Show Job Controls
Bid Cobra

JOHNSON US 287 (0172-10-015)

Items: 38

County: JOHNSON
Length: N/A
Highway: US 287
District: FORT WORTH
Control Number: 0172-10-015
DBE Goal: N/A
Project: C 172-10-15
Guaranty: N/A
Time: 28 WORKING DAYS
Engineer's Estimate: $808,266.44
Date: 02/05/2019 (7 years ago)
Contract Number: N/A
Type: GR, BS, DR, PAV
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$808,266.44
Over/Under Est: -12.17% -$98,329.15
Over/Under Est: -4.35% -$35,129.50
Amt Left: 8.9% $63,199.65
Over/Under Est: -3.92% -$31,720.39
Amt Left: 9.38% $66,608.76
Delta: -0.44% -$3,409.11
Over/Under Est: 14.5% $117,171.93
Amt Left: 30.35% $215,501.08
Delta: -19.17% -$148,892.32
Over/Under Est: 21.23% $171,597.94
Amt Left: 38.02% $269,927.09
Delta: -5.88% -$54,426.01
$1,198,491.00
Over/Under Est: 48.28% $390,224.56
Amt Left: 68.82% $488,553.71
Delta: -22.31% -$218,626.62

Bid Items & Bid Tabulations

38 Total 0 of 38
JOHNSON  |  US 287  |  FORT WORTH  |  0172-10-015  |  02/05/2019  |  $808,266.44  |  C 172-10-15  |  GR, BS, DR, PAV  |  28 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
PEACHTREE CONSTRUCTION, LTD.
FOUTSCO PAVING COMPANY, LLC
TEXAS MATERIALS GROUP, INC.
BICK'S CONSTRUCTION, INC.
FNH CONSTRUCTION, LLC
BACKFILL (TY B)
STA 132.000 $180.000 $242.000 $165.000 $50.000 $300.000 $36.360 $550.000
PRIME COAT (EC-30)
GAL 13,146.000 $4.500 $0.100 $2.000 $0.050 $3.850 $3.560 $10.000
SUPERPAVE MIXTURES SP-D SAC-B PG70-28
TON 3,810.000 $90.000 $94.000 $101.000 $125.000 $100.000 $138.640 $110.000
PLANE ASPH CONC PAV(0" TO 2")
SY 65,730.000 $2.000 $1.430 $1.800 $1.000 $1.950 $1.850 $4.000
FULL - DEPTH REPAIR CRCP (8")
SY 200.000 $175.000 $230.000 $315.000 $280.000 $300.000 $389.080 $85.000
MOBILIZATION
LS 1.000 $70,000.000 $70,600.000 $35,000.000 $45,000.000 $92,500.000 $87,286.000 $110,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $11,000.000 $7,500.000 $3,000.000 $7,000.000 $20,220.000 $1,434.000 $8,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 500.000 $2.320 $2.350 $3.000 $2.000 $3.000 $1.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 500.000 $0.640 $0.650 $1.500 $1.000 $1.000 $1.500 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 500.000 $4.520 $6.000 $6.000 $2.000 $5.000 $1.500 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000 $0.860 $1.250 $2.000 $1.000 $1.000 $1.500 $9.000
RUMBLE STRIPS (SHOULDER)
LF 11,166.000 $0.500 $0.300 $0.520 $1.100 $0.350 $1.460 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $25.000 $34.000 $34.000 $24.000 $35.000 $33.500 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $1,850.000 $2,250.000 $1,900.000 $1,900.000 $2,210.000 $1,850.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,050.000 $1,300.000 $1,300.000 $1,100.000 $1,350.000 $1,235.000 $1,850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,500.000 $1,250.000 $1,600.000 $1,100.000 $1,300.000 $1,559.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 241.000 $5.000 $5.000 $6.750 $3.000 $5.250 $6.500 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $350.000 $250.000 $205.000 $250.000 $255.000 $195.000 $800.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $350.000 $250.000 $130.000 $250.000 $255.000 $125.000 $800.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 557.250 $35.000 $20.000 $32.500 $35.000 $20.500 $32.000 $30.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 14.000 $25.000 $28.000 $50.000 $20.000 $28.500 $48.750 $30.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $900.000 $1,250.000 $1,850.000 $725.000 $1,300.000 $1,833.000 $650.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $27.000 $18.000 $13.500 $28.000 $18.500 $13.000 $100.000
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 4.000 $52.000 $95.000 $102.000 $82.000 $100.000 $99.500 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $40.000 $27.000 $29.000 $27.000 $28.000 $27.620 $100.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,579.000 $2.000 $1.000 $1.200 $1.000 $1.250 $1.000 $6.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 163.000 $8.000 $6.000 $9.500 $9.500 $7.450 $6.000 $20.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 6,853.000 $0.500 $0.350 $0.500 $0.600 $1.250 $0.350 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,022.000 $2.000 $1.070 $2.000 $0.800 $1.400 $1.500 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 350.000 $2.000 $1.050 $2.000 $0.800 $1.400 $1.500 $5.000
REFL PAV MRKR TY II-C-R
EA 223.000 $5.000 $4.000 $10.500 $10.000 $6.250 $4.000 $15.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 39.000 $200.000 $88.300 $110.000 $85.000 $100.000 $75.000 $150.000
MULTIPOLYMER PAV MRK (W)(4")(SLD)
LF 23,038.000 $0.600 $0.430 $0.550 $0.500 $0.900 $0.430 $0.500
MULTIPOLYMER PAV MRK (W)(4")(BRK)
LF 2,870.000 $0.610 $0.550 $0.550 $0.500 $0.900 $0.550 $0.500
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 1,579.000 $1.400 $1.500 $1.100 $1.000 $2.800 $1.500 $5.000
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 224.000 $6.500 $8.000 $11.000 $10.000 $12.450 $8.000 $20.000
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 28,843.000 $0.630 $0.430 $0.550 $0.500 $0.900 $0.430 $0.500
TMA (STATIONARY)
DAY 39.000 $300.000 $225.330 $200.000 $250.000 $275.000 $150.000 $550.000
Totals: $808,266.440 $709,937.290 $773,136.945 $776,546.050 $925,438.375 $979,864.380 $1,198,491.000