JASPER US 69 (0200-04-024)

Items: 45

County: JASPER
Length: N/A
Highway: US 69
District: BEAUMONT
Control Number: 0200-04-024
DBE Goal: N/A
Project: NH 2019(629)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $11,758,395.55
Date: 02/06/2019 (7 years ago)
Contract Number: N/A
Type: OVERLAY EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$11,758,395.55
$10,120,117.27
Over/Under Est: -13.93% -$1,638,278.28
Over/Under Est: -6.48% -$762,034.08
Amt Left: 8.66% $876,244.20
$11,637,385.49
Over/Under Est: -1.03% -$121,010.06
Amt Left: 14.99% $1,517,268.22
Delta: -5.83% -$641,024.02
Over/Under Est: 5.92% $695,757.81
Amt Left: 23.06% $2,334,036.09
Delta: -7.02% -$816,767.87
Over/Under Est: 6.88% $808,901.07
Amt Left: 24.18% $2,447,179.35
Delta: -0.91% -$113,143.26

Bid Items & Bid Tabulations

45 Total 0 of 45
JASPER  |  US 69  |  BEAUMONT  |  0200-04-024  |  02/06/2019  |  $11,758,395.55  |  NH 2019(629)  |  OVERLAY EXIST ROADWAY  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
HERITAGE ASPHALT COMPANY LLC
TEXAS MATERIALS GROUP, INC.
SMITH & COMPANY
MOORE BROTHERS CONSTRUCTION COMPANY
DREWERY CONSTRUCTION COMPANY, INCORPORATED
REMOVING CONCRETE(MOW STRIP)
LF 1,350.000 $5.000 $16.500 $16.000 $15.000 $11.000 $12.000
BACKFILL (TY A OR B)
STA 907.490 $130.000 $200.000 $118.000 $150.000 $164.190 $160.000
D-GR HMA(SQ) TY-D PG64-22
TON 3,258.000 $100.000 $100.000 $106.000 $111.000 $115.000 $117.000
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 59,750.000 $100.000 $105.500 $116.000 $102.250 $109.400 $110.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(21")
SY 1,000.000 $80.000 $150.000 $126.000 $150.000 $200.000 $380.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 71,472.000 $2.000 $3.040 $3.000 $2.500 $2.980 $3.250
RIPRAP (MOW STRIP)(4 IN)
CY 120.000 $450.000 $450.000 $646.000 $618.000 $633.000 $750.000
MOBILIZATION
LS 1.000 $800,000.000 $730,000.000 $870,000.000 $875,000.000 $825,000.000 $3,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $3,000.000 $5,000.000 $1,600.000 $25,000.000 $3,500.000 $15,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,000.000 $10.000 $4.000 $5.000 $6.250 $5.750 $5.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $2.000 $1.500 $1.000 $2.000 $1.150 $1.050
INTERSECTIONS (ACP)
SY 4,535.000 $50.000 $65.000 $31.000 $29.000 $27.770 $40.000
RUMBLE STRIPS (SHOULDER)
LF 181,408.000 $0.200 $0.120 $0.150 $0.140 $0.140 $0.120
RUMBLE STRIPS (CENTERLINE)
LF 90,704.000 $0.200 $0.120 $0.150 $0.160 $0.160 $0.120
MTL W-BEAM GD FEN (TIM POST)
LF 1,675.000 $20.000 $22.000 $19.000 $20.400 $21.300 $19.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,000.000 $1,500.000 $1,300.000 $1,479.000 $1,475.000 $1,350.000
REMOVE METAL BEAM GUARD FENCE
LF 1,575.000 $5.000 $3.000 $2.500 $2.000 $2.850 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,500.000 $3,000.000 $2,300.000 $2,350.000 $2,660.000 $2,400.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $500.000 $225.000 $260.000 $200.000 $281.000 $262.500
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 30.000 $20.000 $28.000 $15.000 $10.000 $17.250 $16.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 15.000 $40.000 $28.000 $28.000 $20.000 $30.000 $29.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 45,400.000 $0.250 $0.200 $0.200 $0.200 $0.200 $0.210
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 201,612.000 $0.250 $0.200 $0.200 $0.410 $0.180 $0.210
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,493.000 $0.500 $1.000 $0.400 $0.410 $0.280 $0.420
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 24,200.000 $0.250 $0.300 $0.200 $0.200 $0.200 $0.210
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 193,443.000 $0.250 $0.200 $0.200 $0.200 $0.200 $0.210
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 6,912.000 $1.500 $1.000 $1.500 $1.570 $1.250 $0.770
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 11,676.000 $1.500 $1.000 $1.600 $1.550 $1.250 $0.940
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,493.000 $0.700 $1.000 $0.650 $0.660 $0.830 $0.680
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 45,400.000 $0.300 $0.300 $0.300 $0.310 $0.340 $0.320
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 201,504.000 $0.300 $0.300 $0.300 $0.300 $0.310 $0.300
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 24,200.000 $0.300 $0.300 $0.300 $0.310 $0.350 $0.320
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 193,443.000 $0.300 $0.250 $0.300 $0.300 $0.310 $0.300
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 337.000 $10.000 $5.000 $6.000 $6.120 $7.500 $6.300
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 288.000 $20.000 $12.000 $12.500 $12.240 $15.000 $12.600
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $220.000 $200.000 $200.000 $200.000 $220.000 $210.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 24.000 $800.000 $500.000 $435.000 $425.000 $385.000 $435.750
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 17.000 $40.000 $50.000 $36.000 $36.000 $34.000 $36.750
PREFAB PAV MRK TY C(EVAC SYM, BLUE/WHT)
EA 6.000 $500.000 $600.000 $400.000 $400.000 $385.000 $420.000
REFL PAV MRKR TY I-C
EA 1,632.000 $3.000 $3.000 $3.000 $3.000 $3.000 $4.000
REFL PAV MRKR TY II-A-A
EA 2,804.000 $4.500 $3.000 $3.000 $3.000 $3.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 3,390.000 $0.500 $1.000 $0.500 $0.460 $0.550 $0.500
NO. OF WORKING DAYS
$/D 15,000.000 $230.000 $85.000 $110.000 $180.000 $230.000 $60.000
TMA (STATIONARY)
DAY 135.000 $200.000 $505.000 $375.000 $892.000 $50.000 $475.000
TMA (MOBILE OPERATION)
DAY 45.000 $200.000 $300.000 $325.000 $102.000 $75.000 $120.000
Totals: $11,758,395.550 $10,120,117.270 $10,996,361.470 $11,637,385.490 $12,454,153.363 $12,567,296.620