Show Job Controls
Bid Cobra

HUTCHINSON SH 152 (0455-01-048)

Items: 107

County: HUTCHINSON
Length: N/A
Highway: SH 152
District: AMARILLO
Control Number: 0455-01-048
DBE Goal: N/A
Project: F 2023(821)
Guaranty: N/A
Time: 114 WORKING DAYS
Engineer's Estimate: $8,506,438.45
Date: 06/02/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
BERNARDO FERREL
OFELIA GARBALENA
KENNETH PETR
LADENIA JEWITT
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$8,506,438.45
1
$7,851,871.78
Over/Under Est: -7.69% -$654,566.67
$8,248,997.44
Over/Under Est: -3.03% -$257,441.01
Amt Left: 5.06% $397,125.66
$8,630,396.88
Over/Under Est: 1.46% $123,958.43
Amt Left: 9.92% $778,525.10
Delta: -4.62% -$381,399.44
Subcontractor Percentage Amount
BAHENA CONSTRUCTION CO., INC. 7.97% $656,928.67
DUSTIN ALLEN, INC. 4.98% $410,477.38
GIBSON & ASSOCIATES, INC. 3.43% $282,718.36
TRP CONSTRUCTION GROUP, LLC 1.57% $129,407.53
DK CONTRACTING, LLC 1.06% $87,370.69
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.82% $67,588.65
DUSTROL, INC. 0.55% $45,333.85
WITHERS CONSTRUCTION, LLC 0.50% $41,212.59
BARRICADES UNLIMITED 0.27% $22,254.80
SURFACE PREPARATION TECHNOLOGIES, LLC 0.25% $20,606.29
SURFACE PREPARATION TECHNOLOGIES, LLC 0.14% $11,539.52
NELSON INDUSTRIAL SERVICES, INC. 0.08% $6,594.01
Total: 21.62% $1,782,032.34

Bid Items & Bid Tabulations

107 Total 0 of 107
HUTCHINSON  |  SH 152  |  AMARILLO  |  0455-01-048  |  06/02/2023  |  $8,506,438.45  |  F 2023(821)  |  RESURF ROADWAY  |  114 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
DUININCK, INC.
J. LEE MILLIGAN, INC.
PREPARING ROW
AC 11.000 $7,500.000 $4,050.000 $3,900.000 $5,000.000
PREPARING ROW
STA 703.000 $200.000 $32.870 $8.150 $14.650
REMOVING CONC (RIPRAP)
SY 65.000 $50.000 $32.400 $18.500 $46.600
REMOVING CONC (CURB AND GUTTER)
LF 16.000 $50.000 $32.400 $20.500 $43.500
EXCAVATION (ROADWAY)
CY 308.000 $40.000 $49.260 $28.500 $28.250
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,036.000 $40.000 $48.680 $49.000 $40.000
BACKFILL (TY A)
STA 711.000 $220.000 $227.150 $240.000 $290.000
BLADING
STA 27.000 $190.000 $167.010 $215.000 $315.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
AC 26.000 $700.000 $588.600 $525.000 $575.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 33.000 $700.000 $588.600 $510.000 $575.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 33.000 $420.000 $432.000 $500.000 $420.000
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 32.000 $700.000 $16.870 $500.000 $16.500
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 9,000.000 $2.500 $2.160 $4.100 $2.150
EMULS ASPH (EROSN CONT)(MULTI)
GAL 15,972.000 $4.000 $3.940 $4.600 $3.850
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 9,919.000 $20.000 $19.310 $26.000 $27.250
PLANE ASPH CONC PAV(0" TO 2")
SY 11,098.000 $3.000 $4.830 $4.900 $4.150
PLANE ASPH CONC PAV (2")
SY 12,533.000 $3.000 $4.670 $3.750 $3.250
CUT & RESTORE ASPH PAVING
SY 18.000 $300.000 $162.000 $100.000 $575.000
CL A CONC (COLLAR)
EA 20.000 $1,100.000 $1,296.000 $2,000.000 $2,110.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 146.000 $210.000 $97.200 $92.000 $95.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 228.000 $230.000 $129.600 $120.000 $126.550
RIPRAP (CONC)(5 IN)
CY 72.000 $750.000 $756.000 $840.000 $870.150
RIPRAP (MOW STRIP)(4 IN)
CY 261.000 $750.000 $756.000 $895.000 $738.280
CLEANING EXISTING JOINTS
LF 120.000 $25.000 $21.600 $20.500 $21.100
MULTI-LAYER POLYMER OVERLAY
SY 989.000 $70.000 $61.560 $58.000 $60.150
HEADER TYPE EXPANSION JOINT
CF 40.000 $460.000 $1,317.600 $1,200.000 $1,285.000
JOINT SEALANT
LF 160.000 $45.000 $187.920 $180.000 $185.000
JOINT SEALANT (SPL)
LF 160.000 $50.000 $166.320 $155.000 $165.000
CMP (GAL STL 24 IN)
LF 10.000 $150.000 $232.200 $155.000 $160.000
CMP (GAL STL 48 IN)
LF 16.000 $300.000 $594.000 $255.000 $265.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 14.000 $750.000 $1,080.000 $920.000 $950.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 4.000 $750.000 $1,296.000 $1,000.000 $1,055.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 4.000 $1,000.000 $1,620.000 $1,200.000 $1,265.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 4.000 $1,500.000 $1,944.000 $1,400.000 $1,475.000
CONC BOX CULV (4 FT X 2.5 FT) (EXTEND)
LF 10.000 $1,500.000 $1,512.000 $1,200.000 $1,265.000
RC PIPE (CL III)(18 IN)
LF 4.000 $200.000 $108.000 $205.000 $210.000
RC PIPE (CL III)(24 IN)
LF 52.000 $210.000 $135.000 $225.000 $235.000
RC PIPE (CL III)(30 IN)
LF 10.000 $300.000 $162.000 $275.000 $285.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $9,500.000 $9,180.000 $11,500.000 $12,130.000
SET (TY I) (30 IN) (3: 1) (C)
EA 1.000 $4,000.000 $5,400.000 $14,500.000 $14,765.000
SET (TY I) (42 IN) (4: 1) (C)
EA 1.000 $7,500.000 $8,100.000 $24,500.000 $25,300.000
SET (TY I) (48 IN) (4: 1) (C)
EA 4.000 $8,500.000 $9,180.000 $23,000.000 $23,750.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $10,000.000 $7,020.000 $14,500.000 $14,765.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 3.000 $11,000.000 $7,560.000 $13,500.000 $13,700.000
SET (TY I)(S=3 FT)(HW= 5 FT)(4:1)(C)
EA 2.000 $12,000.000 $8,100.000 $20,000.000 $20,565.000
SET (TY I)(S=3 FT)(HW= 5 FT)(6:1)(C)
EA 1.000 $14,000.000 $9,180.000 $18,000.000 $18,450.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $14,000.000 $8,100.000 $14,500.000 $14,765.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
EA 1.000 $16,000.000 $12,960.000 $28,000.000 $29,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
EA 1.000 $14,000.000 $8,640.000 $10,000.000 $10,550.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 1.000 $15,000.000 $10,800.000 $13,000.000 $13,200.000
SET (TY I)(S= 5 FT)(HW= 7 FT)(4:1) (C)
EA 2.000 $16,000.000 $16,200.000 $26,000.000 $26,900.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $2,250.000 $1,296.000 $2,300.000 $2,375.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 1.000 $2,250.000 $1,944.000 $2,600.000 $2,640.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $2,250.000 $1,944.000 $2,600.000 $2,640.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $2,750.000 $2,160.000 $3,100.000 $3,165.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $2,750.000 $2,160.000 $3,100.000 $3,165.000
SHOT BLASTING
SY 989.000 $14.000 $12.420 $11.500 $12.150
REMOV STR (HEADWALL)
EA 24.000 $1,100.000 $1,512.000 $2,000.000 $2,110.000
REMOV STR (PIPE)
LF 37.000 $30.000 $32.400 $20.500 $21.000
REMOV STR (BOX CULVERT)
LF 33.000 $90.000 $162.000 $155.000 $160.000
MOBILIZATION
LS 1.000 $660,000.000 $314,074.870 $740,000.000 $860,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $18,000.000 $26,487.390 $14,500.000 $36,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 725.000 $3.500 $4.480 $7.650 $7.700
BIODEG EROSN CONT LOGS (REMOVE)
LF 725.000 $1.250 $1.080 $2.050 $5.450
CONC CURB & GUTTER (TY I)
LF 16.000 $75.000 $108.000 $92.000 $95.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 105,475.000 $0.200 $0.120 $0.120 $0.200
MTL W-BEAM GD FEN (STEEL POST)
LF 9,070.000 $34.000 $31.320 $29.500 $34.300
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,500.000 $2,916.380 $2,400.000 $3,240.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 18.000 $1,150.000 $1,647.000 $1,600.000 $1,530.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $38.000 $36.720 $34.500 $30.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $1,050.000 $1,069.200 $1,000.000 $1,265.000
CONNECTOR PLATE FOR THRIE BEAM
EA 6.000 $1,050.000 $1,053.000 $995.000 $685.000
REMOVE METAL BEAM GUARD FENCE
LF 1,875.000 $2.500 $3.240 $3.050 $2.100
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $225.000 $324.000 $305.000 $210.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $300.000 $324.000 $305.000 $210.000
GUARDRAIL END TREATMENT (INSTALL)
EA 24.000 $3,600.000 $3,213.000 $3,000.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $285.000 $324.000 $305.000 $210.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000 $950.000 $772.200 $730.000 $885.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 3.000 $1,200.000 $874.800 $825.000 $950.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 18.000 $1,000.000 $933.120 $880.000 $1,030.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 21.000 $1,350.000 $1,297.080 $1,200.000 $1,345.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,520.000 $1,293.840 $1,200.000 $1,370.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 17.000 $30.000 $25.870 $25.500 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 17.000 $30.000 $25.870 $25.500 $20.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 431.000 $20.000 $5.400 $30.500 $10.550
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 190.000 $30.000 $53.950 $51.000 $44.300
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 15.000 $30.000 $53.950 $51.000 $44.300
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 41.000 $120.000 $131.760 $125.000 $155.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
EA 44.000 $120.000 $131.760 $125.000 $155.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 13.000 $120.000 $131.760 $125.000 $155.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 9.000 $125.000 $131.760 $125.000 $155.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 85.000 $130.000 $131.760 $125.000 $155.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,566.000 $1.000 $1.980 $1.350 $1.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 31.000 $20.000 $54.000 $15.500 $52.750
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $275.000 $432.000 $305.000 $420.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 135.000 $42.000 $64.800 $41.000 $63.250
REFL PAV MRKR TY II-C-R
EA 1,070.000 $10.000 $5.400 $3.950 $5.250
SP MIXES SP-D SAC-A PG70-28
TON 35,883.000 $138.000 $132.460 $122.150 $124.750
TACK COAT
GAL 42,496.000 $5.750 $4.790 $8.750 $6.250
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $9,276.700 $8,700.000 $8,470.000
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
LF 17,982.000 $0.700 $0.750 $0.620 $0.750
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
LF 71,616.000 $0.650 $0.750 $0.600 $0.750
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
LF 71,616.000 $0.650 $0.750 $0.600 $0.750
TMA (STATIONARY)
DAY 110.000 $255.000 $383.940 $205.000 $380.000
TMA (MOBILE OPERATION)
HR 80.000 $100.000 $82.920 $97.000 $87.000
CLEANING STRUCTURE (BENT)
EA 11.000 $1,000.000 $1,620.000 $1,500.000 $1,580.000
CLEANING STRUCTURE (ABUTMENT)
EA 8.000 $800.000 $1,620.000 $1,500.000 $1,580.000
Totals: $8,506,438.450 $7,851,871.780 $8,248,997.440 $8,630,396.880