HEMPHILL US 60 (0030-05-073)

Items: 49

County: HEMPHILL
Length: N/A
Highway: US 60
District: AMARILLO
Control Number: 0030-05-073
DBE Goal: N/A
Project: BR 2022(398)
Guaranty: N/A
Time: 188 WORKING DAYS
Engineer's Estimate: $12,107,268.10
Date: 03/03/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$12,107,268.10
$8,566,511.52
Over/Under Est: -29.24% -$3,540,756.58
Over/Under Est: -14.35% -$1,737,899.10
Amt Left: 21.05% $1,802,857.48
Over/Under Est: -13.06% -$1,580,976.81
Amt Left: 22.88% $1,959,779.77
Delta: -1.51% -$156,922.29
$11,135,630.85
Over/Under Est: -8.03% -$971,637.25
Amt Left: 29.99% $2,569,119.33
Delta: -5.79% -$609,339.56
Over/Under Est: -7.59% -$919,157.10
Amt Left: 30.6% $2,621,599.48
Delta: -0.47% -$52,480.15
Subcontractor Percentage Amount
A-CORE CONCRETE CUTTING, INC. 2.31% $197,886.42
S & S BRIDGE PAINTING, INC. 1.93% $165,333.67
MACIAS SPECIALTY CONTRACTING LLC 1.42% $121,644.46
TRP CONSTRUCTION GROUP, LLC 0.88% $75,385.30
BARRICADES UNLIMITED 0.88% $75,385.30
ALAMO BROTHERS CONCRETE INC 0.84% $71,958.70
HJC FARMS, INC. 0.75% $64,248.84
FC TRAFFIC CONTROL, INC. 0.48% $41,119.26
NELSON INDUSTRIAL SERVICES, INC. 0.28% $23,986.23
Total: 9.77% $836,948.18

Bid Items & Bid Tabulations

49 Total 0 of 49
HEMPHILL  |  US 60  |  AMARILLO  |  0030-05-073  |  03/03/2022  |  $12,107,268.10  |  BR 2022(398)  |  BRIDGE MAINT  |  188 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
THE TRUESDELL CORPORATION
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
GILVIN-TERRILL, LTD.
AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC
PREPARING ROW
AC 1.710 $50,000.000 $9,500.000 $10,000.000 $35,000.000 $30,000.000 $25,000.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 34.000 $2,600.000 $475.000 $1,100.000 $1,000.000 $2,000.000 $1,800.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 5.000 $3,000.000 $1,500.000 $1,900.000 $1,000.000 $2,500.000 $3,600.000
PREP ROW (TREE) (2" TO 12" DIA)
EA 42.000 $810.000 $200.000 $360.000 $1,000.000 $1,500.000 $900.000
PREPARING ROW (HAND CLEARING)
AC 0.090 $50,000.000 $178,000.000 $105,000.000 $30,000.000 $100,000.000 $300,000.000
REMOVING CONC (RIPRAP)
SY 7.000 $50.000 $200.000 $600.000 $1,500.000 $250.000 $600.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 93.000 $50.000 $132.000 $120.000 $10.000 $250.000 $450.000
PLAN & TEXT CONC PAV(0" TO 1/2")
SY 1,459.000 $20.000 $12.000 $60.000 $65.000 $56.500 $60.000
FLOWABLE BACKFILL
CY 11.000 $250.000 $1,000.000 $1,350.000 $300.000 $1,750.000 $1,200.000
CL A CONC (FLUME)
CY 15.000 $650.000 $2,400.000 $2,000.000 $850.000 $2,500.000 $2,700.000
EPOXY WATERPROOF FINISH (TY X)
SF 15,822.000 $12.000 $5.500 $8.000 $15.000 $23.000 $6.500
PENETRATING CONCRETE SURFACE TREATMENT
SY 3,070.000 $32.000 $11.000 $16.000 $17.000 $30.000 $12.500
CONC STR REPAIR (EPOXY MORTAR)
SF 31.000 $200.000 $250.000 $350.000 $300.000 $600.000 $600.000
RIPRAP (CONC)(4 IN)
CY 89.000 $650.000 $814.000 $690.000 $800.000 $1,500.000 $750.000
CLEANING AND SEALING EXISTING JOINTS
LF 2,564.000 $39.000 $79.500 $90.000 $120.000 $110.000 $90.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 202.000 $50.000 $79.500 $45.000 $75.000 $115.000 $45.000
CLEAN & PAINT EXIST PILING (SYSTEM I-B)
LS 1.000 $30,000.000 $61,380.000 $140,000.000 $350,000.000 $265,000.000 $88,981.770
SHOT BLASTING
SY 745.000 $15.000 $10.000 $50.000 $15.000 $15.000 $200.000
REMOV STR (WOOD STR)
EA 2.000 $2,500.000 $500.000 $750.000 $250.000 $10,000.000 $4,000.000
MOBILIZATION
LS 1.000 $1,100,000.000 $396,000.000 $761,817.600 $650,000.000 $1,100,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $10,000.000 $6,200.000 $28,000.000 $1,600.000 $100,000.000 $27,000.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000 $25,000.000 $5,400.000 $8,500.000 $5,500.000 $9,000.000 $8,000.000
MTL W-BEAM GD FEN (STEEL POST)
LF 650.000 $45.000 $41.800 $47.000 $35.000 $38.000 $120.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $4,152.500 $3,900.000 $2,500.000 $3,775.000 $7,500.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 4.000 $1,200.000 $687.500 $1,700.000 $1,200.000 $625.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 725.000 $5.000 $3.300 $7.000 $4.000 $3.000 $7.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $350.000 $330.000 $1,300.000 $300.000 $300.000 $1,200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,822.500 $4,400.000 $3,600.000 $3,475.000 $7,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $450.000 $330.000 $700.000 $300.000 $300.000 $400.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 682.000 $1.500 $2.000 $5.000 $0.420 $2.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,183.000 $1.500 $2.000 $5.000 $0.450 $2.000 $1.000
REFL PAV MRK TY I (W)8"(LNDP)(090MIL)
LF 295.000 $1.000 $2.200 $2.100 $2.000 $2.000 $2.250
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 583.000 $1.000 $2.200 $2.100 $2.000 $2.000 $2.250
PAVEMENT SEALER 6"
LF 39,504.000 $0.400 $0.610 $0.600 $0.750 $0.550 $0.670
PAVEMENT SEALER 10"
LF 878.000 $1.000 $1.100 $1.100 $1.000 $1.000 $1.100
REFL PAV MRKR TY I-C
EA 167.000 $5.000 $11.000 $10.200 $10.000 $10.000 $12.000
ELIM EXT PAV MRK & MRKS (4")
LF 7,123.000 $1.000 $1.380 $2.600 $1.500 $1.250 $1.750
JT / CRCK SEAL (POLY MOD ASPH EMULSION)
LF 678.000 $40.000 $40.000 $27.000 $15.000 $30.000 $27.000
CRACK CLEANING AND SEALING (JCP)
LF 480.000 $70.000 $17.500 $43.000 $15.000 $30.000 $24.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 4.000 $250.000 $250.000 $700.000 $310.000 $1,000.000 $1,000.000
POLYESTER POLYMER CONC OVERLAY (1")
SY 71,440.000 $137.000 $99.750 $112.000 $116.000 $97.900 $115.000
INSTALL BAT HOUSE LARGE
EA 2.000 $4,000.000 $5,000.000 $3,500.000 $10,000.000 $25,000.000 $8,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $16,000.000 $20,400.000 $33,000.000 $1,500.000 $15,500.000 $24,000.000
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
LF 890.000 $0.700 $1.100 $1.100 $1.000 $1.000 $1.100
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
LF 26,756.000 $0.500 $0.990 $0.950 $1.000 $0.900 $1.000
HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL)
LF 2,720.000 $0.700 $1.100 $1.100 $1.000 $1.000 $1.100
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
LF 14,500.000 $0.500 $0.990 $0.950 $1.000 $0.900 $1.000
TMA (STATIONARY)
DAY 180.000 $300.000 $395.000 $360.000 $185.000 $380.000 $600.000
TMA (MOBILE OPERATION)
HR 200.000 $45.000 $105.000 $100.000 $95.000 $95.000 $95.000
Totals: $12,107,268.100 $8,566,511.520 $10,369,369.000 $10,526,291.290 $11,135,630.850 $11,188,111.000