Bid Cobra

HENDERSON BS 31H (0164-01-078)

Items: 40

County: HENDERSON
Length: 0.0000 MILES
Highway: BS 31H
District: TYLER
Control Number: 0164-01-078
DBE Goal: 0.0%
Project: F 2025(450)
Guaranty: $100,000.00
Time: 93 WORKING DAYS
Engineer's Estimate: $8,623,672.55
Date: 02/06/2025 (1 year ago)
Contract Number: 2253009
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00209061
Contract Type: Federal
Project Description: MILL EXISTING PFC, BASE REPAIR, RESURFACE 4” TY-C
Mail/Deliver Bids To: N/A
DANNY HENDERSON
EDUARDO CASTANEDA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$8,623,672.55
$8,087,241.20
Over/Under Est: -6.22% -$536,431.35
Over/Under Est: 0.63% $54,102.46
Amt Left: 7.3% $590,533.81
Over/Under Est: 1.76% $151,712.43
Amt Left: 8.51% $688,143.78
Delta: -1.12% -$97,609.97
Over/Under Est: 8.5% $733,230.95
Amt Left: 15.7% $1,269,662.30
Delta: -6.63% -$581,518.52
Subcontractor Percentage Amount
STRIPING TECHNOLOGY, L.P. 2.35% $190,934.88
BAHENA CONSTRUCTION CO., INC. 0.30% $24,374.67
DIAMOND ELITE BARRICADES, LLC 0.15% $12,187.33
MOBILE ENTERPRISES, INC. 0.13% $10,562.36
Total: 2.93% $238,059.24

Bid Items & Bid Tabulations

40 Total 0 of 40
HENDERSON  |  BS 31H  |  TYLER  |  0164-01-078  |  02/06/2025  |  $8,623,672.55  |  F 2025(450)  |  REHAB EXIST ROADWAY  |  93 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
EAST TEXAS BRIDGE, INC.
TEXAS MATERIALS GROUP, INC.
GREY SKY CONSTRUCTION LLC
REMOV CONC (CURB & GUTTER)
LF 1,500.000 $20.000 $35.000 $20.000 $17.000 $65.000
SP MIXES SP-C PG70-22
TON 1,332.000 $200.000 $215.000 $250.000 $250.000 $180.000
TACK COAT
GAL 1,816.000 $6.000 $4.000 $8.000 $4.000 $10.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 28,331.000 $190.000 $165.000 $190.000 $200.500 $215.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 3,500.000 $75.000 $75.000 $80.000 $80.000 $65.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,500.000 $95.000 $100.000 $110.000 $106.660 $85.000
PLANE ASPH CONC PAV(2")
SY 12,103.000 $4.000 $5.000 $3.250 $2.050 $3.500
PLAN ASPH CONC PAV (0.75")
SY 130,025.000 $2.000 $2.250 $3.000 $2.090 $2.500
PLAN ASPH CONC PAV (3.5")
SY 137,192.000 $5.500 $6.500 $5.000 $2.690 $3.500
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 208.000 $70.000 $75.000 $65.000 $52.000 $100.000
MOBILIZATION
LS 1.000 $784,000.000 $800,000.000 $640,000.000 $850,000.000 $900,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $15,000.000 $7,000.000 $25,000.000 $50,000.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 33.000 $350.000 $150.000 $200.000 $200.000 $150.000
TMA (STATIONARY)
DAY 75.000 $300.000 $300.000 $300.000 $600.000 $250.000
TMA (MOBILE OPERATION)
DAY 24.000 $350.000 $500.000 $300.000 $600.000 $550.000
CONC CURB & GUTTER (TY II)
LF 1,500.000 $60.000 $90.000 $50.000 $78.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 18,100.000 $0.500 $0.500 $0.550 $0.500 $1.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 72,336.000 $0.500 $0.400 $0.400 $0.350 $1.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 11,880.000 $0.500 $0.400 $0.400 $0.350 $1.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 82,200.000 $0.500 $0.400 $0.400 $0.350 $1.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 2,263.000 $2.500 $2.500 $3.000 $1.000 $1.500
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 1,485.000 $2.500 $2.500 $3.000 $1.000 $1.500
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 10,275.000 $2.500 $2.500 $3.000 $1.000 $1.500
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 520.000 $2.300 $2.000 $2.200 $2.000 $3.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,981.000 $1.650 $1.000 $1.100 $1.000 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,116.000 $9.000 $6.000 $6.000 $5.500 $20.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 9,050.000 $0.900 $1.000 $1.100 $1.000 $1.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 36,168.000 $0.800 $1.000 $0.820 $0.750 $1.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 5,940.000 $1.100 $1.000 $1.100 $1.000 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 41,100.000 $0.800 $1.000 $0.820 $0.750 $1.000
PREFAB PM TY C (W)(ARROW)
EA 54.000 $265.000 $250.000 $250.000 $215.000 $250.000
PREFAB PM TY C (W)(DBL ARROW)
EA 1.000 $300.000 $350.000 $350.000 $325.000 $500.000
PREFAB PM TY C (W)(WORD)
EA 21.000 $325.000 $250.000 $300.000 $240.000 $250.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 38.000 $75.000 $100.000 $80.000 $75.000 $250.000
PREFAB PM TY C (Y)(6")(SLD)
LF 290.000 $4.000 $5.000 $5.000 $4.000 $1.000
REFL PAV MRKR TY I-C
EA 1,148.000 $7.000 $5.000 $6.000 $5.000 $6.000
REFL PAV MRKR TY II-A-A
EA 1,268.000 $7.000 $5.000 $6.000 $5.000 $6.000
LITTER REMOVAL
CYC 2.000 $5,000.000 $5,000.000 $4,000.000 $5,000.000 $5,000.000
MEMBRANE UNDERSEAL
GAL 27,439.000 $6.000 $3.950 $7.000 $4.000 $4.000
REM/REPLACE DELINEATOR POST ASSEMBLY
EA 51.000 $200.000 $150.000 $200.000 $100.000 $100.000
Totals: $8,623,672.550 $8,087,241.200 $8,677,775.010 $8,775,384.980 $9,356,903.500