JEFFERSON FM 365 (0932-02-052)

Items: 73

County: JEFFERSON
Length: N/A
Highway: FM 365
District: BEAUMONT
Control Number: 0932-02-052
DBE Goal: N/A
Project: BR 2021(293)
Guaranty: N/A
Time: 195 WORKING DAYS
Engineer's Estimate: $1,576,883.52
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$1,576,883.52
Over/Under Est: 23.49% $370,428.56
Over/Under Est: 54.57% $860,540.14
Amt Left: 25.17% $490,111.58
Over/Under Est: 56.13% $885,063.64
Amt Left: 26.43% $514,635.08
Delta: -1.01% -$24,523.50
Subcontractor Percentage Amount
TRAFFIC SIGNS & LINES, LLC 6.60% $154,733.74
AVILES CONSTRUCTION SERVICE, INC 5.08% $119,098.09
HOLES-GOLDEN TRIANGLE LLC 2.24% $52,515.69
AMERICAN PARKING CONTROL 1.87% $43,841.23
FITTZ & SHIPMAN, INC. 1.28% $30,008.97
GMJ PAVING COMPANY LLC 0.94% $22,037.84
TNT CRANE & RIGGING, INC. 0.63% $14,770.04
HERMANOS STEEL, LLC 0.48% $11,253.36
HOUSTON SAWING & DRILLING 0.22% $5,157.79
SEMARCK LANDSCAPE SERVICES, INC. 0.22% $5,157.79
Total: 19.56% $458,574.54

Bid Items & Bid Tabulations

73 Total 0 of 73
JEFFERSON  |  FM 365  |  BEAUMONT  |  0932-02-052  |  02/04/2022  |  $1,576,883.52  |  BR 2021(293)  |  BRIDGE REPL  |  195 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
TEXAS MATERIALS GROUP, INC.
RAGLE CONSTRUCTION, INC.
REMOVING CONC (PAV)
SY 249.000 $5.000 $24.000 $38.000 $17.000
REMOVING CONCRETE(MOW STRIP)
LF 427.000 $4.800 $9.000 $9.900 $12.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 302.000 $4.100 $17.000 $25.260 $11.000
EXCAVATION (ROADWAY)
CY 158.000 $10.000 $35.000 $41.000 $150.000
EXCAVATION (CHANNEL)
CY 1,112.000 $12.330 $15.000 $22.000 $15.000
SUBGRADE WIDENING (DENS CONT)
STA 6.800 $306.800 $4,153.000 $2,840.000 $500.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,599.890 $13.380 $30.500 $34.000 $20.000
BLADING
HR 40.000 $114.640 $212.300 $140.000 $100.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
AC 3.120 $2,525.000 $701.250 $1,565.000 $3,062.440
VEGETATIVE WATERING
MG 169.400 $19.270 $35.000 $34.000 $30.000
PROOF ROLLING
HR 16.000 $45.000 $75.000 $110.000 $50.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 39.000 $50.000 $173.000 $106.000 $100.000
LIME TRT (EXST MATL) (6")
SY 1,288.000 $4.650 $9.800 $15.980 $12.000
LIME (HYD, COM, OR QK(SLURRY))
TON 10.000 $196.790 $509.000 $260.000 $216.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 912.000 $4.000 $9.000 $3.400 $8.000
AGGR(TY-PD GR-4 OR TY-PL GR-4)
CY 19.000 $167.060 $222.000 $535.000 $400.000
CEM STABIL BKFL
CY 110.000 $82.240 $41.000 $185.000 $140.000
TEMPORARY SPL SHORING
SF 1,431.000 $18.490 $15.000 $64.000 $25.000
PRESTR CONC PIL (18 IN SQ)
LF 1,638.000 $140.000 $88.000 $127.000 $120.000
CL C CONC (ABUT)
CY 51.600 $900.000 $2,341.000 $2,900.000 $1,200.000
CL C CONC (CAP)
CY 20.600 $1,046.650 $2,870.000 $3,800.000 $1,850.000
REINF CONC SLAB (SLAB BEAM)
SF 5,670.000 $18.000 $22.500 $35.000 $25.000
APPROACH SLAB
CY 128.000 $340.970 $701.000 $630.000 $500.000
PRESTR CONC SLAB BEAM (4SB12)
LF 532.000 $133.000 $175.000 $183.000 $185.000
PRESTR CONC SLAB BEAM (5SB12)
LF 665.000 $160.000 $170.000 $163.000 $180.000
RIPRAP (CONC)(4 IN)
CY 76.000 $387.610 $778.000 $560.000 $540.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 199.000 $230.000 $218.000 $240.000 $200.000
RAIL (TY T223)
LF 318.000 $111.680 $218.000 $200.000 $115.000
ARMOR JOINT (SEALED)
LF 152.000 $110.000 $160.000 $140.000 $100.000
RC PIPE (CL III)(24 IN)
LF 114.000 $112.000 $164.000 $98.000 $80.000
RC PIPE (CL III)(60 IN)
LF 144.000 $345.000 $645.000 $500.000 $285.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,172.160 $2,712.000 $1,810.000 $1,700.000
SET (TY II) (60 IN) (RCP) (6: 1) (P)
EA 1.000 $14,000.000 $19,795.000 $22,100.000 $14,500.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $24,250.000 $25,806.000 $55,300.000 $154,000.000
MOBILIZATION
LS 1.000 $100,000.000 $125,000.000 $240,000.000 $240,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $2,500.000 $1,373.000 $2,300.000 $18,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 100.000 $33.000 $50.000 $36.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $9.240 $3.310 $8.100 $15.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 740.000 $5.800 $2.700 $5.600 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 740.000 $1.290 $1.000 $1.050 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 11.000 $4,143.790 $3,188.000 $6,150.000 $18,500.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 270.000 $41.110 $98.000 $105.000 $100.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 810.000 $3.990 $5.450 $10.980 $10.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 270.000 $7.000 $7.800 $28.000 $10.000
0512-XXXX PTB (SSCB)(STRUCTURAL)
LF 215.000 $200.000 $253.000 $78.000 $70.000
DRIVEWAYS (BASE)
SY 420.000 $22.000 $51.450 $33.000 $14.000
MTL W-BEAM GD FEN (TIM POST)
LF 800.000 $24.650 $26.000 $28.000 $23.600
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,850.000 $2,176.000 $1,840.000 $1,940.000
REMOVE METAL BEAM GUARD FENCE
LF 375.000 $2.500 $2.500 $2.550 $2.160
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,555.000 $3,500.000 $2,700.000 $3,115.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $350.000 $332.000 $255.000 $297.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,900.000 $1,795.000 $1,910.000 $2,000.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $900.000 $1,795.000 $910.000 $1,200.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $22,616.670 $30,692.000 $24,700.000 $6,995.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 15.000 $22.000 $27.900 $24.100 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $28.000 $44.650 $39.250 $25.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 540.000 $4.000 $3.350 $3.050 $3.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 120.000 $1.600 $5.600 $5.100 $2.500
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 4,320.000 $3.260 $3.350 $3.100 $3.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 96.000 $8.050 $16.750 $15.250 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 170.000 $0.950 $3.000 $3.350 $1.500
PAVEMENT SEALER 4"
LF 2,461.000 $0.200 $0.250 $0.220 $0.250
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 1,640.000 $0.340 $1.450 $1.380 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 821.000 $0.260 $1.600 $1.450 $0.500
REFL PAV MRKR TY II-A-A
EA 178.000 $3.100 $6.000 $5.450 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,461.000 $0.390 $0.900 $0.090 $0.500
ELIM EXT PAV MRK & MRKS (24")
LF 96.000 $3.000 $8.540 $7.700 $3.000
PAV SURF PREP FOR MRK (4")
LF 2,461.000 $0.010 $0.450 $0.430 $0.300
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 53.000 $90.160 $275.000 $425.000 $800.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 2.000 $152.000 $750.000 $620.000 $800.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 320.000 $119.000 $0.900 $135.000 $80.000
TMA (STATIONARY)
DAY 320.000 $310.000 $131.500 $300.000 $220.000
TMA (MOBILE OPERATION)
DAY 20.000 $200.000 $229.500 $675.000 $550.000
Totals: $1,576,883.516 $1,947,312.085 $2,437,423.660 $2,461,947.163