.29
Delta: -12.14% -$1,472,309.80
Over/Under Est: 24.33% $2,687,372.19
Amt Left: 14.8% $1,770,602.61
Delta: -1.02% -$139,004.32
Over/Under Est: 50.94% $5,627,872.89
Amt Left: 39.38% $4,711,103.31
Delta: -21.41% -$2,940,500.70

Bid Items & Bid Tabulations

118 Total 0 of 118
KARNES  |  SH 80  |  CORPUS CHRISTI  |  0348-04-055  |  12/02/2025  |  $11,047,663.01  |  STP 2026(179)HES  |  BRIDGE REPL  |  354 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
HUNTER INDUSTRIES, LTD.
E-Z BEL CONSTRUCTION, LLC
R CONSTRUCTION CIVIL, LLC
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 47.000 $1,500.000 $3,500.000 $1,820.400 $6,000.000 $1,750.000 $35,000.000
REMOV CONC (MOWSTRIP)
CY 400.000 $94.000 $70.000 $22.960 $291.000 $40.000 $10.000
REMOVE STAB BASE AND ASPH PAV (6"-20")
SY 6,148.000 $8.000 $6.000 $5.460 $10.000 $7.000 $12.700
EXCAV (ROADWAY)
CY 15,530.840 $10.800 $15.000 $15.320 $15.750 $20.000 $23.200
EMBANK (FNL)(DC)(TY C)
CY 7,329.250 $18.000 $18.000 $15.320 $65.000 $22.000 $18.000
COMPOST MANUF TOPSOIL (4")
SY 28,615.000 $2.500 $0.860 $0.840 $1.000 $0.800 $0.790
DRILL SEED (PERM_RURAL_SAND)
AC 5.950 $2,000.000 $713.760 $687.280 $649.000 $650.000 $648.880
DRILL SEED (TEMP_WARM_COOL)
AC 5.950 $1,000.000 $594.280 $572.230 $540.000 $540.000 $540.270
VEGETATIVE WATERING
TGL 525.400 $22.000 $50.000 $22.960 $115.000 $48.000 $47.450
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
CY 8,718.000 $60.000 $73.000 $61.570 $75.000 $93.000 $92.000
LIME (COM OR QK)(SLURRY)
TON 130.000 $345.000 $340.000 $336.960 $498.000 $330.000 $312.000
LIME TRT (SUBGRADE) (11")
SY 10,461.000 $10.000 $2.000 $2.750 $4.000 $5.000 $3.700
CEMENT
TON 597.000 $212.000 $220.000 $199.800 $286.000 $195.000 $183.000
CEMENT TRT (SUBGRADE) (8")
SY 5,865.000 $8.130 $2.000 $2.200 $3.750 $6.400 $2.830
CEMENT TRT (NEW BASE)(9")
SY 8,414.000 $3.000 $5.000 $2.200 $6.000 $6.400 $6.600
PRIME COAT (MC-30)
GAL 4,322.000 $9.000 $4.770 $4.440 $5.000 $4.000 $7.500
AGGR (TY-PB, GR-4S OR 4)(SAC-B)
CY 290.000 $129.000 $254.400 $118.040 $240.000 $155.000 $150.470
ASPH (MULTI OPTION)
GAL 10,982.000 $4.000 $5.300 $2.930 $5.000 $4.000 $4.750
D-GR HMA TY-B SAC-B PG70-22
TON 4,958.000 $75.000 $103.880 $86.800 $98.000 $160.000 $159.000
D-GR HMA TY-D SAC-B PG70-22
TON 3,855.000 $112.000 $116.600 $92.200 $110.000 $160.000 $159.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 11.630 $130.000 $371.000 $137.020 $350.000 $160.000 $297.000
TACK COAT
GAL 2,462.000 $4.000 $3.710 $3.250 $4.000 $1.800 $5.500
PLANE ASPH CONC PAV(0" TO 1")
SY 6,576.000 $1.500 $3.180 $1.410 $3.000 $1.150 $1.820
PLANE ASPH CONC PAV(2")
SY 2,751.000 $1.250 $4.250 $3.020 $4.000 $2.750 $3.700
PLANE ASPH CONC PAV(5")
SY 2,615.000 $3.750 $6.360 $3.020 $6.000 $2.750 $4.950
STRUCT EXCAV (PIPE)
CY 167.000 $10.000 $25.000 $43.020 $21.000 $17.000 $36.600
CEM STABIL BKFL
CY 379.000 $225.000 $185.000 $246.220 $252.000 $135.000 $144.200
TRENCH EXCAVATION PROTECTION
LF 1,131.000 $3.940 $15.000 $11.720 $3.000 $5.000 $8.620
TEMPORARY SPL SHORING
SF 2,978.000 $35.000 $19.000 $22.870 $24.000 $53.000 $42.720
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 1.000 $28,000.000 $27,500.000 $46,697.710 $25,000.000 $38,000.000 $25,000.000
DRILL SHAFT (18 IN)
LF 150.000 $140.000 $125.000 $264.330 $271.000 $290.000 $127.700
DRILL SHAFT (36 IN)
LF 1,144.000 $280.000 $415.000 $432.360 $374.000 $500.000 $241.200
DRILL SHAFT (60 IN)
LF 795.000 $610.000 $890.000 $865.290 $890.000 $880.000 $698.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 90.000 $280.000 $397.750 $215.660 $270.000 $290.000 $231.340
CL C CONC (ABUT)
CY 85.400 $1,400.000 $1,507.800 $1,600.000 $1,400.000 $1,200.000 $1,058.000
CL C CONC (CAP)
CY 31.000 $1,671.000 $1,064.400 $1,500.000 $1,250.000 $2,000.000 $1,692.000
CL C CONC (CAP)(MASS)
CY 227.600 $1,000.000 $1,066.400 $1,150.000 $1,375.000 $1,800.000 $1,030.000
CL C CONC (COLUMN)
CY 22.100 $1,100.000 $1,120.000 $1,050.000 $1,550.000 $2,100.000 $1,517.900
CL C CONC (COLUMN)(MASS)
CY 248.300 $990.000 $1,022.000 $1,100.000 $1,200.000 $1,500.000 $1,416.000
REINF CONC SLAB
SF 36,633.000 $24.000 $24.780 $29.000 $26.000 $28.000 $26.000
APPROACH SLAB
CY 102.800 $770.000 $535.000 $700.000 $803.000 $1,300.000 $628.000
PRESTR CONC GIRDER (TX46)
LF 2,011.500 $248.000 $225.000 $190.000 $265.000 $275.000 $195.000
RIPRAP (CONC)(5 IN)
CY 23.000 $531.000 $575.000 $727.390 $739.000 $810.000 $656.800
RIPRAP (CONC)(CL B)
CY 3.150 $800.000 $800.000 $1,050.000 $966.000 $2,500.000 $971.000
RIPRAP (MOW STRIP)(4 IN)
CY 67.000 $495.000 $575.000 $705.000 $924.000 $615.000 $664.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,611.000 $200.000 $135.000 $200.000 $175.000 $230.000 $201.600
ELASTOMERIC BEARING (EE4)
EA 14.000 $2,600.000 $1,200.000 $5,705.220 $5,745.000 $1,025.000 $1,798.000
ELASTOMERIC BEARING (F7)
EA 7.000 $5,297.000 $1,200.000 $8,227.790 $3,830.000 $1,025.000 $3,936.000
STR STEEL (PLATE GIRDER)
LB 1,183,531.000 $2.220 $2.450 $2.740 $2.830 $2.850 $2.250
RAIL (TY SSTR)
LF 1,174.000 $70.000 $75.000 $70.190 $61.000 $100.000 $65.500
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 263.000 $242.000 $185.000 $292.320 $259.000 $165.000 $184.600
RC PIPE (CL III)(18 IN)
LF 330.000 $80.000 $68.000 $93.800 $106.000 $110.000 $81.200
RC PIPE (CL III)(30 IN)
LF 800.000 $124.000 $98.000 $134.840 $128.000 $135.000 $129.000
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 2.000 $6,700.000 $3,950.000 $8,676.350 $10,267.000 $6,300.000 $10,688.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $4,800.000 $4,865.000 $5,393.400 $6,677.000 $3,600.000 $6,183.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 2.000 $9,100.000 $6,375.000 $7,503.870 $8,827.000 $5,300.000 $10,204.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 1.000 $2,400.000 $1,900.000 $3,282.940 $3,000.000 $2,600.000 $2,952.000
PIPE (PVC) (SCH 80) (4 IN)
LF 282.000 $55.000 $10.000 $13.540 $123.000 $16.000 $34.500
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $325,000.000 $450,000.000 $485,942.430 $450,000.000 $400,000.000 $1,200,000.000
REMOV STR (PIPE)
EA 1.000 $500.000 $2,500.000 $2,931.200 $537.000 $1,200.000 $362.000
MOBILIZATION
LS 1.000 $1,093,619.802 $1,000,000.000 $912,868.250 $1,000,000.000 $900,000.000 $1,645,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $4,300.000 $4,000.000 $4,134.270 $1,002.000 $1,650.000 $68,180.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 24.000 $110.000 $300.000 $115.060 $1,034.000 $475.000 $500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
CY 9.000 $300.000 $142.470 $498.260 $470.000 $500.000 $470.420
ROCK FILTER DAMS (REMOVE)
CY 9.000 $1.250 $38.480 $137.180 $130.000 $140.000 $129.520
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $30.000 $12.670 $37.050 $35.000 $66.000 $34.980
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $14.000 $5.360 $12.200 $12.000 $14.000 $11.520
TEMP SEDMT CONT FENCE (INSTALL)
LF 60.000 $2.000 $1.670 $5.170 $5.000 $5.000 $4.880
TEMP SEDMT CONT FENCE (REMOVE)
LF 60.000 $1.250 $8.250 $1.610 $2.000 $1.600 $1.520
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 80.000 $10.000 $8.250 $7.940 $8.000 $8.000 $7.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 80.000 $3.000 $1.670 $1.610 $2.000 $1.550 $1.520
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,920.000 $15.000 $30.000 $50.000 $92.000 $72.000 $77.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,920.000 $8.500 $12.000 $13.000 $27.000 $3.300 $7.300
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,920.000 $6.000 $25.000 $20.000 $26.000 $5.500 $9.000
INTERSECTIONS (ACP)
SY 750.000 $68.500 $85.000 $54.520 $80.000 $22.000 $163.000
DRIVEWAYS (ACP)
SY 943.000 $31.000 $45.000 $41.400 $25.000 $31.000 $83.500
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 11,244.000 $0.200 $0.500 $0.620 $1.000 $0.500 $0.200
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 6,944.000 $0.240 $0.500 $0.450 $1.000 $0.500 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 725.000 $27.000 $25.850 $25.170 $25.000 $25.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,459.000 $2,029.500 $1,946.000 $1,964.000 $1,700.000 $2,300.000
REMOVE METAL BEAM GUARD FENCE
LF 930.000 $2.400 $11.000 $4.000 $4.000 $3.300 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,090.000 $3,245.000 $3,443.000 $3,443.000 $3,400.000 $3,050.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $750.000 $800.000 $925.000 $925.000 $2,400.000 $1,415.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $534.000 $600.000 $925.000 $925.000 $850.000 $1,188.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 2.000 $7,886.000 $8,350.000 $8,250.000 $8,250.000 $6,600.000 $7,483.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 9.000 $6,000.000 $12,060.000 $5,585.650 $6,900.000 $6,750.000 $5,549.420
CONDT (PVC) (SCH 40) (2")
LF 1,630.000 $10.000 $30.600 $7.550 $15.000 $14.000 $11.490
CONDT (PVC) (SCH 80) (2") (BORE)
LF 390.000 $25.000 $64.800 $30.190 $28.000 $20.000 $17.460
ELEC CONDR (NO.12) INSULATED
LF 6,260.000 $1.500 $3.330 $0.860 $1.000 $1.000 $0.900
GROUND BOX TY A (122311)W/APRON
EA 4.000 $1,500.000 $280.000 $916.560 $1,150.000 $1,400.000 $1,189.630
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 1.000 $10,000.000 $22,770.000 $7,332.510 $13,500.000 $10,500.000 $9,149.030
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 18.000 $1,300.000 $880.000 $800.000 $775.000 $850.000 $784.450
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 5.000 $879.000 $990.000 $900.000 $1,050.000 $1,100.000 $960.740
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 11.000 $1,098.000 $1,100.000 $1,000.000 $1,200.000 $1,300.000 $801.230
REMOVE SM RD SN SUP&AM
EA 25.000 $125.000 $110.000 $100.000 $75.000 $80.000 $109.590
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 24,088.000 $0.630 $0.350 $0.320 $0.320 $0.350 $0.320
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 34,028.000 $0.500 $0.350 $0.320 $0.320 $0.350 $0.320
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,300.000 $1.300 $3.000 $1.530 $2.750 $1.500 $2.370
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 583.000 $1.240 $3.000 $1.530 $2.750 $1.750 $1.850
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 666.000 $1.750 $1.210 $1.100 $1.000 $1.150 $1.100
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 318.000 $1.100 $1.210 $1.100 $1.000 $1.150 $1.100
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,105.000 $1.250 $1.210 $1.100 $1.000 $1.150 $1.100
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 600.000 $3.000 $2.200 $2.000 $2.000 $2.000 $2.000
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 440.000 $0.500 $1.210 $1.100 $1.000 $1.150 $1.100
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 17,171.000 $0.500 $1.070 $0.880 $1.000 $1.000 $0.980
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 19,418.000 $0.750 $1.070 $0.880 $1.000 $1.000 $0.980
PRFB RUMBLE STRIP (BLK)(4')(TRANSVERSE)
LF 40.000 $20.000 $10.000 $16.000 $16.000 $25.000 $21.270
PREFAB PM TY C (W)(24")(SLD)
LF 44.000 $16.000 $17.600 $16.000 $16.000 $17.000 $16.000
PREFAB PM TY C (W)(ARROW)
EA 6.000 $210.000 $220.000 $200.000 $200.000 $215.000 $200.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 2.000 $400.000 $550.000 $500.000 $500.000 $525.000 $500.000
PREFAB PM TY C (W)(WORD)
EA 6.000 $253.000 $330.000 $300.000 $300.000 $325.000 $300.000
PREFAB PM TY C (Y)(24")(SLD)
LF 475.000 $16.000 $19.800 $18.000 $18.000 $19.000 $18.000
REFL PAV MRKR TY I-C
EA 211.000 $5.000 $8.250 $7.500 $8.000 $8.000 $7.500
REFL PAV MRKR TY II-A-A
EA 972.000 $8.250 $8.250 $7.500 $8.000 $8.000 $7.500
TRAFFIC BUTTON TY Y
EA 222.000 $3.000 $6.000 $7.500 $8.000 $20.000 $4.060
ELIM EXT PM & MRKS (4")
LF 22,161.000 $0.500 $0.330 $0.300 $0.300 $0.350 $0.300
ELIM EXT PM & MRKS (RUMBLE STRIP)
LF 11,082.000 $5.000 $0.490 $0.450 $0.450 $0.450 $0.450
TIP TESTING(DRILL SHAFT)
EA 3.000 $4,250.000 $5,500.000 $11,501.700 $5,000.000 $5,000.000 $5,000.000
Totals: $11,047,663.004 $11,964,432.588 $12,123,721.080 $13,596,030.880 $13,735,035.200 $16,675,535.890