PREPARING ROW
|
STA
|
31.750
|
$1,150.000
|
$2,000.000
|
$35,500.000
|
$10,000.000
|
$95,000.000
|
$117,112.230
|
$127,500.000
|
$65,000.000
|
$140,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
837.000
|
$7.000
|
$9.680
|
$13.000
|
$7.500
|
$7.930
|
$6.820
|
$8.000
|
$10.000
|
$20.000
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
10.630
|
$5,000.000
|
$1,500.000
|
$900.000
|
$800.000
|
$2,016.480
|
$965.760
|
$2,500.000
|
$3,500.000
|
$5,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,019.000
|
$11.000
|
$8.560
|
$2.750
|
$8.000
|
$13.870
|
$14.020
|
$32.000
|
$20.000
|
$35.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
31,952.000
|
$20.000
|
$18.580
|
$15.000
|
$14.000
|
$15.090
|
$16.150
|
$11.500
|
$30.000
|
$11.400
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
13,368.000
|
$25.000
|
$25.000
|
$15.500
|
$35.000
|
$10.840
|
$37.380
|
$30.000
|
$30.000
|
$45.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
16,220.000
|
$2.500
|
$1.480
|
$3.450
|
$3.000
|
$1.060
|
$1.680
|
$2.750
|
$2.000
|
$0.750
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
16,220.000
|
$0.800
|
$0.650
|
$0.720
|
$0.800
|
$0.650
|
$0.650
|
$0.690
|
$0.880
|
$0.690
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
8,110.000
|
$0.700
|
$0.630
|
$0.700
|
$0.800
|
$0.630
|
$0.630
|
$0.650
|
$0.880
|
$0.650
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
8,110.000
|
$0.700
|
$0.630
|
$0.660
|
$0.630
|
$0.630
|
$0.630
|
$0.630
|
$0.880
|
$0.630
|
|
|
VEGETATIVE WATERING
|
MG
|
357.000
|
$21.000
|
$28.000
|
$22.300
|
$25.000
|
$25.950
|
$25.950
|
$25.000
|
$15.000
|
$38.000
|
|
|
LIME (HYDRATED LIME (DRY))
|
TON
|
53.000
|
$170.000
|
$185.000
|
$159.000
|
$180.000
|
$237.900
|
$170.450
|
$350.000
|
$300.000
|
$250.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
2,907.000
|
$3.500
|
$5.000
|
$6.000
|
$5.000
|
$5.070
|
$6.000
|
$20.000
|
$8.000
|
$10.000
|
|
|
CEMENT
|
TON
|
53.000
|
$145.000
|
$166.950
|
$175.000
|
$150.000
|
$214.090
|
$141.060
|
$350.000
|
$200.000
|
$250.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
2,907.000
|
$3.000
|
$5.000
|
$5.000
|
$5.000
|
$2.770
|
$6.000
|
$20.000
|
$6.000
|
$10.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
330.000
|
$3.100
|
$10.150
|
$11.000
|
$10.150
|
$4.500
|
$9.870
|
$10.150
|
$11.000
|
$10.180
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
9,445.000
|
$2.800
|
$3.500
|
$3.700
|
$3.500
|
$3.700
|
$4.000
|
$3.500
|
$4.500
|
$5.000
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
225.000
|
$107.000
|
$176.150
|
$185.000
|
$176.150
|
$207.000
|
$250.000
|
$176.150
|
$155.000
|
$180.000
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
663.000
|
$115.000
|
$121.000
|
$128.000
|
$121.000
|
$136.500
|
$112.370
|
$121.000
|
$150.000
|
$125.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,378.000
|
$1.500
|
$4.740
|
$5.000
|
$3.000
|
$6.020
|
$4.530
|
$6.250
|
$6.000
|
$10.000
|
|
|
CEM STABIL BKFL
|
CY
|
472.000
|
$306.000
|
$165.530
|
$160.000
|
$50.000
|
$100.200
|
$148.350
|
$97.000
|
$300.000
|
$150.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
835.000
|
$3.100
|
$2.280
|
$2.500
|
$20.000
|
$5.700
|
$10.000
|
$1.000
|
$10.000
|
$2.590
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,793.000
|
$50.000
|
$50.000
|
$71.000
|
$25.000
|
$32.500
|
$62.380
|
$25.000
|
$35.000
|
$40.000
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
2.000
|
$18,000.000
|
$19,991.300
|
$26,500.000
|
$6,000.000
|
$25,000.000
|
$5,000.000
|
$41,500.000
|
$10,000.000
|
$4,961.700
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
122.000
|
$50.000
|
$70.000
|
$290.000
|
$300.000
|
$241.370
|
$83.680
|
$140.000
|
$100.000
|
$800.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
568.000
|
$272.000
|
$211.680
|
$395.000
|
$500.000
|
$337.440
|
$189.500
|
$340.000
|
$225.000
|
$500.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
10,602.000
|
$650.000
|
$814.410
|
$800.000
|
$950.000
|
$621.240
|
$670.000
|
$625.000
|
$750.000
|
$1,250.000
|
|
|
CL C CONC (ABUT)
|
CY
|
121.400
|
$1,010.000
|
$1,306.410
|
$1,025.000
|
$1,200.000
|
$989.400
|
$1,215.950
|
$800.000
|
$1,200.000
|
$1,500.000
|
|
|
CL C CONC (BENT)
|
CY
|
1,854.200
|
$935.000
|
$1,371.560
|
$1,500.000
|
$1,500.000
|
$1,670.000
|
$1,717.000
|
$1,200.000
|
$1,200.000
|
$2,000.000
|
|
|
REINF CONC SLAB
|
SF
|
249,600.000
|
$20.000
|
$18.020
|
$21.000
|
$16.000
|
$19.000
|
$25.000
|
$20.000
|
$24.000
|
$18.000
|
|
|
APPROACH SLAB
|
CY
|
133.800
|
$825.000
|
$585.000
|
$550.000
|
$650.000
|
$762.260
|
$561.190
|
$455.000
|
$550.000
|
$495.460
|
|
|
RETAINING WALL (MSE)
|
SF
|
12,990.000
|
$60.000
|
$67.250
|
$25.000
|
$50.000
|
$40.000
|
$16.000
|
$1.000
|
$75.000
|
$35.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
3,115.000
|
$11.000
|
$19.000
|
$5.000
|
$18.000
|
$20.030
|
$9.000
|
$16.500
|
$35.000
|
$10.000
|
|
|
PRESTR CONC GIRDER (TX70)
|
LF
|
24,859.120
|
$170.000
|
$171.510
|
$173.000
|
$200.000
|
$248.920
|
$185.070
|
$150.000
|
$200.000
|
$200.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
183.000
|
$540.000
|
$472.110
|
$568.000
|
$650.000
|
$550.000
|
$580.270
|
$470.000
|
$500.000
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
28.700
|
$500.000
|
$458.000
|
$568.000
|
$650.000
|
$550.000
|
$637.890
|
$500.000
|
$500.000
|
$480.000
|
|
|
RIPRAP (STONE TY F)(DRY)(18")
|
CY
|
240.000
|
$90.000
|
$260.000
|
$118.000
|
$140.000
|
$223.680
|
$125.000
|
$165.000
|
$150.000
|
$44.520
|
|
|
RAIL (TY T1F)
|
LF
|
12,540.000
|
$90.000
|
$111.570
|
$163.000
|
$160.000
|
$172.570
|
$205.000
|
$138.000
|
$200.000
|
$145.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
780.000
|
$85.000
|
$68.000
|
$121.000
|
$125.000
|
$146.110
|
$136.390
|
$102.000
|
$85.000
|
$157.130
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,223.000
|
$40.000
|
$60.520
|
$57.000
|
$60.000
|
$107.220
|
$54.000
|
$58.000
|
$40.000
|
$48.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
367.000
|
$57.000
|
$80.000
|
$78.000
|
$75.000
|
$144.860
|
$64.000
|
$75.000
|
$55.000
|
$69.000
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
6.000
|
$3,500.000
|
$5,188.650
|
$3,600.000
|
$4,200.000
|
$8,795.830
|
$4,000.000
|
$4,800.000
|
$6,000.000
|
$5,200.000
|
|
|
INLET (COMPL)(PCO)(5FT)(LEFT)
|
EA
|
4.000
|
$3,800.000
|
$5,640.800
|
$3,900.000
|
$4,200.000
|
$9,464.540
|
$5,000.000
|
$5,800.000
|
$6,500.000
|
$5,700.000
|
|
|
INLET (COMPL)(PCO)(5FT)(RIGHT)
|
EA
|
3.000
|
$3,800.000
|
$5,714.280
|
$3,900.000
|
$4,200.000
|
$9,464.810
|
$5,000.000
|
$6,150.000
|
$6,500.000
|
$5,700.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
28.000
|
$585.000
|
$800.000
|
$1,100.000
|
$1,400.000
|
$1,669.690
|
$1,000.000
|
$850.000
|
$600.000
|
$1,070.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
2.000
|
$1,000.000
|
$950.000
|
$1,100.000
|
$1,600.000
|
$2,806.480
|
$950.000
|
$1,000.000
|
$650.000
|
$1,225.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$875.000
|
$1,500.000
|
$1,350.000
|
$1,600.000
|
$3,161.740
|
$1,800.000
|
$1,775.000
|
$900.000
|
$1,480.000
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
$200,000.000
|
$1,232,000.000
|
$900,000.000
|
$1,150,000.000
|
$1,232,000.000
|
$1,492,500.000
|
$1,840,000.000
|
$1,500,000.000
|
$3,150,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
19.000
|
$320.000
|
$1,000.000
|
$56.000
|
$250.000
|
$1,500.710
|
$391.920
|
$275.000
|
$500.000
|
$350.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,399,000.000
|
$2,650,000.000
|
$3,270,000.000
|
$3,400,000.000
|
$3,626,737.770
|
$3,718,313.440
|
$4,500,000.000
|
$3,800,000.000
|
$4,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
30.000
|
$5,000.000
|
$1,000.000
|
$13,500.000
|
$29,997.330
|
$5,844.110
|
$9,610.000
|
$140,000.000
|
$70,000.000
|
$50,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,080.000
|
$24.000
|
$26.550
|
$32.500
|
$27.000
|
$26.550
|
$26.550
|
$32.000
|
$35.000
|
$29.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,080.000
|
$6.000
|
$8.450
|
$9.000
|
$8.000
|
$8.450
|
$8.450
|
$9.000
|
$11.000
|
$18.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
160.000
|
$20.000
|
$35.500
|
$31.500
|
$40.000
|
$35.500
|
$35.500
|
$21.500
|
$30.000
|
$45.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
160.000
|
$10.000
|
$11.950
|
$10.500
|
$10.000
|
$11.950
|
$11.950
|
$8.000
|
$11.000
|
$1.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
600.000
|
$25.000
|
$33.120
|
$15.000
|
$20.000
|
$20.000
|
$18.000
|
$35.000
|
$30.000
|
$31.920
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
150.000
|
$92.000
|
$65.720
|
$144.000
|
$100.000
|
$149.710
|
$57.820
|
$120.000
|
$125.000
|
$75.410
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,400.000
|
$3.000
|
$2.490
|
$3.000
|
$2.700
|
$2.290
|
$2.290
|
$1.650
|
$3.000
|
$1.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,400.000
|
$0.800
|
$0.650
|
$0.800
|
$0.500
|
$0.650
|
$0.650
|
$0.600
|
$1.000
|
$0.550
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
200.000
|
$118.000
|
$90.250
|
$182.000
|
$275.000
|
$198.520
|
$98.390
|
$95.000
|
$200.000
|
$84.580
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,605.000
|
$30.000
|
$35.000
|
$65.000
|
$75.000
|
$41.090
|
$38.880
|
$48.000
|
$75.000
|
$30.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
430.000
|
$5.000
|
$8.000
|
$5.000
|
$20.000
|
$18.650
|
$5.340
|
$8.500
|
$5.000
|
$22.900
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
1,605.000
|
$8.500
|
$6.000
|
$7.500
|
$25.000
|
$16.280
|
$9.230
|
$8.500
|
$15.000
|
$13.250
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,390.000
|
$25.000
|
$26.090
|
$23.500
|
$15.000
|
$45.000
|
$42.210
|
$26.500
|
$35.000
|
$45.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,797.000
|
$27.000
|
$32.000
|
$23.000
|
$14.840
|
$33.000
|
$39.190
|
$14.840
|
$55.000
|
$19.260
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
101.000
|
$65.000
|
$110.000
|
$100.000
|
$100.000
|
$130.000
|
$94.210
|
$95.000
|
$95.000
|
$121.700
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
250.000
|
$20.000
|
$25.500
|
$20.000
|
$25.500
|
$25.500
|
$19.000
|
$25.500
|
$25.000
|
$19.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$1,500.000
|
$1,946.100
|
$1,530.000
|
$1,946.100
|
$1,946.100
|
$1,450.000
|
$1,946.100
|
$1,800.000
|
$1,450.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
2.000
|
$1,100.000
|
$1,233.260
|
$790.000
|
$1,233.260
|
$1,233.260
|
$750.000
|
$1,233.260
|
$1,300.000
|
$750.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,077.000
|
$3.000
|
$2.770
|
$2.650
|
$2.770
|
$2.770
|
$2.500
|
$2.770
|
$3.000
|
$2.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,150.000
|
$2,930.410
|
$2,625.000
|
$2,930.410
|
$2,930.410
|
$2,500.000
|
$2,930.410
|
$300.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$360.000
|
$48.090
|
$231.000
|
$48.090
|
$48.090
|
$220.000
|
$48.090
|
$3,000.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,000.000
|
$114.490
|
$121.000
|
$114.490
|
$114.490
|
$114.490
|
$114.490
|
$900.000
|
$850.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$20,000.000
|
$14,337.880
|
$16,500.000
|
$14,337.580
|
$14,337.880
|
$14,337.880
|
$14,337.880
|
$18,000.000
|
$22,477.230
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
2.000
|
$35,000.000
|
$27,246.730
|
$31,500.000
|
$27,246.730
|
$27,246.730
|
$27,246.730
|
$27,246.730
|
$33,000.000
|
$22,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$20,000.000
|
$8,066.770
|
$9,300.000
|
$8,006.770
|
$8,006.770
|
$8,006.770
|
$8,006.770
|
$11,000.000
|
$7,625.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
3.000
|
$245.000
|
$275.950
|
$237.000
|
$225.700
|
$250.000
|
$350.000
|
$225.700
|
$300.000
|
$295.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
2.000
|
$290.000
|
$306.360
|
$282.000
|
$267.300
|
$300.000
|
$375.000
|
$267.300
|
$400.000
|
$329.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
18.000
|
$450.000
|
$265.610
|
$320.000
|
$303.900
|
$350.000
|
$630.000
|
$303.900
|
$1,000.000
|
$385.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
$170.000
|
$103.980
|
$107.000
|
$101.900
|
$80.000
|
$90.000
|
$101.900
|
$150.000
|
$137.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
9.000
|
$15.000
|
$28.410
|
$13.000
|
$12.300
|
$30.000
|
$29.000
|
$12.300
|
$30.000
|
$29.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
8,500.000
|
$0.150
|
$0.500
|
$0.420
|
$0.400
|
$0.360
|
$0.360
|
$0.400
|
$0.550
|
$0.360
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
14,680.000
|
$0.400
|
$0.500
|
$0.420
|
$0.400
|
$0.360
|
$0.360
|
$0.400
|
$0.550
|
$0.360
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
314.000
|
$2.500
|
$5.000
|
$4.600
|
$5.500
|
$4.000
|
$4.000
|
$5.500
|
$5.500
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
314.000
|
$2.500
|
$5.000
|
$4.600
|
$5.500
|
$4.000
|
$4.000
|
$5.500
|
$5.500
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
936.000
|
$2.000
|
$4.000
|
$4.600
|
$5.000
|
$4.000
|
$4.000
|
$5.000
|
$4.500
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
936.000
|
$2.000
|
$4.000
|
$4.600
|
$5.000
|
$4.000
|
$4.000
|
$5.000
|
$4.500
|
$4.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
17,037.000
|
$1.000
|
$0.660
|
$1.150
|
$0.250
|
$0.750
|
$1.000
|
$1.000
|
$2.000
|
$1.230
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
765.000
|
$1.500
|
$1.510
|
$1.150
|
$1.000
|
$1.000
|
$1.500
|
$2.000
|
$2.000
|
$1.600
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
1,286.000
|
$1.000
|
$1.360
|
$1.150
|
$1.000
|
$0.850
|
$1.500
|
$2.000
|
$2.000
|
$1.580
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
100.000
|
$3.000
|
$6.000
|
$10.500
|
$8.000
|
$10.000
|
$10.000
|
$8.000
|
$7.000
|
$10.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
300.000
|
$3.000
|
$6.000
|
$8.400
|
$8.000
|
$8.000
|
$8.000
|
$8.000
|
$7.000
|
$8.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
3.000
|
$325.000
|
$500.000
|
$450.000
|
$100.000
|
$425.000
|
$425.000
|
$100.000
|
$600.000
|
$425.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
13,680.000
|
$0.250
|
$0.350
|
$0.180
|
$0.200
|
$0.170
|
$0.170
|
$0.200
|
$0.380
|
$0.170
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,950.000
|
$0.300
|
$0.600
|
$0.580
|
$0.900
|
$0.550
|
$0.550
|
$0.900
|
$0.700
|
$0.550
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
12,560.000
|
$0.300
|
$0.600
|
$0.490
|
$0.700
|
$0.470
|
$0.470
|
$0.700
|
$0.700
|
$0.470
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
600.000
|
$0.300
|
$0.600
|
$0.580
|
$0.900
|
$0.550
|
$0.550
|
$0.900
|
$0.700
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
15,310.000
|
$0.300
|
$0.600
|
$0.490
|
$0.700
|
$0.470
|
$0.470
|
$0.700
|
$0.700
|
$0.470
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
6.000
|
$310.000
|
$190.000
|
$470.000
|
$450.000
|
$445.000
|
$445.000
|
$450.000
|
$220.000
|
$445.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
24.000
|
$3.000
|
$5.000
|
$4.200
|
$5.000
|
$4.000
|
$4.000
|
$5.500
|
$6.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
440.000
|
$3.000
|
$3.600
|
$4.200
|
$5.500
|
$4.000
|
$4.000
|
$5.500
|
$4.000
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
74.000
|
$3.000
|
$5.000
|
$4.200
|
$5.500
|
$4.000
|
$4.000
|
$5.500
|
$6.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
6,250.000
|
$0.200
|
$0.750
|
$0.600
|
$1.000
|
$0.570
|
$0.570
|
$1.000
|
$1.000
|
$0.570
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
13,680.000
|
$0.200
|
$0.150
|
$0.260
|
$0.100
|
$0.250
|
$0.250
|
$0.100
|
$0.170
|
$0.250
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
6,382.000
|
$100.000
|
$103.350
|
$109.000
|
$103.350
|
$115.500
|
$90.990
|
$115.000
|
$115.000
|
$120.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
144.000
|
$95.000
|
$163.550
|
$172.000
|
$163.350
|
$130.000
|
$115.140
|
$163.350
|
$200.000
|
$163.760
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
2,474.000
|
$110.000
|
$121.100
|
$128.000
|
$121.100
|
$126.500
|
$103.940
|
$121.100
|
$125.000
|
$121.400
|
|
|
TACK COAT
|
GAL
|
4,066.000
|
$3.250
|
$3.500
|
$3.700
|
$3.500
|
$3.100
|
$3.000
|
$3.500
|
$3.000
|
$3.510
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
8.000
|
$4,500.000
|
$4,665.490
|
$3,700.000
|
$3,000.000
|
$3,440.630
|
$3,000.000
|
$3,440.630
|
$4,000.000
|
$2,977.020
|
|
|
FLOATING TURBIDITY BARRIER(FUR & INST)
|
LF
|
5,700.000
|
$16.400
|
$27.550
|
$23.500
|
$40.000
|
$29.210
|
$34.860
|
$27.500
|
$65.000
|
$16.540
|
|
|
FLOATING TURBIDITY BARRIER (REMOVE)
|
LF
|
5,700.000
|
$3.900
|
$12.000
|
$3.000
|
$1.500
|
$5.210
|
$5.660
|
$7.700
|
$10.000
|
$4.270
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,500.000
|
$8,200.000
|
$12,500.000
|
$7,500.000
|
$19,031.990
|
$7,500.000
|
$20,000.000
|
$200,000.000
|
$8,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$125.000
|
$142.950
|
$130.000
|
$300.000
|
$200.000
|
$275.060
|
$314.890
|
$300.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
6.000
|
$101.000
|
$250.000
|
$600.000
|
$750.000
|
$200.000
|
$685.820
|
$500.000
|
$300.000
|
$1,000.000
|
|
Totals: |
$26,604,181.400
|
$30,355,868.317
|
$32,990,955.360
|
$34,611,841.660
|
$35,656,889.941
|
$37,295,019.375
|
$38,155,320.450
|
$39,757,677.700
|
$46,893,811.548
|