HIDALGO FM 681 (0669-01-049)

Items: 103

County: HIDALGO
Length: N/A
Highway: FM 681
District: PHARR
Control Number: 0669-01-049
DBE Goal: N/A
Project: STP 2017(317)
Guaranty: N/A
Time: 576 WORKING DAYS
Engineer's Estimate: $10,796,893.48
Date: 12/01/2016 (9 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$10,796,893.48
1
Awarded
$8,889,677.69
Over/Under Est: -17.66% -$1,907,215.79
$9,529,352.68
Over/Under Est: -11.74% -$1,267,540.80
Amt Left: 7.2% $639,674.99
$9,827,711.97
Over/Under Est: -8.98% -$969,181.51
Amt Left: 10.55% $938,034.28
Delta: -3.13% -$298,359.29
$9,841,438.26
Over/Under Est: -8.85% -$955,455.22
Amt Left: 10.71% $951,760.57
Delta: -0.14% -$13,726.29
$10,608,497.67
Over/Under Est: -1.74% -$188,395.81
Amt Left: 19.34% $1,718,819.98
Delta: -7.79% -$767,059.41
Over/Under Est: 12.43% $1,342,137.50
Amt Left: 36.55% $3,249,353.29
Delta: -14.43% -$1,530,533.31

Bid Items & Bid Tabulations

103 Total 0 of 103
HIDALGO  |  FM 681  |  PHARR  |  0669-01-049  |  12/01/2016  |  $10,796,893.48  |  STP 2017(317)  |  REHAB OF EXIST ROADWAY  |  576 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
ASAGO, LLC
FOREMOST PAVING, INC.
TEXAS SAI, INC.
IOC COMPANY, LLC
REIM CONSTRUCTION, INC.
ANDERSON COLUMBIA CO., INC.
PREPARING ROW
STA 433.400 $800.000 $192.850 $2,000.000 $90.180 $99.670 $188.000 $300.000
REMOVING CONC (RIPRAP)
SY 61.400 $18.600 $10.480 $10.000 $28.220 $10.240 $10.000 $12.000
REMOVING STAB BASE & ASPH PAV (4"-22")
SY 195,070.000 $3.000 $0.800 $0.200 $2.600 $4.000 $2.950 $2.000
EXCAVATION (ROADWAY)
CY 60,144.000 $3.750 $3.410 $3.000 $4.390 $2.440 $2.050 $5.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 101,225.000 $4.750 $4.660 $3.500 $5.560 $6.000 $11.250 $5.500
FURNISHING AND PLACING TOPSOIL
CY 50.000 $25.000 $41.250 $25.000 $75.000 $23.830 $33.500 $30.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 212,045.000 $0.180 $0.240 $0.250 $0.240 $0.220 $0.270 $0.250
DRILL SEEDING (TEMP) (WARM)
SY 212,045.000 $0.100 $0.130 $0.250 $0.130 $0.120 $0.200 $0.200
VEGETATIVE WATERING
MG 3,973.000 $18.000 $12.860 $23.000 $14.100 $20.570 $25.500 $30.000
SPRINKLING (DUST CONTROL)
MG 1,733.600 $10.000 $13.810 $1.000 $11.360 $17.460 $12.750 $6.000
PROOF ROLLING
HR 90.000 $60.000 $33.690 $50.000 $51.790 $72.600 $54.500 $93.000
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 29,108.000 $20.000 $18.570 $15.000 $15.550 $17.000 $17.000 $29.000
RWRK BS MTL(TY B)(6")(DEN CNT)(ORG POS)
CY 30,942.000 $6.000 $3.130 $4.000 $11.790 $4.700 $6.200 $9.000
CEMENT
TON 1,974.690 $152.000 $145.200 $155.000 $180.000 $165.000 $156.000 $160.000
CEMENT TRT (MX EXST MTL & NW BS)(10")
SY 210,633.190 $2.000 $1.650 $1.200 $2.000 $1.800 $1.700 $4.600
ASPHALT STAB BASE (GR 4)(PG 64)
TON 28,208.600 $55.000 $54.170 $54.000 $50.610 $50.000 $61.000 $60.000
SALV, HAUL & STKPL RCL APH PV (2"-6")
SY 35,100.000 $2.500 $0.290 $3.000 $2.170 $3.150 $2.950 $3.000
PRIME COAT (MC-30)
GAL 44,125.680 $3.000 $3.610 $3.500 $5.360 $3.330 $3.350 $3.250
D-GR HMA TY-D SAC-A PG76-22
TON 18,495.020 $72.000 $71.990 $69.000 $69.500 $73.680 $78.000 $73.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 1,072.000 $2.250 $5.370 $5.000 $6.530 $3.920 $1.450 $13.000
CEM STABIL BKFL
CY 227.370 $55.000 $108.380 $55.000 $38.820 $66.420 $54.500 $72.000
CUT & RESTORING PAV
SY 434.320 $70.250 $43.200 $50.000 $46.760 $86.970 $49.250 $75.000
TRENCH EXCAVATION PROTECTION
LF 25.000 $2.500 $28.600 $29.000 $11.410 $3.380 $52.000 $10.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 52.000 $221.000 $258.500 $265.000 $265.000 $265.000 $296.000 $250.000
CL C CONC (RAC-R)
CY 13.410 $3,080.000 $553.890 $450.000 $405.750 $1,277.790 $1,130.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 88.000 $400.000 $243.450 $415.000 $296.410 $476.050 $453.000 $450.000
RETROFIT RAIL (TY T223)
LF 119.000 $210.000 $117.330 $215.000 $277.250 $149.770 $160.000 $200.000
RC PIPE (CL III)(18 IN)(SPL)
LF 14.000 $35.000 $40.000 $42.000 $0.000 $69.840 $40.750 $0.000
RC PIPE (CL IV) (24 IN) (SPL)
LF 104.000 $60.000 $74.380 $60.000 $64.390 $61.010 $61.000 $55.000
RC PIPE (CL IV) (30 IN) (SPL)
LF 646.000 $68.000 $87.410 $78.000 $72.680 $77.260 $77.500 $70.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $3,500.000 $9,957.750 $5,000.000 $3,577.150 $5,787.140 $3,150.000 $3,100.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 220.000 $900.000 $642.130 $800.000 $590.160 $749.190 $726.000 $900.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 6.000 $1,000.000 $1,624.060 $800.000 $803.990 $973.480 $878.000 $1,000.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 17.000 $1,350.000 $2,061.170 $1,500.000 $1,120.660 $1,438.570 $1,430.000 $1,200.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 4.000 $1,200.000 $2,678.500 $1,500.000 $1,218.460 $1,740.310 $1,430.000 $1,300.000
SET (TY II) (30 IN) (RCP) (5: 1) (C)
EA 1.000 $1,225.000 $3,018.400 $1,800.000 $2,552.150 $2,897.770 $2,010.000 $1,400.000
REMOV STR (SET)
EA 111.000 $264.000 $68.520 $235.000 $124.860 $231.250 $258.000 $350.000
REMOV STR (PIPE)
LF 2,547.000 $12.000 $4.290 $10.000 $8.490 $8.520 $8.750 $10.000
MOBILIZATION
LS 1.000 $620,000.000 $700,000.000 $750,000.000 $926,041.260 $860,000.000 $400,000.000 $1,200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 29.000 $3,500.000 $3,318.970 $4,000.000 $11,087.880 $4,825.920 $3,800.000 $8,000.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 280.000 $35.000 $39.970 $68.000 $48.000 $28.970 $15.500 $50.000
ROCK FILTER DAMS (REMOVE)
LF 280.000 $6.500 $6.330 $18.000 $20.000 $15.800 $6.400 $21.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 1,092.000 $23.000 $5.520 $10.000 $25.000 $18.780 $14.750 $32.000
CONSTRUCTION EXITS (REMOVE)
SY 1,092.000 $8.500 $1.680 $5.000 $7.000 $4.410 $5.750 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $2.250 $5.650 $4.000 $2.320 $2.350 $2.150 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $0.920 $0.850 $1.000 $1.580 $1.240 $0.900 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 6,790.000 $3.700 $2.040 $4.500 $3.570 $2.810 $3.550 $4.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,790.000 $0.680 $0.280 $1.000 $1.000 $0.710 $0.650 $1.000
CONSTRUCTING DETOURS
SY 58,270.000 $30.000 $16.390 $15.000 $13.260 $15.500 $22.250 $21.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 2)
LF 5,140.000 $20.000 $60.810 $35.000 $39.570 $9.240 $34.750 $37.000
PORT CTB (REMOVE)(SGL SLP)(TY 2)
LF 5,140.000 $8.000 $2.830 $7.000 $13.670 $9.030 $7.550 $12.500
DRIVEWAYS (ACP)
SY 7,565.000 $30.000 $14.460 $20.000 $12.410 $14.160 $21.250 $26.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,175.000 $18.250 $15.440 $19.000 $18.500 $18.500 $20.750 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $1,500.000 $2,140.880 $1,650.000 $1,610.000 $1,610.000 $1,800.000 $1,700.000
REMOVE METAL BEAM GUARD FENCE
LF 830.000 $2.000 $0.530 $1.500 $1.500 $1.500 $1.900 $1.500
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,100.000 $1,590.880 $2,200.000 $2,135.000 $2,135.000 $2,430.000 $2,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $215.000 $70.580 $270.000 $270.000 $270.000 $336.000 $300.000
CRASH CUSH ATTEN (INSTL)
EA 18.000 $13,800.000 $15,208.490 $18,000.000 $9,224.550 $18,500.000 $18,500.000 $21,000.000
CRASH CUSH ATTEN (REMOVE)
EA 18.000 $1,100.000 $52.940 $1,100.000 $1,197.060 $1,085.000 $1,270.000 $1,100.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 57.000 $207.000 $247.500 $200.000 $182.000 $200.000 $249.000 $200.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $245.000 $269.500 $250.000 $197.000 $240.000 $293.000 $250.000
CONDT (PVC) (SCH 40) (4")
LF 16.000 $15.000 $27.500 $27.000 $26.000 $26.000 $29.000 $27.000
ELEC CONDR (NO.8) BARE
LF 20.000 $1.180 $2.200 $3.000 $3.000 $3.000 $3.400 $3.000
ELEC CONDR (NO.6) INSULATED
LF 24.000 $1.500 $3.030 $3.000 $3.000 $3.000 $3.400 $3.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 540.000 $1.750 $3.850 $2.400 $2.400 $2.400 $2.700 $3.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 360.000 $2.250 $2.750 $2.600 $2.600 $2.600 $2.900 $3.000
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
EA 2.000 $1,108.000 $1,650.000 $1,250.000 $1,250.000 $1,250.000 $1,400.000 $1,300.000
ALUMINUM SIGNS (TY A)
SF 24.500 $30.000 $25.300 $17.000 $25.000 $17.000 $19.250 $18.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 39.000 $500.000 $544.500 $530.000 $458.000 $530.000 $588.000 $550.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $590.000 $764.500 $650.000 $550.000 $650.000 $731.000 $700.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $920.000 $874.500 $850.000 $653.000 $810.000 $896.000 $800.000
RELOCATE SM RD SN SUP&AM TY S80
EA 2.000 $470.000 $434.500 $550.000 $380.000 $510.000 $616.000 $550.000
REMOVE SM RD SN SUP&AM
EA 48.000 $65.000 $66.000 $50.000 $60.000 $50.000 $81.000 $51.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 23.000 $55.000 $71.500 $55.000 $75.000 $54.000 $60.500 $55.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 175,470.000 $0.300 $0.370 $0.340 $0.250 $0.340 $0.390 $0.250
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,050.000 $1.000 $0.830 $0.750 $0.300 $0.750 $0.850 $0.500
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 177,200.000 $0.240 $0.370 $0.340 $0.250 $0.340 $0.390 $0.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 21,778.000 $0.650 $0.500 $0.450 $0.800 $0.450 $0.510 $0.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 15,610.000 $0.600 $0.500 $0.450 $0.800 $0.450 $0.510 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,756.000 $0.850 $0.970 $1.000 $1.080 $1.300 $2.250 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,405.000 $0.900 $0.830 $0.750 $0.750 $0.750 $0.850 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 76.000 $5.400 $4.950 $4.500 $5.000 $4.500 $5.050 $5.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,280.000 $2.800 $1.650 $1.500 $3.000 $1.500 $1.700 $3.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 88,354.000 $0.280 $0.370 $0.340 $0.280 $0.340 $0.390 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,770.000 $0.300 $0.370 $0.340 $0.280 $0.340 $0.390 $0.250
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 33,420.000 $0.340 $0.370 $0.340 $0.280 $0.340 $0.390 $0.250
PREFAB PAV MRK TY B (W)(DBL ARROW)
EA 10.000 $180.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
PREFAB PAV MRK TY B (W)(WORD)
EA 10.000 $200.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
REFL PAV MRKR TY I-C
EA 123.000 $3.250 $4.130 $3.750 $10.000 $3.750 $4.200 $10.000
REFL PAV MRKR TY II-A-A
EA 1,508.000 $2.950 $4.130 $3.750 $3.000 $3.750 $4.200 $3.000
ELIM EXT PAV MRK & MRKS (4")
LF 6,500.000 $0.480 $0.550 $0.500 $0.800 $0.500 $0.570 $0.500
INSTALL HWY TRF SIG (FLASH BEACON)
EA 2.000 $1,500.000 $2,750.000 $1,100.000 $1,100.000 $1,100.000 $1,230.000 $1,100.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $2,175.000 $2,750.000 $1,500.000 $1,500.000 $1,500.000 $1,680.000 $1,500.000
TEMP TRAF SIGNALS
EA 2.000 $7,500.000 $9,658.000 $3,500.000 $3,500.000 $3,500.000 $3,910.000 $3,000.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $168.000 $220.000 $180.000 $180.000 $180.000 $201.000 $150.000
VEH SIG SEC (12")LED(RED)
EA 6.000 $168.000 $220.000 $180.000 $180.000 $180.000 $201.000 $150.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 305.000 $1.750 $5.500 $2.400 $2.400 $2.400 $2.700 $2.000
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 4.000 $4,200.000 $4,950.000 $5,000.000 $4,780.000 $4,780.000 $5,340.000 $4,000.000
THERMOPLASTIC PIPE (18 )(HDPE)
LF 3,688.000 $35.000 $24.500 $35.000 $0.000 $40.810 $19.250 $0.000
GEOGRID BASE REINFORCEMENT (TY I)
SY 228,354.950 $1.000 $0.610 $1.100 $0.870 $0.960 $0.840 $0.850
1
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 10.000 $180.000 $385.000 $380.000 $299.000 $350.000 $391.000 $300.000
1
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $200.000 $330.000 $220.000 $288.000 $300.000 $335.000 $290.000
2
RC PIPE (CL III)(18 IN)(SPL)
LF 3,802.000 $45.000 $0.000 $0.000 $33.600 $0.000 $0.000 $40.000
Totals: $10,930,263.480 $8,889,677.745 $9,529,352.693 $9,827,712.017 $9,841,438.302 $10,608,497.699 $12,139,030.992