REMOVING CONC (MISC)
|
SY
|
119.000
|
$75.000
|
$30.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
578.000
|
$20.000
|
$12.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
113.000
|
$40.000
|
$25.000
|
|
|
D-GR HMA(SQ) TY-D SAC-B PG64-22
|
TON
|
118.000
|
$140.000
|
$160.000
|
|
|
PLANE ASPH CONC PAV (1.5"-2")
|
SY
|
1,272.000
|
$4.000
|
$8.000
|
|
|
CUT & RESTORING PAV
|
SY
|
668.000
|
$75.000
|
$75.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
25.000
|
$100.000
|
$310.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
540.000
|
$140.000
|
$150.000
|
|
|
CL C CONC (CAP)
|
CY
|
22.000
|
$800.000
|
$1,400.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
4.000
|
$750.000
|
$1,200.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
54.000
|
$405.000
|
$260.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
232.000
|
$500.000
|
$460.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
281.000
|
$435.000
|
$630.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
372.000
|
$100.000
|
$290.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
227.300
|
$375.000
|
$435.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
772.000
|
$25.000
|
$43.000
|
|
|
RAIL (TY SSTR)
|
LF
|
104.000
|
$100.000
|
$185.000
|
|
|
RETROFIT RAIL (ADD HSS)
|
LF
|
122.000
|
$60.000
|
$50.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
48.000
|
$100.000
|
$95.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$1,250.000
|
$1,250.000
|
|
|
REMOV STR (PIPE)
|
LF
|
64.000
|
$20.000
|
$12.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$75,000.000
|
$15,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$4,500.000
|
$5,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
620.000
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
620.000
|
$2.500
|
$1.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 2)
|
LF
|
1,140.000
|
$25.000
|
$22.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 2)
|
LF
|
1,140.000
|
$20.000
|
$15.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 2)
|
LF
|
1,140.000
|
$25.000
|
$22.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,150.000
|
$17.500
|
$24.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$1,500.000
|
$2,450.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,000.000
|
$1,500.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
12.000
|
$900.000
|
$600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,602.000
|
$2.250
|
$3.500
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$100.000
|
$325.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$200.000
|
$325.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
16.000
|
$500.000
|
$550.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY I)
|
EA
|
16.000
|
$2,500.000
|
$3,100.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$3,000.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,000.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$2,000.000
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
40.000
|
$50.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
48.000
|
$25.000
|
$15.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
80.000
|
$1.000
|
$5.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
840.000
|
$1.000
|
$4.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
150.000
|
$1.000
|
$5.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
360.000
|
$1.000
|
$4.500
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
4.000
|
$700.000
|
$1,500.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
300.000
|
$10.000
|
$30.000
|
|
|
RAISE RAIL ELEMENT
|
LF
|
200.000
|
$5.000
|
$16.000
|
|
|
CONC RAIL REPAIR(REMOVE AND REPL RAIL)
|
LF
|
8.000
|
$500.000
|
$495.000
|
|
|
CONCRETE BEAM REPAIR (CFRP)
|
EA
|
2.000
|
$18,000.000
|
$17,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$200.000
|
$400.000
|
|
Totals: |
$1,054,565.000
|
$1,227,643.500
|