Show Job Controls
Bid Cobra

JASPER FM 1747 (0244-07-009)

Items: 63

County: JASPER
Length: N/A
Highway: FM 1747
District: BEAUMONT
Control Number: 0244-07-009
DBE Goal: 600.0%
Project: BR 2023(747)
Guaranty: N/A
Time: 123 WORKING DAYS
Engineer's Estimate: $1,843,497.52
Date: 12/06/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
BRYCE BROUSSARD
JIM GRISSOM
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,843,497.52
$1,733,589.28
Over/Under Est: -5.96% -$109,908.24
Over/Under Est: -2.87% -$52,965.86
Amt Left: 3.28% $56,942.38
Over/Under Est: 4.86% $89,545.48
Amt Left: 11.51% $199,453.72
Delta: -7.96% -$142,511.34
Over/Under Est: 5.82% $107,236.40
Amt Left: 12.53% $217,144.64
Delta: -0.92% -$17,690.92
$2,039,865.50
Over/Under Est: 10.65% $196,367.98
Amt Left: 17.67% $306,276.22
Delta: -4.57% -$89,131.58
Subcontractor Percentage Amount
CARTHAGE DRILLING, LLC 4.15% $71,943.96
MORRIS COUNTY CONTRACTORS, L.L.C. 2.89% $50,100.73
LELAND & BRADLEE CONSTRUCTION, INC. 2.84% $49,233.94
CAP RIVER LLC 1.26% $21,843.22
STRIPING TECHNOLOGY, L.P. 0.99% $17,162.53
DIAMOND ELITE BARRICADES, LLC 0.43% $7,454.43
PENHALL COMPANY 0.26% $4,507.33
Total: 12.82% $222,246.14

Bid Items & Bid Tabulations

63 Total 0 of 63
JASPER  |  FM 1747  |  BEAUMONT  |  0244-07-009  |  12/06/2023  |  $1,843,497.52  |  BR 2023(747)  |  BRIDGE REPL  |  123 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAYFORD'S TRUCK & TRACTOR
TEXAS MATERIALS GROUP, INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
RAGLE CONSTRUCTION, INC.
ISI CONTRACTING, INC.
PREPARING ROW
STA 12.000 $4,700.000 $8,000.000 $1,675.000 $5,000.000 $10,000.000 $3,377.000
REMOVING CONC (RIPRAP)
SY 52.000 $50.000 $40.000 $53.000 $40.000 $16.000 $126.000
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 3,614.000 $8.000 $7.800 $8.250 $20.000 $6.500 $20.000
EXCAVATION (ROADWAY)
CY 237.000 $30.000 $18.000 $53.250 $40.000 $198.000 $23.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 6,353.000 $40.000 $24.860 $49.850 $40.000 $36.500 $32.000
BROADCAST SEED (TEMP) (WARM)
SY 2,600.000 $1.000 $1.250 $0.360 $1.000 $0.340 $0.900
BROADCAST SEED (TEMP) (COOL)
SY 2,600.000 $1.000 $1.250 $0.360 $1.000 $0.330 $0.900
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 5,200.000 $0.750 $2.000 $0.510 $1.000 $0.490 $1.800
VEGETATIVE WATERING
MG 52.000 $35.000 $1.000 $48.000 $1.000 $94.000 $68.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 2,980.000 $2.500 $3.350 $1.150 $2.000 $0.960 $2.800
PROOF ROLLING
HR 43.000 $130.000 $100.000 $151.000 $1.000 $115.000 $32.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 906.000 $120.000 $156.000 $164.000 $100.000 $142.000 $140.000
CEMENT
TON 46.000 $250.000 $300.000 $358.000 $350.000 $350.000 $167.000
CEMENT TREAT (NEW BASE) (8")
SY 4,078.000 $6.000 $5.000 $5.890 $20.000 $3.600 $10.800
ASPH (RC-250)
GAL 773.000 $16.000 $40.000 $9.050 $10.000 $9.250 $10.800
AGGR(TY-L GR-5 SAC-B)
CY 31.000 $200.000 $300.000 $668.000 $800.000 $680.000 $771.000
FLOWABLE BACKFILL
CY 110.000 $450.000 $325.000 $260.000 $280.000 $194.000 $219.000
DRILL SHAFT (18 IN)
LF 164.000 $200.000 $190.000 $244.000 $150.000 $93.000 $253.000
DRILL SHAFT (36 IN)
LF 328.000 $405.000 $350.000 $420.000 $375.000 $329.000 $782.000
CL C CONC (ABUT)
CY 47.200 $1,200.000 $1,400.000 $1,350.000 $2,200.000 $850.000 $1,115.000
REINF CONC SLAB
SF 2,720.000 $31.000 $35.000 $42.750 $38.000 $35.000 $41.000
APPROACH SLAB
CY 51.400 $825.000 $1,000.000 $755.000 $1,200.000 $566.000 $911.000
PRESTR CONC GIRDER (TX34)
LF 318.000 $250.000 $300.000 $276.000 $350.000 $261.000 $338.000
RIPRAP (CONC)(5 IN)
CY 4.000 $500.000 $1,500.000 $2,200.000 $800.000 $651.000 $1,410.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 577.000 $250.000 $225.000 $198.000 $220.000 $180.000 $230.000
RIPRAP (MOW STRIP)(4 IN)
CY 22.000 $600.000 $750.000 $940.000 $650.000 $653.000 $797.000
RAIL (TY T223)
LF 212.000 $180.000 $160.000 $255.000 $170.000 $138.000 $160.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 67.000 $280.000 $200.000 $278.000 $200.000 $212.000 $206.000
RC PIPE (CL III)(24 IN)
LF 101.000 $150.000 $150.000 $143.000 $80.000 $98.000 $118.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $3,200.000 $2,500.000 $2,580.000 $2,500.000 $2,350.000 $2,451.000
REMOV STR (PIPE)
LF 92.000 $30.000 $25.000 $40.000 $10.000 $7.700 $35.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $50,000.000 $25,000.000 $53,000.000 $80,000.000 $250,000.000 $90,050.000
MOBILIZATION
LS 1.000 $266,728.320 $170,000.000 $97,000.000 $165,000.000 $190,000.000 $202,404.600
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $3,000.000 $1,800.000 $1,500.000 $7,000.000 $10,000.000 $5,708.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 105.000 $55.000 $40.000 $68.250 $1.000 $65.000 $188.000
ROCK FILTER DAMS (REMOVE)
LF 105.000 $14.000 $12.500 $15.750 $1.000 $15.000 $50.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $30.000 $45.000 $86.750 $1.000 $30.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $10.000 $10.000 $50.000 $1.000 $15.000 $18.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,009.000 $2.000 $4.000 $5.250 $1.000 $4.250 $4.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,009.000 $1.000 $1.500 $1.050 $1.000 $0.250 $1.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 105.000 $10.000 $12.000 $5.250 $1.000 $5.000 $24.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 105.000 $3.000 $5.000 $1.050 $1.000 $1.000 $3.100
DRIVEWAYS (ACP)
SY 121.000 $75.000 $143.000 $153.000 $90.000 $75.000 $205.000
TURNOUTS (ACP)
SY 51.000 $55.000 $200.000 $145.000 $90.000 $75.000 $205.000
MTL W-BEAM GD FEN (TIM POST)
LF 287.500 $35.000 $32.000 $31.710 $25.000 $28.500 $16.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,200.000 $2,084.000 $1,700.000 $3,397.130 $2,221.000
TL-3 31" SHORT RADIUS (POSTS 2 THRU 7)
EA 1.000 $11,000.000 $25,000.000 $13,500.000 $18,000.000 $11,110.000 $11,471.000
REMOVE METAL BEAM GUARD FENCE
LF 212.500 $3.000 $5.000 $4.750 $2.000 $3.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,500.000 $3,800.000 $3,400.000 $2,800.000 $3,100.000 $2,748.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $800.000 $367.500 $500.000 $471.000 $236.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $260.000 $500.000 $372.750 $1,200.000 $225.000 $514.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000 $650.000 $825.000 $787.500 $1,200.000 $665.000 $670.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $700.000 $900.000 $769.000 $1,200.000 $735.000 $765.000
REMOVE SM RD SN SUP&AM
EA 6.000 $100.000 $200.000 $99.750 $50.000 $100.000 $135.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $40.000 $30.000 $31.500 $50.000 $25.000 $21.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $30.000 $35.000 $31.500 $50.000 $29.500 $36.000
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 2,209.000 $1.000 $5.000 $1.750 $3.500 $1.500 $2.300
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 2,396.000 $1.200 $5.000 $1.750 $4.000 $1.500 $2.200
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 20.000 $3.000 $35.000 $20.480 $30.000 $20.000 $30.000
REFL PAV MRKR TY II-A-A
EA 60.000 $4.500 $12.500 $5.750 $20.000 $5.000 $11.000
TACK COAT
GAL 232.000 $15.000 $40.000 $24.000 $10.000 $28.000 $15.300
D-GR HMA TY-D SAC-A PG76-22 (EXEMPT)
TON 426.000 $350.000 $250.000 $275.000 $300.000 $285.000 $288.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 45.000 $85.000 $250.000 $95.500 $80.000 $71.000 $99.000
Totals: $1,843,497.520 $1,733,589.280 $1,790,531.670 $1,933,043.000 $1,950,733.920 $2,039,865.500