HIDALGO FM 491 (0861-01-071)

Items: 126

County: HIDALGO
Length: 0.0000 MILES
Highway: FM 491
District: PHARR
Control Number: 0861-01-071
DBE Goal: 0.0%
Project: STP 2B25(076)HRR
Guaranty: $100,000.00
Time: 253 WORKING DAYS
Engineer's Estimate: $8,600,026.71
Date: 06/02/2026 (8 days ago)
Contract Number: 6263006
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00193114
Contract Type: Federal
Project Description: CONSTRUCT PAVED SHOULDERS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JESUS NORIEGA
ARLEENE GARCIA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$8,600,026.71
$7,675,891.43
Over/Under Est: -10.75% -$924,135.28
$8,162,839.91
Over/Under Est: -5.08% -$437,186.80
Amt Left: 6.34% $486,948.48
Over/Under Est: -1.65% -$142,022.46
Amt Left: 10.19% $782,112.82
Delta: -3.62% -$295,164.34
Over/Under Est: 0.42% $35,735.73
Amt Left: 12.51% $959,871.01
Delta: -2.10% -$177,758.19
$9,244,602.30
Over/Under Est: 7.5% $644,575.59
Amt Left: 20.44% $1,568,710.87
Delta: -7.05% -$608,839.86
$9,286,973.83
Over/Under Est: 7.99% $686,947.12
Amt Left: 20.99% $1,611,082.40
Delta: -0.46% -$42,371.53
$9,743,825.64
Over/Under Est: 13.3% $1,143,798.93
Amt Left: 26.94% $2,067,934.21
Delta: -4.92% -$456,851.81

Bid Items & Bid Tabulations

126 Total 0 of 126
HIDALGO  |  FM 491  |  PHARR  |  0861-01-071  |  06/02/2026  |  $8,600,026.71  |  STP 2B25(076)HRR  |  HAZARD ELIM & SAFETY  |  253 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
IOC COMPANY, LLC
TEXAS CORDIA CONSTRUCTION, LLC
REIM CONSTRUCTION, INC.
CK NEWBERRY, LLC
EARTHWORKS ENTERPRISE
3LW CIVIL LLC
PREPARING ROW
STA 160.000 $1,500.000 $2,000.000 $4,000.000 $2,000.000 $3,250.000 $300.000 $425.000 $1,766.607
REMOV CONC (DRIVEWAYS)
SY 38.000 $13.140 $23.470 $55.000 $30.000 $23.150 $100.000 $13.500 $23.159
RMV (4") TRT/UNTRT BASE & ASPH PAV
SY 37,354.000 $12.000 $0.320 $3.000 $4.000 $3.100 $2.250 $3.750 $1.071
OBLITERATING ABANDONED ROAD
SY 5,167.000 $4.000 $2.150 $5.000 $2.000 $4.300 $2.250 $5.500 $4.676
EXCAV (ROADWAY)
CY 5,257.000 $7.000 $18.720 $45.000 $2.000 $8.650 $12.000 $14.000 $11.996
EMBANK (FNL)(DC)(TY C)
CY 30,703.000 $5.920 $18.200 $1.000 $12.000 $15.500 $22.000 $18.000 $26.826
BACKFILL (TY A)
STA 160.000 $328.160 $152.560 $175.000 $180.000 $262.000 $125.000 $156.000 $61.034
FURN & PLACE TOPSOIL (VEH)
CY 50.000 $32.500 $28.290 $15.000 $50.000 $43.250 $55.000 $35.000 $110.427
HYDRO MULCH SEED (PERM_RURAL_CLAY)
SY 69,321.000 $0.450 $0.450 $0.440 $0.500 $0.500 $0.550 $0.750 $0.666
HYDRO MULCH SEED (TEMP_WARM)
SY 69,321.000 $0.400 $0.280 $0.270 $0.500 $0.310 $0.500 $0.750 $0.654
VEGETATIVE WATERING
TGL 1,509.000 $30.310 $59.590 $35.000 $25.000 $31.600 $25.000 $9.000 $83.300
SPRINKLING (DUST CONTROL)
TGL 637.000 $10.190 $1.000 $1.000 $30.000 $31.600 $30.000 $9.000 $51.370
PROOF ROLLING
HR 12.810 $40.250 $89.220 $10.000 $50.000 $59.700 $80.000 $93.000 $49.220
FL BS (RDWY DEL)(TY E GR 4)(FNL POS)
CY 17,182.000 $55.000 $31.480 $38.000 $55.000 $38.650 $42.000 $53.000 $53.693
LIME (COM OR QK)(SLURRY)
TON 1,288.000 $215.500 $250.710 $210.000 $300.000 $337.000 $350.000 $386.000 $341.016
LIME TRT (EXIST MATL)(12")
SY 65,053.000 $3.250 $3.260 $2.500 $3.000 $2.000 $3.500 $4.250 $3.524
CEMENT
TON 578.000 $190.000 $177.210 $200.000 $200.000 $206.000 $200.000 $213.000 $231.466
CEMENT TRT (NEW BASE)(10")
SY 61,851.000 $2.500 $3.790 $2.500 $3.000 $1.900 $2.000 $3.000 $3.177
SALV,HAUL & STKPL RCL ASPH PV (1 TO 3")
SY 34,905.000 $3.500 $1.340 $1.000 $5.000 $3.350 $1.500 $2.750 $5.664
PRIME COAT (MC-30)
GAL 12,081.000 $6.260 $6.380 $5.000 $8.000 $7.000 $6.500 $7.150 $9.520
ASPH (TIER II)
GAL 17,595.000 $5.290 $6.820 $5.000 $7.000 $4.300 $4.750 $6.000 $9.694
AGGR (TY-D GR-4P) (SAC B)
CY 467.000 $186.100 $74.990 $75.000 $170.000 $87.750 $175.000 $159.250 $211.738
SP MIXES SP-D SAC-A PG76-22
TON 10,310.000 $124.100 $113.860 $150.000 $130.000 $140.000 $145.000 $152.250 $140.841
PLANE & TEXT ASPH CONC PAV(1.5")
SY 2,909.000 $4.310 $4.110 $5.000 $5.000 $2.250 $5.000 $1.750 $2.760
STRUCT EXCAV (SPECIAL)
CY 152.000 $86.250 $95.950 $100.000 $90.000 $84.300 $150.000 $106.750 $103.411
CUT & RESTORE ASPH PAVING
SY 152.000 $70.420 $101.000 $100.000 $120.000 $70.000 $55.000 $38.000 $122.036
CEM STABIL BKFL
CY 309.000 $68.910 $80.800 $100.000 $300.000 $76.450 $200.000 $81.250 $191.352
TRENCH EXCAVATION PROTECTION
LF 409.000 $4.250 $1.010 $5.000 $20.000 $3.750 $15.000 $2.500 $5.950
TEMPORARY SPL SHORING
SF 3,750.000 $10.000 $0.010 $3.000 $30.000 $68.300 $30.000 $98.000 $7.514
SHEET PILING (PZ - 27)
SF 6,556.000 $71.950 $52.000 $58.000 $70.000 $83.000 $85.000 $111.250 $81.434
DRILL SHAFT (24 IN)
LF 1,360.000 $259.650 $404.000 $360.000 $330.000 $493.000 $375.000 $408.250 $462.373
CL C CONC (ABUT)
CY 22.600 $1,743.600 $2,828.000 $2,025.000 $1,190.000 $1,300.000 $1,500.000 $2,136.000 $1,409.458
CL C CONC (CAP)
CY 34.400 $2,139.500 $4,646.000 $4,200.000 $2,300.000 $1,860.000 $3,000.000 $4,786.000 $1,425.909
CL C CONC (COLUMN)
CY 13.900 $1,459.450 $5,050.000 $1,200.000 $2,010.000 $3,260.000 $5,000.000 $2,121.000 $1,320.722
REINF CONC SLAB (SLAB BEAM)
SF 5,851.000 $56.000 $23.230 $25.000 $50.000 $27.100 $25.000 $32.750 $21.543
PRESTR CONC SLAB BEAM (4SB12)
LF 1,005.000 $350.000 $272.700 $225.000 $330.000 $236.000 $275.000 $280.250 $199.598
PRESTR CONC SLAB BEAM (5SB12)
LF 335.000 $245.760 $272.700 $275.000 $340.000 $236.000 $300.000 $284.750 $230.777
RIPRAP (CONC)(4 IN)
CY 164.000 $550.000 $409.050 $750.000 $650.000 $462.000 $675.000 $391.000 $566.545
RIPRAP (MOW STRIP)(4 IN)
CY 69.000 $735.030 $419.150 $750.000 $760.000 $671.000 $650.000 $391.000 $654.009
RIPRAP (STONE PROTECTION)(15 IN)
CY 32.000 $190.920 $328.250 $350.000 $280.000 $303.000 $450.000 $194.500 $328.926
ELASTOMERIC BEARING (PLAIN)
EA 120.000 $1,400.000 $1.010 $200.000 $470.000 $276.000 $35.000 $100.000 $0.011
RAIL (TY T223)
LF 364.000 $146.150 $191.900 $200.000 $500.000 $176.000 $200.000 $202.000 $142.908
ARMOR JOINT (SEALED)
LF 67.000 $154.320 $303.000 $175.000 $140.000 $173.000 $175.000 $195.000 $198.124
RC PIPE (CL III)(36 IN)
LF 36.000 $212.450 $363.600 $375.000 $220.000 $199.000 $220.000 $211.000 $294.729
RC PIPE (CL IV)(18 IN)
LF 342.000 $150.000 $212.100 $145.000 $90.000 $83.100 $105.000 $85.500 $164.346
RC PIPE (CL IV)(24 IN)
LF 208.000 $170.000 $242.400 $225.000 $130.000 $119.000 $150.000 $119.750 $163.077
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 18.000 $1,500.000 $909.000 $1,250.000 $1,230.000 $934.000 $2,200.000 $1,008.000 $1,005.229
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 31.000 $1,000.000 $1,111.000 $1,300.000 $1,360.000 $1,200.000 $2,200.000 $1,123.000 $1,148.894
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 5.000 $1,500.000 $1,161.500 $1,500.000 $1,560.000 $1,220.000 $2,500.000 $1,295.000 $1,222.169
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 5.000 $2,000.000 $1,191.800 $1,750.000 $1,560.000 $1,220.000 $2,500.000 $1,295.000 $1,275.302
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 10.000 $1,849.240 $1,616.000 $1,900.000 $1,760.000 $1,390.000 $2,800.000 $1,467.000 $1,624.690
SET (TY II) (18") (RCP) (4:1) (P)
EA 1.000 $1,350.000 $1,010.000 $2,900.000 $1,230.000 $867.000 $3,400.000 $1,008.000 $2,582.993
REMOV STR (SET)
EA 40.000 $437.540 $404.000 $400.000 $360.000 $246.000 $500.000 $167.750 $290.423
REMOV STR (PIPE)
LF 960.000 $13.800 $30.300 $20.000 $10.000 $11.850 $15.000 $12.250 $19.323
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $90,000.000 $118,170.000 $10,000.000 $99,460.000 $125,000.000 $325,000.000 $123,000.000 $227,237.235
MOBILIZATION
LS 1.000 $778,644.920 $500,000.000 $800,000.000 $361,500.000 $750,000.000 $925,000.000 $450,000.000 $883,529.970
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $2,350.000 $7,300.000 $2,500.000 $500.000 $2,940.000 $12,000.000 $3,255.000 $2,833.985
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $8,145.870 $20,000.000 $70.000 $5,750.000 $15,000.000 $31,206.000 $4,760.000
TMA (STATIONARY)
DAY 253.000 $109.830 $35.890 $1.000 $70.000 $28.700 $250.000 $207.000 $260.474
TMA (MOBILE OPERATION)
DAY 253.000 $196.640 $0.010 $1.000 $70.000 $115.000 $25.000 $303.000 $416.665
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 56.000 $52.020 $90.900 $90.000 $120.000 $65.100 $100.000 $97.500 $119.000
ROCK FILTER DAMS (REMOVE)
LF 56.000 $20.290 $48.230 $47.750 $90.000 $22.250 $50.000 $46.000 $53.550
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 468.000 $27.440 $22.180 $50.000 $20.000 $15.000 $25.000 $7.750 $65.450
CONSTRUCTION EXITS (REMOVE)
SY 468.000 $2.850 $13.760 $10.000 $9.000 $7.750 $10.000 $2.250 $23.800
FRNT END LOADER WORK (ERSN & SEDM CONT)
HR 24.000 $150.000 $95.860 $100.000 $200.000 $63.000 $125.000 $91.500 $79.730
TEMP SEDMT CONT FENCE (INSTALL)
LF 678.000 $6.280 $3.290 $6.000 $4.000 $3.850 $5.000 $5.000 $7.140
TEMP SEDMT CONT FENCE (REMOVE)
LF 678.000 $2.590 $2.380 $4.000 $1.000 $1.000 $2.000 $1.500 $3.570
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,181.000 $5.500 $5.610 $3.790 $6.000 $3.200 $8.000 $7.250 $9.520
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,181.000 $1.290 $1.170 $1.000 $1.000 $1.000 $2.000 $1.500 $2.380
DRIVEWAYS (CONC)
SY 249.000 $110.000 $94.860 $150.000 $110.000 $69.800 $150.000 $69.000 $81.491
DRIVEWAYS (ACP)
SY 1,232.000 $63.960 $51.100 $70.000 $40.000 $46.900 $60.000 $27.500 $74.059
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 31,738.000 $0.190 $0.140 $0.180 $0.250 $0.180 $0.150 $0.250 $0.178
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 15,319.000 $0.230 $0.200 $0.250 $0.250 $0.240 $0.250 $0.250 $0.249
MTL W-BEAM GD FEN (TIM POST)
LF 576.000 $32.170 $29.400 $29.950 $30.000 $34.000 $33.000 $34.500 $31.921
REMOVE METAL BEAM GUARD FENCE
LF 633.000 $6.790 $3.030 $3.000 $4.000 $3.000 $3.000 $3.500 $4.777
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $206.050 $4.040 $600.000 $920.000 $210.000 $625.000 $688.500 $366.693
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $4,590.910 $3,509.750 $3,878.000 $3,880.000 $3,920.000 $4,000.000 $4,449.750 $3,132.773
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $1,475.000 $333.300 $300.000 $580.000 $265.000 $325.000 $344.250 $733.386
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 4.000 $34,250.000 $30,441.400 $29,000.000 $25,630.000 $25,500.000 $25,000.000 $33,274.750 $25,377.790
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 5.000 $210.000 $237.350 $275.000 $910.000 $307.000 $275.000 $401.750 $327.250
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 19.000 $796.930 $813.050 $725.000 $870.000 $801.000 $725.000 $975.500 $862.750
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 9.000 $847.730 $883.750 $975.000 $1,020.000 $1,080.000 $975.000 $1,091.000 $1,160.250
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 8.000 $962.580 $979.700 $1,050.000 $1,090.000 $1,160.000 $1,050.000 $1,205.000 $1,249.500
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,162.500 $1,222.100 $1,350.000 $1,310.000 $1,490.000 $1,350.000 $1,435.000 $1,606.500
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,275.000 $1,555.400 $1,600.000 $1,770.000 $1,840.000 $1,600.000 $1,547.450 $1,904.000
REMOVE SM RD SN SUP&AM
EA 26.000 $75.000 $132.120 $65.000 $280.000 $71.750 $100.000 $229.500 $77.350
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 27.000 $32.500 $30.300 $65.000 $220.000 $71.750 $75.000 $28.750 $77.350
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 12.000 $20.000 $24.240 $45.000 $210.000 $49.700 $50.000 $17.250 $53.550
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 14.000 $85.000 $64.640 $95.000 $240.000 $105.000 $100.000 $86.250 $113.050
REMOVE DELIN & OBJECT MARKER ASSMS
EA 30.000 $20.000 $18.690 $10.000 $100.000 $11.050 $10.000 $11.500 $11.900
INSTL OM SM RD SIGN (1-OM-PW)R
EA 9.000 $28.640 $35.350 $35.000 $640.000 $39.000 $35.000 $17.250 $41.650
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 22,019.000 $0.540 $0.490 $0.480 $0.500 $0.520 $0.500 $0.750 $0.856
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 400.000 $2.000 $1.520 $1.500 $2.000 $1.650 $1.500 $1.750 $1.428
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 45.000 $10.200 $16.160 $16.000 $20.000 $17.650 $17.000 $12.750 $9.520
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 1,128.000 $0.320 $0.790 $0.780 $1.000 $0.870 $1.000 $1.000 $0.856
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 16,892.000 $0.540 $0.490 $0.480 $0.500 $0.540 $0.500 $0.750 $0.856
WK ZN PAV MRK NON-REMOV (Y)12"(SLD)
LF 260.000 $1.780 $2.020 $2.000 $2.000 $2.200 $2.000 $3.500 $4.760
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 20.000 $4.150 $3.540 $3.500 $4.000 $3.850 $5.000 $5.500 $6.545
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 244.000 $4.200 $3.540 $3.500 $4.000 $3.850 $5.000 $5.500 $6.545
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 11,370.000 $0.730 $0.390 $0.380 $0.400 $0.430 $0.400 $0.750 $1.190
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 11,370.000 $0.720 $0.390 $0.380 $0.400 $0.430 $0.400 $0.750 $1.190
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 30.000 $1.000 $1.250 $9.170 $5.000 $1.400 $2.000 $0.750 $29.750
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,220.000 $1.900 $1.250 $1.880 $5.000 $2.200 $2.000 $0.750 $4.165
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 400.000 $1.060 $2.020 $2.000 $2.000 $2.200 $2.000 $3.000 $1.487
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 100.000 $7.620 $16.160 $16.000 $20.000 $17.650 $16.000 $11.250 $16.660
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 335.000 $3.510 $3.540 $3.500 $4.000 $3.850 $3.500 $4.750 $8.330
RE PM TY III (W)(6")(SLD)
LF 340.000 $1.030 $15.150 $15.000 $20.000 $16.550 $15.000 $4.500 $11.900
RE PM TY III (Y)(6")(SLD)
LF 170.000 $1.100 $20.200 $20.000 $20.000 $22.100 $20.000 $4.500 $11.900
RE PM TY III (Y)(6")(BRK)
LF 40.000 $1.820 $25.250 $25.000 $30.000 $27.600 $25.000 $4.500 $11.900
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 33,146.000 $0.600 $0.670 $0.660 $1.000 $0.750 $0.750 $0.750 $0.856
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 3,410.000 $0.690 $1.120 $1.100 $1.000 $1.200 $1.200 $1.000 $0.856
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 12,954.000 $0.650 $0.850 $0.840 $1.000 $0.950 $1.000 $1.000 $0.856
PREFAB PM TY C (W)(ARROW)
EA 2.000 $283.530 $151.500 $150.000 $150.000 $166.000 $150.000 $276.000 $416.500
PREFAB PM TY C (W)(WORD)
EA 2.000 $309.800 $277.750 $275.000 $280.000 $304.000 $275.000 $276.000 $476.000
REFL PAV MRKR TY I-C
EA 20.000 $3.910 $35.350 $35.000 $40.000 $39.000 $35.000 $8.250 $6.545
REFL PAV MRKR TY II-A-A
EA 463.000 $3.570 $7.580 $7.500 $8.000 $8.300 $8.000 $5.000 $6.545
ELIM EXT PM & MRKS (6")
LF 14,080.000 $0.500 $0.360 $0.350 $0.350 $0.410 $0.350 $0.750 $0.654
PRSSR IRRIG PVC PIPE (18")
LF 60.000 $128.970 $454.500 $400.000 $210.000 $111.000 $225.000 $132.000 $142.868
PRSSR IRRIG PVC PIPE (30")
LF 60.000 $235.000 $909.000 $1,100.000 $850.000 $448.000 $260.000 $264.000 $224.145
BONDING COURSE
GAL 4,335.000 $6.720 $2.570 $4.000 $7.000 $2.800 $4.500 $5.000 $10.710
BIRD EXCLUSION METHOD
SF 5,858.000 $8.430 $10.100 $2.110 $4.000 $1.050 $7.000 $4.250 $3.251
1
RC PIPE (CL III)(18 IN)
LF 620.000 $100.000 $0.000 $145.000 $0.000 $0.000 $0.000 $0.000 $0.000
1A
THERMOPLASTIC PIPE (PP) (18")
LF 620.000 $100.000 $33.330 $0.000 $40.000 $49.150 $65.000 $49.000 $77.350
2
RC PIPE (CL III)(24 IN)
LF 332.000 $160.000 $0.000 $150.000 $0.000 $0.000 $0.000 $0.000 $0.000
2A
RC PIPE (CL III)(24 IN)
LF 36.000 $160.000 $212.100 $0.000 $100.000 $95.350 $125.000 $92.500 $160.295
2A
THERMOPLASTIC PIPE (PP) (24")
LF 296.000 $160.000 $58.580 $0.000 $60.000 $64.650 $85.000 $72.000 $74.970
Totals: $8,715,146.708 $7,675,891.428 $8,162,839.910 $8,458,004.250 $8,635,762.437 $9,244,602.300 $9,286,973.830 $9,743,825.631
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $77,864.49
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $155,728.98
Total: $233,593.47