Show Job Controls
Bid Cobra

JACKSON SH 35 (0179-09-041)

Items: 76

County: JACKSON
Length: 1.2580 MILES
Highway: SH 35
District: YOAKUM
Control Number: 0179-09-041
DBE Goal: 0.0%
Project: BR 2026(242)
Guaranty: $100,000.00
Time: 319 WORKING DAYS
Engineer's Estimate: $21,500,022.25
Date: 04/08/2026 (2 months ago)
Contract Number: 4263204
Type: BRIDGE REPLACEMENT
Project ID: A00188972
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES INCLUDING WIDEN PAVEMENT, REALIGN OF ROADWAY, PLACEMENT OF ACP, UPGRADE TO STANDARD, PROPOSED DRAINAGE MODIFICATIONS, AND EXPAND PORT ECONOMY ACCESSIBILITY.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JAMES HARRIS
JAMES JANAK
PAUL RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$21,500,022.25
$25,784,014.85
Over/Under Est: 19.93% $4,283,992.60
$26,362,999.84
Over/Under Est: 22.62% $4,862,977.59
Amt Left: 2.25% $578,984.99
$32,149,042.87
Over/Under Est: 49.53% $10,649,020.62
Amt Left: 24.69% $6,365,028.02
Delta: -21.95% -$5,786,043.03
Over/Under Est: 74.97% $16,117,662.85
Amt Left: 45.9% $11,833,670.25
Delta: -17.01% -$5,468,642.23

Bid Items & Bid Tabulations

76 Total 0 of 76
JACKSON  |  SH 35  |  YOAKUM  |  0179-09-041  |  04/08/2026  |  $21,500,022.25  |  BR 2026(242)  |  BRIDGE REPL  |  319 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
ORION CONSTRUCTION, LLC
HUNTER INDUSTRIES, LTD.
ZACHRY CONSTRUCTION CORPORATION
PREPARING ROW
STA 66.400 $25,000.000 $50,000.000 $39,608.430 $48,382.030 $57,000.000
REMOV CONC (RIPRAP)
SY 1,832.000 $28.000 $10.000 $12.000 $50.400 $18.000
REMOV CONC (DRIVEWAYS)
SY 137.000 $20.000 $25.000 $10.000 $50.400 $25.500
OBLITERATING ABANDONED ROAD
SY 11,045.000 $12.000 $6.800 $1.800 $13.200 $18.500
EXCAV (ROADWAY)
CY 21,426.000 $20.000 $18.000 $11.000 $30.000 $25.000
EMBANK (FNL)(OC)(TY C)
CY 17,402.000 $23.000 $85.000 $8.000 $36.000 $45.000
BLADING
HR 28.000 $155.000 $130.000 $575.000 $144.000 $275.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 46,925.000 $0.750 $0.450 $0.500 $1.200 $0.800
BROADCAST SEED (TEMP_WARM)
SY 11,731.000 $0.750 $0.350 $0.380 $1.570 $0.800
BROADCAST SEED (TEMP_COOL)
SY 11,731.000 $0.750 $0.350 $0.380 $1.610 $0.800
VEGETATIVE WATERING
TGL 396.000 $50.000 $30.000 $45.000 $27.600 $43.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 3,404.000 $130.000 $135.000 $135.000 $152.210 $200.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 292.000 $330.000 $360.000 $375.000 $378.000 $510.000
LIME TRT (EXIST MATL & NEW BASE)(8")
SY 16,231.000 $4.000 $4.000 $3.300 $7.200 $12.000
ASPH (RC-250)
GAL 3,063.000 $5.500 $5.200 $7.500 $5.640 $13.000
AGGR (TY-E, GR-5)(SAC-B)
CY 109.000 $750.000 $280.000 $250.000 $274.760 $350.000
AGGR (TY-PE, GR-4)(SAC-B)
CY 181.000 $750.000 $280.000 $215.000 $275.770 $350.000
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 6,127.000 $5.500 $8.000 $6.000 $6.300 $10.000
D-GR HMA TY-B PG64-22
TON 2,426.000 $200.000 $195.000 $180.000 $144.000 $230.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 81.000 $150.000 $245.000 $275.000 $170.400 $420.000
D-GR HMA TY-D SAC-B PG76-22
TON 2,865.000 $200.000 $225.000 $210.000 $158.400 $270.000
TACK COAT
GAL 2,910.000 $4.000 $5.200 $6.000 $3.840 $18.000
CEM STABIL BKFL
CY 252.000 $215.000 $175.000 $400.000 $220.000 $250.000
TEMPORARY SPL SHORING
SF 3,378.000 $75.000 $60.000 $0.250 $125.000 $7.000
PRESTR CONC PIL (18 IN SQ)
LF 176.000 $200.000 $175.000 $285.000 $560.000 $560.000
PRESTR CONC PIL (24 IN SQ)
LF 14,492.000 $245.000 $214.600 $290.000 $560.000 $605.000
CL B CONC (FLUME)
CY 11.600 $1,100.000 $715.000 $1,750.000 $900.000 $2,100.000
CL C CONC (ABUT)
CY 56.800 $1,700.000 $1,400.000 $2,250.000 $2,500.000 $2,900.000
CL C CONC (CAP)
CY 644.800 $1,500.000 $1,400.000 $2,250.000 $2,750.000 $3,350.000
REINF CONC SLAB
SF 117,760.000 $23.000 $24.000 $33.000 $40.000 $36.000
APPROACH SLAB
CY 70.600 $875.000 $625.000 $900.000 $900.000 $950.000
PRESTR CONC GIRDER (TX34)
LF 15,264.000 $205.000 $220.000 $319.000 $238.000 $275.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,988.000 $220.000 $225.000 $225.000 $318.700 $260.000
RAIL (TY SSTR)
LF 5,172.000 $115.000 $63.000 $80.000 $131.700 $255.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 516.000 $250.000 $205.000 $305.780 $297.680 $320.000
RC PIPE (CL III)(18 IN)
LF 310.000 $125.000 $80.000 $123.000 $136.720 $120.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 12.000 $1,500.000 $1,380.000 $3,200.000 $4,846.520 $3,700.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 1.000 $1,550,000.000 $1,100,000.000 $2,000,000.000 $950,000.000 $2,300,000.000
REMOV STR (SMALL)
EA 7.000 $1,600.000 $620.000 $2,400.000 $1,710.730 $3,000.000
MOBILIZATION
LS 1.000 $2,500,000.000 $2,500,000.000 $2,630,000.000 $3,214,183.110 $3,750,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $15,000.000 $125,000.000 $20,000.000 $15,500.000 $40,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $75,000.000 $35,000.000 $11,000.150 $25,000.000
TMA (STATIONARY)
DAY 20.000 $500.000 $450.000 $750.000 $550.010 $300.000
TMA (MOBILE OPERATION)
DAY 20.000 $500.000 $750.000 $1,300.000 $1,100.020 $1,150.000
ROCK FILTER DAMS (INSTALL) (TY 1)
CY 13.000 $45.000 $45.000 $55.000 $48.610 $250.000
SANDBAGS FOR EROSION CONTROL
EA 142.000 $18.000 $3.000 $4.000 $15.850 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 946.000 $4.000 $4.250 $7.000 $4.430 $15.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 946.000 $1.500 $2.500 $2.500 $1.410 $2.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,260.000 $50.000 $175.000 $115.000 $100.000 $75.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,260.000 $20.000 $15.000 $30.000 $50.000 $20.000
DRIVEWAYS (CONC)
SY 137.000 $140.000 $115.000 $119.000 $297.600 $375.000
DRIVEWAYS (SURF TREAT)
SY 968.000 $32.000 $65.000 $30.000 $52.800 $275.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 8,080.000 $0.300 $0.500 $0.390 $1.380 $0.600
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 4,040.000 $0.300 $0.920 $0.470 $1.380 $0.600
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $28.000 $33.500 $35.000 $30.710 $46.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $2,500.000 $1,944.000 $2,000.000 $2,885.340 $3,600.000
REMOVE METAL BEAM GUARD FENCE
LF 474.000 $3.000 $4.250 $4.250 $6.600 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,400.000 $3,343.000 $3,510.000 $4,109.660 $5,350.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $425.000 $380.000 $400.000 $330.000 $160.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,500.000 $1,350.000 $1,250.000 $1,320.020 $2,120.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1,350.000 $600.000 $1,320.020 $800.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $16,000.000 $20,000.000 $10,000.000 $10,227.940 $12,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $900.000 $890.000 $900.000 $1,045.010 $1,350.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,000.000 $1,270.000 $1,300.000 $1,650.020 $1,550.000
REMOVE SM RD SN SUP&AM
EA 7.000 $100.000 $95.000 $120.000 $137.500 $105.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 102.000 $29.000 $21.000 $22.000 $71.500 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $35.000 $35.000 $36.000 $104.500 $80.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 7,350.000 $1.350 $0.850 $0.500 $0.460 $1.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 6,990.000 $1.350 $0.850 $0.500 $0.460 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 350.000 $2.000 $1.000 $7.000 $1.830 $2.000
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 5,200.000 $1.200 $1.550 $1.200 $1.270 $1.500
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 5,200.000 $1.000 $1.550 $1.200 $1.270 $1.500
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 8,805.000 $0.500 $0.910 $0.800 $1.080 $1.500
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 1,755.000 $0.500 $0.950 $2.250 $2.200 $3.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 7,050.000 $0.500 $0.910 $0.700 $1.080 $1.000
PAV SURF PREP FOR MRK (6")
LF 10,400.000 $0.040 $0.200 $0.110 $0.110 $0.200
Totals: $21,500,022.250 $25,784,014.850 $26,362,999.842 $32,149,042.872 $37,617,685.100
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $1,500.00