Bid Cobra

HUDSPETH IH 10 (0002-07-049)

Items: 129

County: HUDSPETH
Length: N/A
Highway: IH 10
District: EL PASO
Control Number: 0002-07-049
DBE Goal: N/A
Project: BR 1802(572)
Guaranty: N/A
Time: 238 WORKING DAYS
Engineer's Estimate: $5,465,089.59
Date: 11/07/2018 (7 years ago)
Contract Number: N/A
Type: REPLACE BRIDGES AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$5,465,089.59
$5,693,876.60
Over/Under Est: 4.19% $228,787.01
$6,222,253.27
Over/Under Est: 13.85% $757,163.68
Amt Left: 9.28% $528,376.67
Over/Under Est: 17.39% $950,389.76
Amt Left: 12.67% $721,602.75
Delta: -3.11% -$193,226.08
Over/Under Est: 32.4% $1,770,854.71
Amt Left: 27.08% $1,542,067.70
Delta: -12.79% -$820,464.95
$8,699,582.45
Over/Under Est: 59.18% $3,234,492.86
Amt Left: 52.79% $3,005,705.85
Delta: -20.23% -$1,463,638.15

Bid Items & Bid Tabulations

129 Total 0 of 129
HUDSPETH  |  IH 10  |  EL PASO  |  0002-07-049  |  11/07/2018  |  $5,465,089.59  |  BR 1802(572)  |  REPLACE BRIDGES AND APPROACHES  |  238 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
J.D. ABRAMS, L.P.
INTERNATIONAL EAGLE ENTERPRISES, INC.
LESNA CONSTRUCTION, INC.
FNF CONSTRUCTION, INC.
PREPARING ROW
AC 0.190 $10,000.000 $40,000.000 $100,000.000 $80,000.000 $30,000.000 $60,000.000
REMOVING CONC (PAV)
SY 2,076.000 $11.000 $15.000 $15.000 $26.000 $17.500 $41.000
REMOVING CONC (RIPRAP)
SY 1,920.000 $10.000 $10.000 $10.000 $10.000 $15.500 $13.000
REMOVING CONC (SIDEWALKS)
SY 285.000 $19.250 $12.000 $25.000 $30.000 $15.500 $11.500
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 3,492.000 $6.750 $6.000 $8.000 $6.000 $5.750 $8.000
EXCAVATION (ROADWAY)
CY 8,485.000 $18.650 $19.000 $11.500 $7.000 $12.000 $18.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 105.000 $25.000 $30.000 $20.000 $100.000 $21.000 $10.250
FL BS (CMP IN PLC)(TY A GR 5)(6")
SY 972.000 $13.250 $18.000 $17.500 $16.000 $22.000 $20.250
PRIME COAT(MC-30 OR AE-P)
GAL 432.000 $3.250 $6.500 $6.250 $8.000 $8.000 $13.500
D-GR HMA(SQ) TY-C PG64-22
TON 261.000 $106.000 $120.000 $135.000 $100.000 $145.000 $215.000
D-GR HMA(SQ) TY-C SAC-A PG70-22
TON 160.000 $112.000 $130.000 $155.000 $105.000 $150.000 $207.000
CONC PVMT (CONT REINF - CRCP) (13")
SY 1,190.000 $154.000 $200.000 $106.000 $90.000 $80.000 $225.000
STRUCT EXCAV (BOX)
CY 90.000 $8.000 $1.000 $3.000 $35.000 $25.000 $25.000
CEM STABIL BKFL
CY 112.000 $150.000 $250.000 $201.000 $148.000 $220.000 $313.000
TRENCH EXCAVATION PROTECTION
LF 50.000 $5.000 $5.000 $12.500 $50.000 $8.000 $1.300
DRILL SHAFT (24 IN)
LF 39.000 $160.000 $275.000 $315.000 $250.000 $275.000 $150.000
DRILL SHAFT (30 IN)
LF 512.000 $213.000 $250.000 $300.000 $265.000 $345.000 $450.000
DRILL SHAFT (36 IN)
LF 640.000 $228.000 $275.000 $325.000 $275.000 $400.000 $450.000
CL C CONC (ABUT)(HPC)
CY 68.000 $895.000 $900.000 $940.000 $900.000 $1,250.000 $2,100.000
CL C CONC (CAP)(HPC)
CY 69.200 $1,850.000 $1,500.000 $1,850.000 $900.000 $1,800.000 $2,500.000
CL C CONC (COLUMN)(HPC)
CY 79.500 $970.000 $800.000 $2,200.000 $900.000 $1,600.000 $1,800.000
REINF CONC SLAB (BOX BEAM)(HPC)
SF 15,600.000 $13.300 $12.500 $11.600 $16.000 $15.000 $16.500
APPROACH SLAB (HPC)
CY 145.600 $480.000 $550.000 $520.000 $380.000 $600.000 $1,200.000
SHEAR KEY
CY 64.800 $325.000 $400.000 $450.000 $280.000 $500.000 $800.000
PRESTR CONC BOX BEAM (5B20)
LF 3,096.000 $185.000 $185.000 $220.000 $192.000 $210.000 $250.000
OPAQUE SEALER FINISH
SF 46,376.000 $0.400 $0.300 $0.330 $0.750 $0.750 $0.400
PENETRATING CONCRETE SURFACE TREATMENT
SY 1,896.000 $13.000 $6.500 $5.400 $10.000 $10.000 $9.250
RIPRAP (CONC)(4 IN)
CY 259.000 $510.000 $600.000 $580.000 $390.000 $475.000 $880.000
RAIL (TY SSTR)(HPC)
LF 844.000 $45.000 $85.000 $115.000 $60.000 $90.000 $150.000
RAIL (HANDRAIL)(TY D)
LF 119.000 $125.000 $115.000 $130.000 $120.000 $140.000 $200.000
ARMOR JOINT (SEALED)
LF 144.000 $80.000 $95.000 $80.000 $90.000 $95.000 $250.000
CONC BOX CULV (6 FT X 3 FT)
LF 88.000 $300.000 $450.000 $400.000 $400.000 $455.000 $1,050.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $12,000.000 $9,000.000 $15,000.000 $4,500.000 $7,890.000 $8,000.000
REMOV STR (WINGWALL)
EA 2.000 $1,500.000 $1,200.000 $1,000.000 $500.000 $1,200.000 $2,800.000
REMOV STR (BOX CULVERT)
LF 49.000 $70.000 $65.000 $100.000 $120.000 $60.000 $230.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $28,000.000 $35,000.000 $40,000.000 $95,000.000 $90,000.000 $85,000.000
MOBILIZATION
LS 1.000 $300,000.000 $350,000.000 $500,000.000 $550,000.000 $710,000.000 $860,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $9,500.000 $8,000.000 $13,000.000 $14,000.000 $15,000.000 $25,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 225.000 $30.000 $65.000 $50.000 $20.000 $32.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 225.000 $9.000 $15.000 $15.500 $5.000 $8.500 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 240.000 $21.500 $32.000 $42.000 $40.000 $20.000 $27.000
CONSTRUCTION EXITS (REMOVE)
SY 240.000 $8.000 $9.000 $6.600 $7.000 $7.000 $9.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,084.000 $2.750 $2.750 $2.000 $2.500 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,084.000 $1.000 $1.000 $0.670 $1.000 $1.000 $1.250
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 380.000 $8.000 $10.000 $6.500 $4.000 $6.000 $5.400
BIODEG EROSN CONT LOGS (REMOVE)
LF 380.000 $1.500 $1.500 $1.600 $1.000 $1.000 $1.250
CONSTRUCTING DETOURS
SY 13,678.000 $49.000 $55.000 $65.000 $60.000 $60.000 $80.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 14,760.000 $70.000 $72.000 $56.000 $76.000 $90.000 $95.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 280.000 $75.000 $100.000 $50.000 $85.000 $82.000 $110.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 100.000 $67.000 $100.000 $100.000 $83.000 $92.000 $128.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 13,950.000 $5.000 $2.000 $1.000 $5.000 $8.500 $8.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 240.000 $5.250 $9.000 $6.500 $10.000 $7.500 $11.500
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 80.000 $9.250 $10.000 $11.000 $12.000 $7.500 $17.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 14,760.000 $9.000 $3.000 $5.200 $9.000 $12.000 $11.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 280.000 $13.500 $20.000 $10.500 $15.000 $10.000 $18.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 100.000 $10.200 $20.000 $16.250 $15.000 $10.000 $42.000
CONC CURB & GUTTER (TY II)
LF 1,052.000 $17.000 $20.000 $21.000 $16.000 $20.000 $41.250
CONC SIDEWALKS (4")
SY 411.000 $50.000 $60.000 $50.000 $35.000 $60.000 $98.000
CURB RAMPS (TY 10)
EA 4.000 $1,950.000 $1,500.000 $2,200.000 $1,200.000 $2,000.000 $3,300.000
MTL W-BEAM GD FEN (STEEL POST)
LF 4,650.000 $22.000 $23.000 $36.000 $32.000 $32.000 $32.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,803.000 $2,500.000 $3,000.000 $3,000.000 $2,300.000 $2,400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,066.000 $1,400.000 $1,800.000 $2,300.000 $1,100.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 4,885.000 $3.250 $4.000 $17.000 $2.500 $4.000 $3.500
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $218.000 $320.000 $600.000 $500.000 $300.000 $300.000
REMOVE CABLE BARRIER
LF 3,889.000 $10.000 $5.000 $14.000 $4.000 $8.000 $6.800
REMOVE CABLE BARRIER TERMINAL SECTION
EA 4.000 $2,500.000 $800.000 $1,400.000 $800.000 $1,500.000 $1,360.000
INSTALL SALVAGE CABLE BARRIER
LF 3,878.000 $11.000 $12.000 $16.000 $10.000 $13.000 $10.900
INSTALL SALVAGE CABLE BAR TERM SECTION
EA 4.000 $2,640.000 $3,750.000 $3,000.000 $1,800.000 $2,800.000 $3,100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,355.000 $2,800.000 $1,700.000 $2,200.000 $2,600.000 $3,400.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $272.000 $300.000 $1,300.000 $500.000 $400.000 $340.000
CRASH CUSH ATTEN (INSTL)
EA 5.000 $10,120.000 $8,000.000 $10,500.000 $25,000.000 $12,000.000 $9,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $1,545.000 $750.000 $1,800.000 $1,000.000 $2,000.000 $500.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $840.000 $750.000 $1,500.000 $500.000 $900.000 $330.000
REMOVE RD IL ASM (TRANS-BASE)
EA 3.000 $2,000.000 $1,800.000 $1,800.000 $2,000.000 $1,930.000 $400.000
IN RD IL AM (TY AL) 30S-8 (250W) S
EA 2.000 $2,800.000 $7,000.000 $7,500.000 $7,685.000 $7,686.000 $2,700.000
IN RD IL AM (TY SA) 40T-8 (250W) S
EA 4.000 $2,800.000 $5,500.000 $5,800.000 $6,000.000 $5,995.000 $3,600.000
CONDT (PVC) (SCH 40) (2")
LF 1,700.000 $20.000 $20.000 $21.000 $21.500 $21.450 $10.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 460.000 $30.000 $33.000 $34.000 $35.000 $35.000 $27.000
CONDT (RM) (2")
LF 80.000 $60.000 $60.000 $63.000 $66.000 $65.000 $36.000
ELEC CONDR (NO.8) BARE
LF 2,100.000 $2.000 $3.700 $4.000 $4.050 $4.000 $1.250
ELEC CONDR (NO.8) INSULATED
LF 4,200.000 $2.500 $3.700 $4.000 $4.050 $4.000 $1.500
GROUND BOX TY A (122311)W/APRON
EA 7.000 $1,100.000 $1,300.000 $1,300.000 $1,375.000 $1,375.000 $1,360.000
ALUMINUM SIGNS (TY A)
SF 42.000 $40.000 $33.000 $34.000 $35.200 $35.000 $34.000
ALUMINUM SIGNS (TY G)
SF 440.000 $35.000 $32.000 $33.000 $34.000 $33.500 $34.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $612.000 $675.000 $700.000 $738.000 $737.000 $720.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $620.000 $800.000 $825.000 $873.000 $850.000 $810.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 2.000 $750.000 $840.000 $860.000 $920.000 $900.000 $880.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $700.000 $1,000.000 $1,050.000 $1,080.000 $1,050.000 $950.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
EA 1.000 $1,200.000 $2,160.000 $2,300.000 $2,370.000 $2,250.000 $2,300.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 2.000 $800.000 $1,375.000 $1,450.000 $1,500.000 $1,450.000 $1,400.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,000.000 $2,500.000 $2,600.000 $2,700.000 $2,700.000 $2,800.000
REMOVE SM RD SN SUP&AM
EA 26.000 $150.000 $125.000 $130.000 $150.000 $135.000 $100.000
INSTALL LRSS (STRUCT STEEL)
LB 1,637.000 $8.000 $8.750 $9.000 $9.500 $9.250 $6.750
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 5.000 $50.000 $30.000 $43.000 $5.000 $52.500 $91.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 6.000 $30.000 $30.000 $37.000 $5.000 $33.750 $32.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
EA 41.000 $30.000 $35.000 $47.000 $5.000 $33.750 $31.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 6.000 $25.000 $30.000 $43.000 $5.000 $32.000 $28.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
EA 4.000 $25.000 $35.000 $49.000 $5.000 $33.000 $31.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 42.000 $3.000 $2.500 $2.600 $11.000 $11.000 $3.250
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 27,171.000 $1.200 $0.600 $0.600 $1.750 $1.800 $0.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 32,637.000 $1.200 $0.600 $0.600 $1.750 $1.800 $0.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,245.000 $1.000 $1.300 $1.350 $1.000 $0.700 $1.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 37.000 $5.000 $4.100 $4.300 $2.000 $1.000 $5.500
REFL PAV MRK TY II (W) 4" (BRK)
LF 3,890.000 $0.120 $0.250 $0.240 $0.700 $0.350 $0.300
REFL PAV MRK TY II (W) 4" (SLD)
LF 16,682.000 $0.120 $0.250 $0.240 $0.750 $0.350 $0.300
REFL PAV MRK TY II (W) 8" (SLD)
LF 5,245.000 $0.350 $0.450 $0.470 $0.900 $0.450 $0.600
REFL PAV MRK TY II (W) 24" (SLD)
LF 37.000 $2.500 $2.500 $2.400 $2.000 $0.750 $3.200
REFL PAV MRK TY II (Y) 4" (BRK)
LF 250.000 $0.200 $0.250 $0.240 $2.000 $0.400 $0.300
REFL PAV MRK TY II (Y) 4" (SLD)
LF 16,320.000 $0.120 $0.250 $0.240 $1.000 $0.400 $0.300
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,890.000 $0.500 $0.700 $0.700 $0.800 $0.500 $0.900
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 16,682.000 $0.500 $0.700 $0.700 $0.900 $0.500 $0.900
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 250.000 $0.500 $0.700 $0.700 $3.000 $1.500 $0.900
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 16,320.000 $0.500 $0.700 $0.700 $1.000 $0.500 $0.900
REFL PAV MRKR TY II-A-A
EA 13.000 $3.000 $3.750 $3.750 $10.000 $8.000 $4.750
REFL PAV MRKR TY II-C-R
EA 457.000 $3.250 $3.750 $3.750 $4.500 $4.150 $4.750
ELIM EXT PAV MRK & MRKS (4")
LF 33,793.000 $0.500 $0.500 $0.480 $0.800 $0.750 $0.500
ELIM EXT PAV MRK & MRKS (8")
LF 1,444.000 $0.750 $0.950 $0.950 $1.750 $1.700 $1.200
PAV SURF PREP FOR MRK (4")
LF 37,142.000 $0.100 $0.150 $0.120 $0.500 $0.300 $0.150
PAV SURF PREP FOR MRK (8")
LF 5,245.000 $0.300 $0.250 $0.250 $0.750 $0.300 $0.300
PAV SURF PREP FOR MRK (24")
LF 37.000 $0.800 $2.250 $2.300 $5.000 $3.400 $2.250
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 46,376.000 $1.000 $0.800 $0.900 $1.500 $1.200 $0.750
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 151.100 $60.000 $130.000 $125.000 $100.000 $80.000 $120.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $10,160.000 $8,000.000 $4,000.000 $18,000.000 $15,000.000 $12,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 320.000 $3.000 $20.000 $21.000 $135.000 $137.500 $20.000
MODULAR GLARE SCREENS (FURN & INSTALL)
LF 6,405.000 $14.000 $15.000 $20.000 $14.500 $15.000 $13.000
MODULAR GLARE SCREENS (REMOVE)
LF 6,405.000 $2.500 $1.000 $2.400 $1.000 $2.000 $0.700
MODULAR GLARE SCREENS (MOVE)
LF 500.000 $2.000 $3.000 $6.300 $8.000 $3.000 $3.500
TMA (STATIONARY)
EA 2.000 $5,000.000 $10,000.000 $19,000.000 $22,000.000 $15,500.000 $53,000.000
TMA (MOBILE OPERATION)
HR 40.000 $40.000 $50.000 $48.000 $150.000 $90.000 $100.000
Totals: $5,465,089.590 $5,693,876.600 $6,222,253.270 $6,415,479.350 $7,235,944.300 $8,699,582.450