HIDALGO SH 186 (0433-01-030)

Items: 107

County: HIDALGO
Length: N/A
Highway: SH 186
District: PHARR
Control Number: 0433-01-030
DBE Goal: N/A
Project: STP 1702(838)
Guaranty: N/A
Time: 566 WORKING DAYS
Engineer's Estimate: $12,915,933.85
Date: 10/03/2017 (8 years ago)
Contract Number: N/A
Type: REHABILITATE ROADWAY (SUPER 2)
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$12,915,933.85
1
Awarded
$12,133,439.10
Over/Under Est: -6.06% -$782,494.75
$12,144,209.09
Over/Under Est: -5.97% -$771,724.76
Amt Left: 0.09% $10,769.99
$12,665,396.08
Over/Under Est: -1.94% -$250,537.77
Amt Left: 4.38% $531,956.98
Delta: -4.29% -$521,186.99
$12,877,978.12
Over/Under Est: -0.29% -$37,955.73
Amt Left: 6.14% $744,539.02
Delta: -1.68% -$212,582.04
$13,947,543.21
Over/Under Est: 7.99% $1,031,609.36
Amt Left: 14.95% $1,814,104.11
Delta: -8.31% -$1,069,565.09
Over/Under Est: 22.58% $2,916,528.63
Amt Left: 30.49% $3,699,023.38
Delta: -13.51% -$1,884,919.27
$15,943,396.38
Over/Under Est: 23.44% $3,027,462.53
Amt Left: 31.4% $3,809,957.28
Delta: -0.70% -$110,933.90

Bid Items & Bid Tabulations

107 Total 0 of 107
HIDALGO  |  SH 186  |  PHARR  |  0433-01-030  |  10/03/2017  |  $12,915,933.85  |  STP 1702(838)  |  REHAB ROADWAY (SUPER 2)  |  566 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
ASAGO, LLC
FOREMOST PAVING, INC.
TEXAS SAI, INC.
IOC COMPANY, LLC
J. CARROLL WEAVER, INC.
ANDERSON COLUMBIA CO., INC.
RAY FARIS, INC.
PREPARING ROW
STA 509.000 $400.000 $200.000 $700.000 $500.000 $1,750.000 $231.000 $374.610 $352.860
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 34.000 $400.000 $200.000 $400.000 $500.000 $175.000 $869.000 $904.200 $790.000
EXCAVATION (ROADWAY)
CY 47,359.000 $3.500 $2.500 $3.500 $5.500 $3.010 $10.190 $12.960 $7.530
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 36,750.000 $4.500 $3.500 $3.000 $3.350 $2.000 $3.810 $8.870 $4.300
FURNISHING AND PLACING TOPSOIL
CY 1,000.000 $28.000 $20.000 $20.000 $11.000 $15.000 $5.310 $27.700 $10.750
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 50.970 $685.000 $1,166.000 $1,000.000 $1,000.000 $1,000.000 $1,100.000 $1,325.710 $1,300.000
DRILL SEEDING (TEMP) (WARM)
AC 50.970 $685.000 $699.600 $600.000 $600.000 $600.000 $660.000 $866.810 $850.000
VEGETATIVE WATERING
MG 2,000.000 $18.000 $5.000 $5.000 $24.500 $18.000 $13.200 $26.930 $11.600
SPRINKLING (DUST CONTROL)
MG 2,028.000 $10.500 $1.000 $1.000 $24.500 $5.000 $13.200 $4.280 $11.600
PROOF ROLLING
HR 500.000 $35.000 $35.000 $2.000 $55.000 $50.000 $16.500 $72.580 $53.750
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
CY 20,616.000 $21.000 $17.000 $16.000 $20.000 $14.750 $15.530 $20.240 $21.880
RWRK BS MTL(TY B)(6")(DEN CNT)(ORG POS)
CY 49,455.000 $2.000 $4.000 $4.000 $7.600 $8.000 $11.190 $4.290 $11.350
REWORK BS MTL(TY B)(13")(DC)(ORG POS)
CY 21,021.000 $3.000 $5.250 $5.500 $12.500 $7.000 $11.340 $5.050 $12.900
CEMENT
TON 8,082.000 $160.000 $155.000 $140.000 $152.000 $147.000 $160.420 $164.990 $150.000
CEMENT TREAT (EXIST MATL)(12")
SY 336,219.000 $1.100 $1.300 $2.350 $1.500 $1.500 $1.060 $2.210 $1.940
CEMENT TRT (MX EXST MTL & NW BS)(10")
SY 325,794.000 $2.000 $1.200 $1.750 $1.200 $1.500 $1.140 $3.070 $1.720
SALV, HAUL & STKPL RCL ASPH PAV (1")
SY 248,593.000 $1.000 $1.150 $0.800 $0.280 $0.610 $1.090 $0.530 $1.320
PRIME COAT (MC-30)
GAL 65,160.000 $4.000 $3.250 $3.100 $3.500 $3.500 $3.010 $2.900 $3.880
ASPH (SPG 73-19)
GAL 97,734.000 $2.200 $2.500 $3.250 $2.600 $2.600 $2.540 $2.650 $2.760
AGGR (TY-PD GR-4P)(SAC-B)
CY 2,715.000 $62.000 $80.000 $52.000 $100.000 $85.000 $99.350 $101.840 $102.860
D-GR HMA TY-D SAC-A PG76-22
TON 53,924.000 $78.000 $76.000 $62.000 $66.000 $69.000 $82.440 $85.640 $75.080
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 1,058.000 $1.200 $4.000 $8.000 $5.000 $2.400 $6.600 $4.410 $5.800
CEM STABIL BKFL
CY 392.000 $56.000 $45.000 $60.000 $42.500 $60.000 $46.750 $67.230 $36.000
CUT & RESTORING PAV
SY 872.000 $45.000 $40.000 $70.000 $60.000 $55.000 $23.100 $48.290 $125.000
STRUCT EXCAV (SPECIAL)
CY 471.000 $30.000 $40.000 $30.000 $28.650 $36.000 $31.520 $48.440 $35.000
TRENCH EXCAVATION PROTECTION
LF 1,390.000 $5.000 $2.000 $4.000 $3.680 $1.000 $4.050 $8.570 $4.400
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 60.000 $260.000 $315.550 $295.000 $295.000 $295.000 $396.000 $300.830 $360.000
RIPRAP (MOW STRIP)(4 IN)
CY 120.000 $300.000 $300.000 $300.000 $300.000 $360.000 $330.000 $403.320 $350.000
CONC BOX CULV (3 FT X 3 FT)
LF 64.000 $160.000 $300.000 $193.000 $192.150 $157.410 $211.370 $178.660 $300.000
CONC BOX CULV (6 FT X 3 FT)
LF 152.000 $250.000 $400.000 $290.000 $286.400 $316.930 $315.040 $300.320 $650.000
RC PIPE (CL III)(24 IN)
LF 1,505.000 $55.000 $50.000 $37.000 $36.510 $65.000 $40.160 $52.520 $52.250
RC PIPE (CL III)(30 IN)
LF 498.000 $85.000 $70.000 $53.000 $52.330 $75.000 $57.560 $80.470 $75.150
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $3,500.000 $6,000.000 $2,500.000 $2,465.000 $3,750.000 $2,711.500 $3,126.640 $2,500.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $4,700.000 $4,500.000 $6,500.000 $6,500.000 $6,500.000 $7,150.000 $4,344.260 $3,500.000
WINGWALL (FW - 0) (HW=5 FT)
EA 4.000 $8,200.000 $7,000.000 $8,500.000 $8,500.000 $9,500.000 $9,350.000 $6,730.540 $7,200.000
WINGWALL (FW - 0) (HW=8 FT)
EA 2.000 $16,200.000 $8,000.000 $11,700.000 $11,500.000 $11,500.000 $12,650.000 $7,954.290 $9,600.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 86.000 $1,000.000 $1,000.000 $825.000 $825.000 $750.000 $907.500 $882.110 $425.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 31.000 $950.000 $1,100.000 $940.000 $935.000 $850.000 $1,028.500 $1,290.020 $630.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 4.000 $2,000.000 $1,500.000 $1,500.000 $1,500.000 $1,250.000 $1,650.000 $2,891.080 $950.000
REMOV STR (SET)
EA 18.000 $150.000 $200.000 $250.000 $225.000 $250.000 $247.500 $244.750 $200.000
REMOV STR (HEADWALL)
EA 10.000 $1,400.000 $300.000 $250.000 $250.000 $1,000.000 $275.000 $318.680 $200.000
REMOV STR (PIPE)
LF 1,070.000 $20.000 $8.000 $5.000 $4.320 $10.000 $4.750 $13.710 $25.000
MOBILIZATION
LS 1.000 $760,000.000 $800,000.000 $1,100,000.000 $1,055,000.000 $1,200,000.000 $880,549.110 $1,270,540.000 $1,479,642.840
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $8,000.000 $3,500.000 $2,000.000 $8,000.000 $2,500.000 $1,540.000 $6,592.930 $3,727.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 320.000 $34.000 $40.000 $50.000 $42.500 $45.000 $49.500 $41.300 $40.500
ROCK FILTER DAMS (REMOVE)
LF 320.000 $12.500 $5.000 $20.000 $20.500 $7.500 $5.500 $19.890 $19.500
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 1,244.000 $14.000 $10.000 $20.000 $18.000 $15.000 $28.600 $22.440 $26.000
CONSTRUCTION EXITS (REMOVE)
SY 1,244.000 $5.000 $3.000 $5.000 $7.000 $4.000 $3.300 $8.160 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 50.000 $5.000 $8.000 $10.000 $8.000 $3.000 $11.000 $7.910 $7.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 50.000 $1.500 $2.000 $5.000 $6.000 $1.000 $1.100 $7.910 $6.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 9,073.000 $4.000 $3.000 $3.500 $4.250 $3.000 $3.850 $4.080 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 9,073.000 $1.000 $0.500 $0.600 $0.750 $0.500 $0.550 $0.710 $0.700
CONSTRUCTING DETOURS
SY 58,207.000 $19.000 $20.000 $19.000 $20.000 $16.500 $27.890 $25.070 $37.460
PORT CTB (FUR & INST)(SGL SLOPE)(TY 2)
LF 5,850.000 $52.000 $30.000 $27.000 $22.000 $15.000 $23.350 $39.380 $52.000
PORT CTB (MOVE)(SGL SLP)(TY 2)
LF 12,450.000 $6.000 $2.000 $5.400 $5.000 $6.500 $7.580 $7.130 $8.000
PORT CTB (REMOVE)(SGL SLP)(TY 2)
LF 5,850.000 $3.000 $5.000 $5.000 $8.000 $10.000 $10.930 $14.360 $24.000
DRIVEWAYS (ACP)
SY 4,018.000 $28.000 $28.000 $35.000 $32.000 $20.000 $27.500 $48.700 $40.800
MTL W-BEAM GD FEN (TIM POST)
LF 1,950.000 $22.000 $19.000 $20.000 $21.950 $21.000 $23.380 $20.910 $20.000
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $2,500.000 $2,000.000 $2,000.000 $2,250.000 $2,150.000 $2,475.000 $2,335.300 $2,400.000
CRASH CUSH ATTEN (INSTL)
EA 4.000 $15,000.000 $8,000.000 $15,000.000 $15,850.000 $7,500.000 $17,435.000 $17,540.290 $14,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 10.000 $2,000.000 $1,000.000 $1,900.000 $2,325.000 $850.000 $2,557.500 $3,778.630 $1,667.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $800.000 $1,000.000 $1,000.000 $1,850.000 $500.000 $2,035.000 $1,244.130 $800.000
CONDT (PVC) (SCH 40) (4")
LF 61.000 $15.000 $33.920 $32.000 $32.000 $32.000 $13.200 $32.630 $52.000
ELEC CONDR (NO.8) BARE
LF 20.000 $2.000 $2.650 $2.500 $2.500 $2.500 $1.650 $2.550 $4.300
ELEC CONDR (NO.6) INSULATED
LF 24.000 $1.420 $2.650 $2.500 $2.500 $2.500 $1.650 $2.550 $4.500
TRAY CABLE (4 CONDR) (12 AWG)
LF 595.000 $2.500 $2.330 $2.200 $2.200 $2.200 $1.650 $2.240 $4.900
GROUND BOX TY A (122311)W/APRON
EA 2.000 $965.000 $901.000 $850.000 $850.000 $850.000 $1,100.000 $866.810 $1,150.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 340.000 $2.300 $2.860 $2.700 $2.700 $2.700 $2.750 $2.750 $5.750
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
EA 2.000 $1,000.000 $1,749.000 $1,650.000 $1,650.000 $1,650.000 $1,100.000 $1,682.640 $4,200.000
ALUMINUM SIGNS (TY A)
SF 863.520 $30.000 $14.000 $16.500 $27.500 $15.980 $23.100 $18.870 $24.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 57.000 $450.000 $400.000 $430.000 $350.000 $436.110 $385.000 $464.000 $510.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 18.000 $660.000 $550.000 $500.000 $480.000 $516.290 $528.000 $545.580 $625.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $710.000 $800.000 $590.000 $675.000 $592.760 $742.500 $642.470 $850.000
REMOVE SM RD SN SUP&AM
EA 51.000 $70.000 $40.000 $65.000 $48.330 $40.730 $53.160 $83.630 $75.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 43.000 $74.890 $80.000 $44.000 $41.300 $44.070 $45.430 $71.390 $75.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 10,540.000 $0.300 $0.340 $0.300 $0.280 $0.280 $0.350 $0.330 $0.320
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 204,390.000 $0.400 $0.340 $0.300 $0.280 $0.280 $0.350 $0.330 $0.320
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,608.000 $0.500 $0.740 $0.600 $0.600 $0.600 $0.770 $0.710 $0.700
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 212,420.000 $0.400 $0.340 $0.300 $0.280 $0.280 $0.350 $0.330 $0.320
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 3,040.000 $3.000 $2.390 $3.000 $2.900 $2.900 $2.480 $2.300 $2.250
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 1,400.000 $0.600 $0.740 $0.800 $0.800 $0.800 $0.770 $0.710 $0.700
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 156,590.000 $0.600 $0.580 $0.500 $0.500 $0.500 $0.610 $0.560 $0.550
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 264.000 $1.500 $1.590 $1.500 $1.400 $1.400 $1.650 $1.530 $1.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 157,870.000 $0.600 $0.580 $0.500 $0.500 $0.500 $0.610 $0.560 $0.550
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 3,600.000 $1.200 $1.060 $1.200 $1.200 $1.200 $1.100 $1.020 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,795.000 $0.800 $0.640 $1.000 $0.950 $0.950 $0.660 $0.610 $0.600
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 91.000 $6.500 $6.360 $9.800 $9.800 $9.800 $6.600 $6.120 $6.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,945.000 $2.000 $3.180 $3.800 $3.800 $3.800 $3.300 $3.060 $3.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 13,181.000 $0.400 $0.350 $0.400 $0.380 $0.380 $0.360 $0.340 $0.330
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 102,476.000 $0.400 $0.350 $0.330 $0.320 $0.320 $0.360 $0.340 $0.330
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 85,216.000 $0.400 $0.350 $0.330 $0.320 $0.320 $0.360 $0.340 $0.330
PREFAB PAV MRK TY C (W) (ARROW)
EA 15.000 $200.000 $222.600 $220.000 $220.000 $220.000 $231.000 $214.160 $210.000
PREFAB PAV MRK TY C (W) (WORD)
EA 16.000 $210.000 $265.000 $240.000 $240.000 $240.000 $275.000 $254.950 $250.000
PREFAB PAV MRK TY C(EVAC SYM, BLUE/WHT)
EA 10.000 $475.000 $477.000 $600.000 $580.000 $580.000 $495.000 $458.910 $450.000
REFL PAV MRKR TY I-C
EA 461.000 $3.000 $3.180 $3.200 $3.200 $3.200 $3.300 $3.060 $3.000
REFL PAV MRKR TY II-A-A
EA 2,861.000 $3.000 $3.180 $3.000 $2.800 $2.800 $3.300 $3.060 $3.000
INSTALL HWY TRF SIG (FLASH BEACON)
EA 2.000 $3,000.000 $1,961.000 $1,850.000 $1,850.000 $1,850.000 $2,200.000 $1,886.590 $5,250.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $5,000.000 $1,961.000 $1,850.000 $1,850.000 $1,850.000 $4,950.000 $1,886.590 $3,800.000
VEH SIG SEC (12")LED(YEL)
EA 12.000 $250.000 $259.700 $245.000 $245.000 $245.000 $220.000 $249.850 $415.000
VEH SIG SEC (12")LED(RED)
EA 6.000 $250.000 $265.000 $250.000 $250.000 $250.000 $220.000 $254.950 $415.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 430.000 $2.100 $2.510 $2.370 $2.370 $2.370 $1.650 $2.420 $4.900
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $6,700.000 $6,148.000 $5,800.000 $5,800.000 $5,800.000 $5,500.000 $5,914.710 $9,600.000
INS TRF SIG PL AM (S)STR(TY D)LUM
EA 4.000 $5,000.000 $6,572.000 $6,200.000 $6,200.000 $6,200.000 $7,700.000 $6,322.630 $4,700.000
TRANSPLANT PLANT MATERIAL
EA 111.000 $500.000 $810.370 $700.000 $695.000 $600.000 $764.500 $1,223.730 $1,220.000
THERMOPLASTIC PIPE (18 )(HDPE)
LF 1,580.000 $45.000 $39.000 $23.500 $23.500 $0.000 $25.850 $0.000 $0.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 968.000 $50.000 $20.000 $15.000 $60.000 $39.890 $16.500 $34.230 $41.000
1
RC PIPE (CL III)(18 IN)
LF 1,580.000 $45.000 $0.000 $0.000 $0.000 $65.000 $0.000 $40.890 $36.500
Totals: $12,987,033.850 $12,133,439.102 $12,144,209.090 $12,665,396.080 $12,877,978.130 $13,947,543.212 $15,832,462.497 $15,943,396.380