Show Job Controls
Bid Cobra

JIM WELLS SH 359 (0087-02-053)

Items: 90

County: JIM WELLS
Length: 0.0000 MILES
Highway: SH 359
District: CORPUS CHRISTI
Control Number: 0087-02-053
DBE Goal: 0.0%
Project: C 87-2-53
Guaranty: $100,000.00
Time: 358 WORKING DAYS
Engineer's Estimate: $17,836,722.70
Date: 11/05/2025 (7 months ago) Changed
Contract Number: 11253206
Type: WIDEN ROAD - ADD LANES
Project ID: A00119667
Project Description: REHABILITATE ROADWAY AND ADD PASSING LANES
Mail/Deliver Bids To: N/A
ERIC MARTINEZ
LUCIA ADAME
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$17,836,722.70
$14,897,451.96
Over/Under Est: -16.48% -$2,939,270.74
Over/Under Est: -12.29% -$2,192,464.26
Amt Left: 5.01% $746,806.48
Over/Under Est: -9.65% -$1,721,155.25
Amt Left: 8.18% $1,218,115.49
Delta: -3.01% -$471,309.01
$16,496,596.55
Over/Under Est: -7.51% -$1,340,126.15
Amt Left: 10.73% $1,599,144.59
Delta: -2.36% -$381,029.10
$17,433,209.58
Over/Under Est: -2.26% -$403,513.12
Amt Left: 17.02% $2,535,757.62
Delta: -5.68% -$936,613.03
$17,998,570.94
Over/Under Est: 0.91% $161,848.24
Amt Left: 20.82% $3,101,118.98
Delta: -3.24% -$565,361.36
Over/Under Est: 28.68% $5,115,703.74
Amt Left: 54.07% $8,054,974.48
Delta: -27.52% -$4,953,855.50
Subcontractor Percentage Amount
ANTS CONTRACTORS LLC 3.46% $517,138.59
HIGHWAY BARRICADES AND SERVICES, LLC 2.72% $406,536.69
MURRAY CONSTRUCTION 0.52% $77,720.25
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.25% $37,365.50
BEAVER BOYS SERVICES LLC 0.11% $16,440.82
Total: 7.06% $1,055,201.85

Bid Items & Bid Tabulations

90 Total 0 of 90
JIM WELLS  |  SH 359  |  CORPUS CHRISTI  |  0087-02-053  |  11/05/2025  |  $17,836,722.70  |  C 87-2-53  |  WIDEN ROAD - ADD LANES  |  358 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CK NEWBERRY, LLC
ANDERSON COLUMBIA CO., INC.
J E CONSTRUCTION SERVICES, LLC
HUNTER INDUSTRIES, LTD.
J. CARROLL WEAVER, INC.
BAY LTD.
GO UNDERGROUND, LIMITED LIABILITY COMPANY
REMOV CONC (DRIVEWAYS)
SY 87.000 $20.000 $20.000 $44.000 $9.000 $29.700 $29.530 $26.000 $12.000
EXCAV (ROADWAY)
CY 29,969.000 $8.000 $6.000 $8.000 $11.000 $12.100 $12.090 $4.800 $8.000
EMBANK (FNL)(DC)(TY C)
CY 31,531.000 $18.000 $7.000 $12.000 $6.000 $11.000 $6.910 $6.200 $8.490
COMPOST MANUF TOPSOIL (4")
SY 165,567.000 $2.240 $0.750 $1.400 $2.000 $0.990 $1.750 $2.100 $4.000
DRILL SEED (PERM_RURAL_SAND)
SY 165,567.000 $0.260 $0.100 $0.140 $0.250 $0.130 $0.140 $0.700 $1.000
VEGETATIVE WATERING
TGL 2,582.800 $22.500 $10.000 $24.000 $19.000 $23.100 $28.350 $5.700 $20.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 26,309.000 $60.000 $80.000 $77.000 $74.000 $97.080 $100.080 $110.000 $98.740
REWORK BS MTL (TY C)(12")(DENS CONT)
SY 160,164.000 $1.000 $0.750 $1.200 $0.250 $2.540 $0.460 $1.150 $5.000
CEMENT
TON 3,248.000 $220.000 $185.000 $220.000 $171.000 $204.600 $206.470 $210.000 $175.000
CEMENT TRT (EXIST MATL & NEW BASE)(12")
SY 160,164.000 $2.750 $1.250 $2.600 $2.000 $3.850 $2.940 $4.700 $2.000
PRIME COAT (RC-250)
GAL 39,522.000 $5.000 $3.250 $5.000 $3.000 $4.400 $5.060 $4.100 $10.000
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 75,285.000 $8.000 $2.750 $3.500 $3.000 $3.520 $4.860 $4.100 $10.000
AGGR (TY-PB, GR-4S OR 4)(SAC-B)
CY 1,976.000 $120.000 $120.000 $132.000 $97.000 $130.670 $195.040 $170.000 $122.170
AGGR (TY-PB, GR-5)(SAC-B)
CY 1,638.000 $180.000 $100.000 $172.000 $93.000 $130.640 $188.000 $160.000 $122.170
D-GR HMA TY-B SAC-B PG64-22
TON 35,239.000 $120.000 $105.000 $98.000 $115.000 $101.200 $116.550 $100.000 $159.600
D-GR HMA TY-D SAC-B PG70-22
TON 23,074.000 $110.000 $115.000 $116.000 $130.000 $108.900 $138.750 $120.000 $159.600
TACK COAT
GAL 16,784.000 $5.000 $4.000 $5.200 $4.000 $3.300 $4.440 $4.100 $12.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 16,852.000 $28.000 $25.000 $22.000 $20.000 $22.690 $26.090 $31.000 $105.000
PLANE ASPH CONC PAV(0" TO 2")
SY 49,556.000 $2.000 $1.250 $1.200 $2.000 $1.710 $2.220 $1.950 $6.000
CEM STABIL BKFL
CY 248.000 $200.000 $225.000 $220.000 $85.000 $205.210 $162.060 $68.000 $85.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 23.000 $700.000 $450.000 $520.000 $750.000 $648.020 $1,098.900 $940.000 $380.350
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 231.000 $1,000.000 $550.000 $710.000 $640.000 $729.020 $688.200 $860.000 $601.590
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 420.000 $1,100.000 $650.000 $770.000 $590.000 $810.030 $700.410 $870.000 $781.650
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 28.000 $1,000.000 $750.000 $850.000 $860.000 $831.630 $931.290 $930.000 $811.960
RC PIPE (CL III)(18 IN)
LF 452.000 $80.000 $90.000 $115.000 $91.000 $73.440 $92.130 $170.000 $90.960
RC PIPE (CL III)(24 IN)
LF 108.000 $350.000 $100.000 $160.000 $121.000 $97.200 $113.220 $180.000 $102.770
SET (TY I)(S= 3 FT)(HW= 3 FT)(6:1)(C)
EA 4.000 $20,000.000 $6,500.000 $5,000.000 $11,040.000 $5,940.190 $7,292.700 $9,000.000 $1,558.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1)(C)
EA 12.000 $8,000.000 $5,000.000 $8,500.000 $8,900.000 $5,400.170 $7,659.000 $10,800.000 $1,968.000
SET (TY I)(S= 4 FT)(HW= 6 FT)(4:1)(C)
EA 6.000 $14,000.000 $6,500.000 $8,000.000 $8,660.000 $8,100.250 $7,992.000 $12,200.000 $1,637.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1)(C)
EA 20.000 $23,000.000 $7,000.000 $9,500.000 $8,430.000 $7,560.240 $9,712.500 $15,100.000 $3,722.000
SET (TY I)(S= 6 FT)(HW= 6 FT)(6:1)(C)
EA 2.000 $10,200.000 $10,000.000 $10,000.000 $7,310.000 $12,960.410 $9,990.000 $10,900.000 $2,072.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 28.000 $2,000.000 $1,800.000 $1,500.000 $3,790.000 $1,944.060 $1,887.000 $2,300.000 $1,600.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $2,500.000 $2,800.000 $3,000.000 $4,640.000 $2,160.070 $2,775.000 $2,900.000 $1,491.000
CLEAN EXIST CULVERTS
EA 23.000 $1,250.000 $1,000.000 $2,700.000 $2,660.000 $2,160.070 $2,553.000 $1,800.000 $4,200.000
REMOV STR (SET)
EA 60.000 $1,200.000 $1,000.000 $1,400.000 $1,430.000 $648.020 $715.950 $830.000 $500.000
REMOV STR (PIPE)
LF 441.000 $50.000 $15.000 $30.000 $51.000 $21.600 $8.880 $22.000 $4.000
MOBILIZATION
LS 1.000 $1,722,301.000 $1,215,000.000 $910,000.000 $1,456,845.000 $1,259,719.460 $856,943.400 $1,291,600.000 $900,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $5,000.000 $8,000.000 $3,000.000 $5,430.000 $6,701.960 $6,105.000 $4,300.000 $4,200.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 175.000 $107.000 $60.000 $67.000 $65.000 $119.190 $111.000 $110.000 $160.000
ROCK FILTER DAMS (INSTALL) (TY 2)
CY 6.000 $400.000 $450.000 $450.000 $281.000 $420.400 $360.750 $560.000 $500.000
ROCK FILTER DAMS (REMOVE)
CY 6.000 $180.000 $150.000 $150.000 $90.000 $143.060 $55.500 $55.000 $1.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,120.000 $40.000 $15.000 $45.000 $49.000 $44.120 $16.650 $16.500 $28.000
CONSTRUCTION EXITS (REMOVE)
SY 1,120.000 $10.000 $5.000 $12.000 $13.000 $11.780 $11.100 $7.250 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,490.000 $5.500 $8.000 $8.000 $6.000 $7.350 $6.110 $7.400 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,490.000 $2.000 $2.000 $1.500 $2.000 $1.260 $2.220 $4.800 $1.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 900.000 $30.000 $35.000 $30.000 $76.000 $46.470 $22.860 $14.000 $80.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 5,400.000 $12.000 $15.000 $20.000 $7.000 $20.160 $17.370 $14.000 $10.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 900.000 $12.000 $30.000 $25.000 $11.000 $26.000 $22.860 $14.000 $7.000
INTERSECTIONS (ACP)
SY 3,211.000 $15.000 $50.000 $110.000 $71.000 $45.100 $64.380 $78.000 $148.510
DRIVEWAYS (CONC)
SY 87.000 $105.000 $215.000 $200.000 $103.000 $129.600 $172.050 $130.000 $90.000
DRIVEWAYS (ACP)
SY 5,071.000 $15.000 $50.000 $50.000 $59.000 $45.100 $32.190 $110.000 $85.710
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 65,018.000 $0.200 $0.100 $0.140 $0.250 $0.190 $0.120 $0.210 $0.220
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 54,908.000 $0.200 $0.120 $0.140 $0.250 $0.230 $0.170 $0.250 $0.240
REMOVE METAL BEAM GUARD FENCE
LF 310.000 $3.000 $6.000 $5.000 $2.000 $5.000 $5.550 $20.000 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $350.000 $900.000 $300.000 $195.000 $300.000 $555.000 $3,200.000 $300.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $350.000 $900.000 $300.000 $201.000 $300.000 $555.000 $3,200.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 24.000 $1,250.000 $450.000 $1,200.000 $1,590.000 $1,100.000 $2,572.310 $2,900.000 $4,600.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,000.000 $450.000 $1,000.000 $703.000 $875.000 $2,572.310 $2,900.000 $500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $8,900.000 $7,500.000 $9,000.000 $8,050.000 $8,350.000 $8,325.000 $5,800.000 $30,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $1,250.000 $1,000.000 $1,000.000 $905.000 $901.000 $1,054.500 $1,100.000 $1,800.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 57.000 $1,000.000 $750.000 $800.000 $640.000 $687.000 $821.400 $840.000 $1,800.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 5.000 $1,000.000 $825.000 $1,000.000 $650.000 $758.000 $999.000 $930.000 $1,800.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 31.000 $1,000.000 $850.000 $1,000.000 $790.000 $788.000 $1,037.850 $970.000 $1,800.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,200.000 $1,000.000 $1,200.000 $980.000 $964.000 $1,498.500 $1,200.000 $1,800.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 1.000 $1,500.000 $1,200.000 $1,500.000 $1,096.000 $1,128.000 $1,498.500 $1,400.000 $1,800.000
RELOCATE SM RD SN SUP&AM TY S80
EA 12.000 $750.000 $650.000 $650.000 $650.000 $601.000 $693.750 $740.000 $1,800.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 6,264.000 $2.000 $1.500 $1.500 $1.100 $1.500 $1.670 $1.750 $3.910
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 7,128.000 $6.000 $1.500 $1.500 $1.200 $1.500 $1.670 $1.750 $3.700
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 18,780.000 $4.000 $1.500 $1.400 $1.000 $1.300 $1.440 $1.500 $3.610
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 21,372.000 $4.000 $1.500 $1.400 $1.000 $1.300 $1.440 $1.500 $3.610
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 117,360.000 $1.000 $0.400 $0.340 $0.250 $0.320 $0.360 $0.370 $1.090
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 117,360.000 $0.500 $0.400 $0.340 $0.250 $0.320 $0.360 $0.370 $1.090
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 6,771.000 $0.600 $0.500 $2.000 $3.000 $1.630 $0.370 $1.700 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 6,876.000 $1.200 $0.500 $2.100 $3.000 $1.630 $0.370 $2.000 $1.000
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 836.000 $2.000 $2.000 $2.100 $1.500 $2.000 $2.220 $2.300 $0.690
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 700.000 $2.500 $2.000 $2.100 $1.500 $2.000 $2.220 $2.300 $0.890
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 887.000 $1.000 $2.000 $2.100 $1.500 $2.000 $2.220 $2.300 $0.880
TY I HIGH PERF PM (W)6"(BRK)(090MIL)
LF 5,009.000 $1.000 $2.000 $2.100 $1.500 $2.000 $2.220 $2.300 $0.900
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
LF 65,014.000 $2.000 $0.750 $0.740 $0.500 $0.720 $0.800 $0.850 $0.550
TY I HIGH PERF PM (Y)6"(BRK)(090MIL)
LF 82,044.000 $1.000 $0.750 $0.740 $0.500 $0.720 $0.800 $0.850 $0.540
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
LF 2,654.000 $1.000 $2.000 $2.100 $1.500 $2.000 $2.220 $2.300 $0.550
PREFAB PM TY C (W)(24")(SLD)
LF 857.000 $17.000 $18.000 $20.000 $14.000 $18.000 $19.980 $21.000 $11.000
PREFAB PM TY C (W)(ARROW)
EA 30.000 $200.000 $165.000 $150.000 $126.000 $150.000 $166.500 $170.000 $189.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 5.000 $450.000 $550.000 $550.000 $430.000 $500.000 $555.000 $580.000 $375.000
PREFAB PM TY C (W)(WORD)
EA 12.000 $275.000 $275.000 $280.000 $218.000 $250.000 $277.500 $290.000 $249.000
PREFAB PM TY C (Y)(12")(SLD)
LF 175.000 $7.000 $18.000 $20.000 $14.000 $18.000 $19.980 $21.000 $8.000
REFL PAV MRKR TY I-C
EA 58.000 $5.500 $15.000 $16.000 $13.000 $15.000 $16.650 $17.500 $4.000
REFL PAV MRKR TY II-A-A
EA 2,051.000 $6.000 $8.000 $8.000 $6.000 $7.500 $8.330 $8.700 $3.690
ELIM EXT PM & MRKS (4")
LF 65,568.000 $0.400 $0.500 $0.500 $0.500 $0.450 $0.500 $1.450 $0.500
TREE TRIMMING / BRUSH REMOVAL
MI 5.000 $10,900.000 $25,000.000 $5,000.000 $8,200.000 $11,000.000 $14,000.000 $5,800.000 $5,800.000
Totals: $17,836,722.700 $14,897,451.960 $15,644,258.440 $16,115,567.450 $16,496,596.550 $17,433,209.580 $17,998,570.940 $22,952,426.440