Show Job Controls
Bid Cobra

HIDALGO FM0088 (6318-30-001)

Items: 52

County: HIDALGO
Length: N/A
Highway: FM0088
District: PHARR
Control Number: 6318-30-001
DBE Goal: N/A
Project: BPM - 631830001
Guaranty: N/A
Time: 140 W
Engineer's Estimate: $1,054,565.00
Date: 02/05/2019 (7 years ago)
Contract Number: N/A
Type: BRIDGE PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$1,054,565.00
$1,227,643.50
Over/Under Est: 16.41% $173,078.50

Bid Items & Bid Tabulations

52 Total 0 of 52
HIDALGO  |  FM0088  |  PHARR  |  6318-30-001  |  02/05/2019  |  $1,054,565.00  |  BPM - 631830001  |  BRIDGE PREVENT MAINT  |  140 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
VALLEY INFRASTRUCTURE, INC.
REMOVING CONC (MISC)
SY 119.000 $75.000 $30.000
EXCAVATION (CHANNEL)
CY 578.000 $20.000 $12.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 113.000 $40.000 $25.000
D-GR HMA(SQ) TY-D SAC-B PG64-22
TON 118.000 $140.000 $160.000
PLANE ASPH CONC PAV (1.5"-2")
SY 1,272.000 $4.000 $8.000
CUT & RESTORING PAV
SY 668.000 $75.000 $75.000
FLOWABLE BACKFILL
CY 25.000 $100.000 $310.000
PRESTR CONC PIL (18 IN SQ)
LF 540.000 $140.000 $150.000
CL C CONC (CAP)
CY 22.000 $800.000 $1,400.000
CL C CONC (COLLAR)
EA 4.000 $750.000 $1,200.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 54.000 $405.000 $260.000
RIPRAP (CONC)(4 IN)
CY 232.000 $500.000 $460.000
RIPRAP (CONC)(5 IN)
CY 281.000 $435.000 $630.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 372.000 $100.000 $290.000
RIPRAP (MOW STRIP)(4 IN)
CY 227.300 $375.000 $435.000
CLEANING AND SEALING EXISTING JOINTS
LF 772.000 $25.000 $43.000
RAIL (TY SSTR)
LF 104.000 $100.000 $185.000
RETROFIT RAIL (ADD HSS)
LF 122.000 $60.000 $50.000
RC PIPE (CL III)(24 IN)
LF 48.000 $100.000 $95.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 8.000 $1,250.000 $1,250.000
REMOV STR (PIPE)
LF 64.000 $20.000 $12.000
MOBILIZATION
LS 1.000 $75,000.000 $15,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $4,500.000 $5,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 620.000 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 620.000 $2.500 $1.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 2)
LF 1,140.000 $25.000 $22.000
PORT CTB (MOVE)(SGL SLP)(TY 2)
LF 1,140.000 $20.000 $15.000
PORT CTB (STKPL)(SGL SLP)(TY 2)
LF 1,140.000 $25.000 $22.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,150.000 $17.500 $24.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $1,500.000 $2,450.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,000.000 $1,500.000
MTL BM GD FEN TRANS (NON - SYM)
EA 12.000 $900.000 $600.000
REMOVE METAL BEAM GUARD FENCE
LF 5,602.000 $2.250 $3.500
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $100.000 $325.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $200.000 $325.000
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $500.000 $550.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 16.000 $2,500.000 $3,100.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $3,000.000 $3,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $2,000.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $2,000.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 40.000 $50.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 48.000 $25.000 $15.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 80.000 $1.000 $5.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 840.000 $1.000 $4.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 150.000 $1.000 $5.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 360.000 $1.000 $4.500
TREE REMOVAL (12" - 18" DIA)
EA 4.000 $700.000 $1,500.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 300.000 $10.000 $30.000
RAISE RAIL ELEMENT
LF 200.000 $5.000 $16.000
CONC RAIL REPAIR(REMOVE AND REPL RAIL)
LF 8.000 $500.000 $495.000
CONCRETE BEAM REPAIR (CFRP)
EA 2.000 $18,000.000 $17,000.000
TMA (STATIONARY)
DAY 40.000 $200.000 $400.000
Totals: $1,054,565.000 $1,227,643.500