Show Job Controls
Bid Cobra

HAYS FM 110 (3545-02-008)

Items: 110

County: HAYS
Length: N/A
Highway: FM 110
District: AUSTIN
Control Number: 3545-02-008
DBE Goal: N/A
Project: CC 3545-2-8
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $19,750,687.95
Date: 03/04/2020 (6 years ago)
Contract Number: N/A
Type: CONSTRUCT TWO LANES AND SHOULDERS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (9)
E
Engineer's Estimate
$19,750,687.95
$14,699,791.96
Over/Under Est: -25.57% -$5,050,895.99
$15,610,701.49
Over/Under Est: -20.96% -$4,139,986.46
Amt Left: 6.2% $910,909.53
$16,993,217.26
Over/Under Est: -13.96% -$2,757,470.69
Amt Left: 15.6% $2,293,425.30
Delta: -8.86% -$1,382,515.77
Over/Under Est: -13.32% -$2,630,836.67
Amt Left: 16.46% $2,420,059.32
Delta: -0.75% -$126,634.02
Over/Under Est: -12.98% -$2,564,439.49
Amt Left: 16.91% $2,486,456.50
Delta: -0.39% -$66,397.18
Over/Under Est: -9.93% -$1,961,930.40
Amt Left: 21.01% $3,088,965.59
Delta: -3.51% -$602,509.09
$18,092,169.55
Over/Under Est: -8.4% -$1,658,518.40
Amt Left: 23.08% $3,392,377.59
Delta: -1.71% -$303,412.00
Over/Under Est: -0.21% -$42,114.28
Amt Left: 34.07% $5,008,781.71
Delta: -8.93% -$1,616,404.12
$21,737,580.14
Over/Under Est: 10.06% $1,986,892.19
Amt Left: 47.88% $7,037,788.18
Delta: -10.30% -$2,029,006.47

Bid Items & Bid Tabulations

110 Total 0 of 110
HAYS  |  FM 110  |  AUSTIN  |  3545-02-008  |  03/04/2020  |  $19,750,687.95  |  CC 3545-2-8  |  CONSTRUCT TWO LANES AND SHOULDERS  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, L.L.C.
HUNTER INDUSTRIES, LTD.
WEBBER, LLC
JORDAN FOSTER CONSTRUCTION, LLC
ZACHRY CONSTRUCTION CORPORATION
AUSTIN BRIDGE & ROAD SERVICES, LP
FLUOR HEAVY CIVIL, LLC
FLATIRON CONSTRUCTION CORP.
BRIDGES AND ROADS, LLC
PREPARING ROW
STA 139.410 $2,000.000 $9,650.000 $4,303.850 $9,450.330 $8,615.000 $8,988.110 $3,906.000 $10,500.000 $12,000.000 $1,568.000
EXCAVATION (ROADWAY)
CY 217,114.000 $7.500 $4.210 $5.700 $4.680 $4.500 $7.000 $6.860 $7.000 $9.000 $6.100
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 217,704.000 $7.500 $1.550 $5.090 $3.810 $4.180 $9.000 $3.070 $3.300 $4.000 $9.600
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 95,258.000 $12.000 $11.510 $14.940 $19.740 $22.000 $17.000 $18.280 $10.400 $23.700 $19.300
FURNISH AND PLACE TOPSOIL (5")
SY 240,154.000 $3.000 $0.090 $1.010 $0.500 $1.100 $0.820 $1.470 $1.270 $0.880 $1.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 330,874.000 $0.100 $0.100 $0.100 $0.160 $0.110 $0.100 $0.190 $0.100 $0.100 $0.100
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 330,874.000 $0.100 $0.070 $0.070 $0.080 $0.070 $0.070 $0.150 $0.070 $0.070 $0.100
VEGETATIVE WATERING
MG 9,926.200 $20.000 $18.360 $8.760 $30.500 $0.010 $22.560 $23.000 $22.850 $22.560 $15.600
WILDFLOWER SEEDING
AC 68.370 $1,200.000 $983.740 $983.740 $985.000 $1,000.000 $983.740 $1,269.000 $996.400 $983.740 $1,457.100
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 17,037.000 $45.000 $32.690 $32.390 $32.520 $39.000 $35.650 $38.370 $39.450 $37.210 $32.200
PRIME COAT (MULTI OPTION)
GAL 14,751.000 $4.000 $3.500 $3.450 $4.230 $3.500 $4.230 $3.500 $3.550 $3.500 $4.000
TOM (ASPHALT) PG 76-22
TON 251.000 $125.000 $100.000 $90.710 $95.910 $102.000 $95.910 $100.000 $101.290 $100.000 $110.300
TOM - C (AGGREGATE) SAC - B
TON 3,794.000 $100.000 $100.000 $90.710 $95.910 $102.000 $95.910 $100.000 $101.290 $100.000 $110.300
TACK COAT
GAL 5,732.000 $6.000 $2.850 $2.840 $3.460 $2.900 $3.460 $2.850 $2.890 $2.850 $2.700
CEM STABIL BKFL
CY 392.000 $150.000 $14.470 $137.800 $120.000 $108.000 $125.000 $133.600 $98.510 $112.000 $103.300
TEMPORARY SPL SHORING
SF 91,414.000 $15.000 $0.280 $0.710 $1.000 $0.010 $0.500 $0.820 $0.810 $2.290 $17.500
TEMPORARY SPL SHORING (COFFERDAM)
SF 1,386.000 $25.000 $134.640 $53.100 $42.970 $33.270 $9.690 $24.550 $30.810 $0.010 $122.200
DRILL SHAFT (18 IN)
LF 204.000 $100.000 $125.000 $136.230 $72.210 $117.000 $74.640 $113.040 $45.060 $107.040 $131.600
DRILL SHAFT (36 IN)
LF 694.000 $200.000 $225.000 $199.990 $165.400 $180.000 $149.560 $177.180 $173.890 $163.560 $247.100
DRILL SHAFT (42 IN)
LF 552.000 $250.000 $325.000 $248.790 $205.610 $220.000 $204.770 $233.450 $238.950 $208.340 $261.100
DRILL SHAFT (48 IN)
LF 636.000 $360.000 $425.000 $310.830 $261.570 $265.000 $259.320 $274.380 $313.690 $248.600 $288.800
CL C CONC (ABUT)
CY 99.200 $900.000 $594.220 $800.000 $844.680 $835.000 $1,051.370 $1,091.410 $959.550 $916.710 $701.900
CL C CONC (CAP)
CY 199.200 $1,050.000 $648.290 $915.000 $954.540 $900.000 $1,228.920 $1,076.840 $1,259.610 $1,339.790 $901.700
CL C CONC (COLUMN)
CY 196.900 $900.000 $736.550 $850.000 $810.200 $800.000 $1,287.550 $878.880 $1,202.940 $1,076.880 $719.200
CL C CONC (CURB)
CY 1.000 $3,000.000 $1,966.710 $1,000.000 $4,990.560 $1,400.000 $2,105.570 $2,120.000 $2,358.650 $1,100.000 $1,633.100
CL C CONC (WEBWALL)
CY 234.900 $700.000 $749.900 $800.000 $644.610 $980.000 $1,021.350 $1,050.840 $1,085.530 $1,386.610 $530.200
REINF CONC SLAB
SF 52,414.000 $15.000 $15.290 $15.000 $13.980 $14.500 $12.000 $14.570 $16.500 $16.030 $18.400
APPROACH SLAB
CY 145.700 $470.000 $388.990 $450.000 $451.210 $310.000 $397.880 $449.800 $433.390 $397.260 $524.300
PRESTR CONC GIRDER (TX54)
LF 4,998.580 $150.000 $131.750 $130.000 $128.300 $142.000 $128.540 $118.100 $161.920 $137.660 $155.500
PRESTR CONC GIRDER (TX70)
LF 1,790.320 $175.000 $129.600 $145.000 $228.690 $180.000 $128.530 $120.810 $167.860 $184.570 $155.500
RIPRAP (CONC)(5 IN)
CY 171.000 $500.000 $477.340 $420.000 $449.900 $425.000 $319.800 $447.090 $316.310 $449.900 $437.900
RIPRAP (STONE PROTECTION)(18 IN)
CY 296.000 $135.000 $147.170 $175.000 $138.450 $95.000 $221.080 $145.470 $90.660 $125.480 $140.400
RIPRAP (STONE PROTECTION)(21 IN)
CY 5,155.000 $150.000 $141.070 $125.000 $128.750 $95.000 $150.000 $127.640 $90.810 $123.520 $130.600
RIPRAP (STONE PROTECTION) (36 IN)
CY 40.000 $200.000 $189.330 $350.000 $225.000 $150.000 $400.000 $650.930 $200.000 $131.570 $228.200
RIPRAP (MOW STRIP)(4 IN)
CY 27.000 $450.000 $352.400 $590.330 $479.900 $500.000 $556.500 $484.520 $314.280 $479.900 $473.200
RAIL (TY T223)
LF 1,837.800 $100.000 $47.330 $108.220 $105.900 $92.000 $138.790 $116.260 $149.900 $131.070 $90.200
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 255.000 $120.000 $94.580 $120.190 $117.880 $112.000 $121.040 $121.880 $131.400 $109.990 $136.300
GABIONS (3' X 3')(GALV)
CY 11.000 $215.000 $292.900 $288.730 $265.000 $365.000 $1,684.030 $394.230 $227.920 $471.600 $253.500
GABIONS (5'X 3')(GALV)
CY 133.000 $300.000 $249.760 $288.730 $265.000 $335.000 $301.160 $365.410 $182.310 $374.020 $253.500
CONC BOX CULV (8 FT X 4 FT)
LF 456.000 $500.000 $406.520 $500.000 $493.730 $590.000 $501.600 $425.000 $702.210 $700.000 $656.400
CONC BOX CULV (10 FT X 5 FT)
LF 730.000 $700.000 $499.170 $800.000 $744.750 $835.000 $740.210 $510.000 $766.290 $900.000 $984.100
RC PIPE (CL III)(24 IN)
LF 68.000 $70.000 $80.980 $149.850 $126.330 $80.000 $60.000 $74.000 $80.550 $90.150 $107.800
SET (TY I)(S=10 FT)(HW=6FT)(4:1)(C)
EA 10.000 $20,000.000 $1.000 $12,000.000 $6,187.980 $7,200.000 $3,932.750 $6,000.000 $6,055.680 $6,003.620 $16,681.900
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C)
EA 6.000 $13,000.000 $1.000 $6,500.000 $3,738.320 $5,300.000 $3,368.720 $5,500.000 $6,003.420 $3,496.500 $8,720.400
SET (TY I)(S= 8 FT)(HW= 5 FT)(6:1) (C)
EA 6.000 $17,000.000 $1.000 $9,000.000 $7,908.320 $10,435.000 $5,221.550 $7,000.000 $8,402.700 $7,666.500 $12,170.100
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,250.000 $1,544.620 $3,000.000 $2,339.240 $1,800.000 $999.060 $1,250.000 $1,746.540 $1,093.550 $2,190.200
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $1,500.000 $1,669.620 $3,000.000 $2,531.470 $1,800.000 $999.060 $1,650.000 $1,972.950 $1,394.260 $2,384.500
SET (TY I)(S=10FT)(HW=6FT)(6:1)(C)
EA 10.000 $27,000.000 $1.000 $12,000.000 $7,138.990 $8,800.000 $4,921.390 $7,500.000 $7,908.390 $7,121.370 $20,626.900
MOBILIZATION
LS 1.000 $1,300,000.000 $1,355,956.200 $1,300,000.000 $1,500,000.000 $1,500,000.000 $600,000.000 $1,583,000.000 $1,600,000.000 $1,602,000.000 $2,420,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $3,000.000 $3,711.670 $5,000.000 $6,785.230 $2,000.000 $3,580.010 $25,500.000 $996.770 $8,444.880 $977.400
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 654.000 $50.000 $93.140 $93.140 $63.240 $53.000 $93.140 $60.000 $94.340 $93.140 $64.100
ROCK FILTER DAMS (REMOVE)
LF 654.000 $10.000 $21.230 $21.230 $17.460 $10.250 $21.230 $8.710 $21.500 $21.210 $17.700
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 300.000 $20.000 $23.790 $23.790 $11.200 $12.500 $23.790 $22.040 $24.100 $23.790 $11.400
CONSTRUCTION EXITS (REMOVE)
SY 300.000 $10.000 $8.050 $8.050 $4.880 $2.000 $8.050 $9.500 $8.150 $8.050 $4.900
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,688.000 $2.500 $1.960 $1.960 $2.210 $1.800 $1.960 $2.000 $1.990 $1.960 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,688.000 $0.750 $0.630 $0.630 $0.350 $0.650 $0.630 $0.490 $0.640 $0.630 $0.400
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 860.000 $5.000 $5.940 $5.940 $5.410 $5.350 $5.940 $6.840 $6.020 $5.940 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 860.000 $1.000 $1.050 $1.050 $0.820 $1.020 $1.050 $1.270 $1.060 $1.050 $0.800
DRIVEWAYS (ACP)
SY 425.000 $45.000 $51.710 $30.660 $46.790 $48.000 $51.760 $43.370 $43.550 $35.000 $54.100
MTL W-BEAM GD FEN (TIM POST)
LF 275.000 $25.000 $30.320 $20.750 $20.750 $22.700 $20.750 $20.750 $22.030 $20.000 $21.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $1,850.000 $1,465.000 $1,465.000 $1,600.000 $1,465.000 $1,465.000 $1,534.500 $1,500.000 $1,485.500
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,700.000 $2,865.000 $2,830.000 $2,830.000 $2,850.000 $2,830.000 $2,830.000 $2,765.140 $2,500.000 $2,869.600
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $500.000 $479.000 $479.000 $498.500 $495.000 $479.000 $498.500 $576.580 $491.280 $505.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 16.000 $600.000 $521.000 $521.000 $576.630 $535.000 $521.000 $576.630 $704.760 $534.360 $584.700
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $700.000 $610.000 $610.000 $690.480 $620.000 $610.000 $690.480 $1,063.980 $625.640 $700.100
INSTL OM ASSM (OM-2X)(WC)GND
EA 8.000 $60.000 $45.000 $45.000 $55.320 $47.000 $45.000 $55.320 $46.540 $46.150 $56.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,999.000 $1.000 $0.670 $0.750 $0.750 $0.720 $0.670 $0.670 $0.760 $0.750 $0.700
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,281.000 $3.000 $2.110 $2.880 $2.880 $2.150 $2.110 $2.110 $2.920 $4.000 $2.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 148.000 $7.000 $5.000 $5.750 $5.750 $5.200 $5.000 $5.000 $5.820 $8.000 $5.100
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 8.000 $130.000 $124.000 $110.000 $110.000 $128.000 $124.000 $124.000 $111.420 $500.000 $125.700
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 8.000 $150.000 $143.000 $165.000 $165.000 $147.000 $143.000 $143.000 $167.120 $500.000 $145.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 125.000 $6.000 $5.000 $5.750 $5.750 $5.200 $5.000 $5.000 $5.820 $8.000 $5.100
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
LF 4,903.000 $1.250 $0.600 $0.330 $0.330 $0.620 $0.600 $0.600 $0.330 $0.500 $0.600
REFL PAV MRK TY II (W) 4" (SLD)
LF 28,072.000 $0.150 $0.120 $0.100 $0.100 $0.120 $0.120 $0.120 $0.100 $0.120 $0.100
REFL PAV MRK TY II (W) 8" (SLD)
LF 2,999.000 $0.500 $0.400 $0.200 $0.200 $0.410 $0.400 $0.400 $0.200 $0.300 $0.400
REFL PAV MRK TY II (W) 12" (SLD)
LF 1,281.000 $1.500 $1.330 $1.400 $1.400 $1.370 $1.330 $1.330 $1.420 $1.000 $1.300
REFL PAV MRK TY II (W) 24" (SLD)
LF 80.000 $3.000 $4.000 $2.900 $2.900 $4.150 $4.000 $4.000 $2.940 $1.500 $4.100
REFL PAV MRK TY II (W) (ARROW)
EA 10.000 $70.000 $60.000 $45.000 $45.000 $62.000 $60.000 $60.000 $45.580 $40.000 $60.800
REFL PAV MRK TY II (W) (WORD)
EA 10.000 $80.000 $60.000 $65.000 $65.000 $62.000 $60.000 $60.000 $65.840 $50.000 $60.800
REFL PAV MRK TY II (Y) 4" (BRK)
LF 2,219.000 $0.150 $0.150 $0.100 $0.100 $0.160 $0.150 $0.150 $0.100 $0.120 $0.200
REFL PAV MRK TY II (Y) 4" (SLD)
LF 24,626.000 $0.150 $0.120 $0.100 $0.100 $0.130 $0.120 $0.120 $0.100 $0.120 $0.100
REFL PAV MRK TY II (Y) 24" (SLD)
LF 125.000 $3.000 $3.000 $2.900 $2.900 $3.100 $3.000 $3.000 $2.940 $1.500 $3.000
REFL PAV MRK TY II (BLACK) 4"(SHADOW)
LF 4,903.000 $0.350 $0.250 $0.150 $0.150 $0.250 $0.250 $0.250 $0.150 $0.250 $0.300
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 28,072.000 $0.350 $0.320 $0.330 $0.330 $0.340 $0.320 $0.320 $0.330 $0.380 $0.300
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,090.000 $0.400 $0.400 $0.340 $0.340 $0.420 $0.400 $0.400 $0.340 $0.380 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 31,399.000 $0.400 $0.320 $0.340 $0.340 $0.340 $0.320 $0.320 $0.340 $0.380 $0.300
REFL PAV MRKR TY I-C
EA 154.000 $4.000 $4.000 $2.900 $2.900 $4.150 $4.000 $4.000 $2.940 $3.500 $4.100
REFL PAV MRKR TY II-A-A
EA 1,110.000 $3.500 $3.110 $2.900 $2.900 $3.280 $3.110 $3.110 $2.940 $3.500 $3.200
ELIM EXT PAV MRK & MRKS (4")
LF 1,823.000 $0.500 $1.400 $0.600 $2.000 $1.450 $1.400 $1.400 $0.610 $2.000 $1.400
TEMP TRAF SIGNALS
EA 1.000 $45,000.000 $59,000.000 $50,000.000 $59,595.960 $61,000.000 $81,500.000 $81,500.000 $82,042.720 $82,323.230 $82,641.000
FULL - WIDTH MOWING
AC 68.370 $150.000 $140.000 $85.000 $400.000 $365.000 $300.000 $171.000 $166.400 $300.000 $121.900
NO. OF WORKING DAYS
$/D 6,500.000 $300.000 $200.000 $200.000 $212.000 $240.000 $178.000 $300.000 $300.000 $220.000 $275.000
TREE PROTECTION
EA 1.000 $500.000 $1,711.180 $350.000 $2,000.000 $780.000 $2,648.910 $200.000 $2,025.750 $250.000 $447.000
D-GR HMA TY-B PG64-22
TON 16,222.000 $65.000 $67.000 $53.180 $60.540 $70.580 $60.540 $67.000 $67.860 $67.000 $70.800
D-GR HMA TY-D PG76-22
TON 5,933.000 $80.000 $85.000 $61.760 $72.910 $89.540 $72.910 $85.000 $86.090 $85.000 $90.500
TACK COAT
GAL 10,917.000 $6.000 $2.850 $2.870 $3.460 $2.950 $3.460 $2.850 $2.890 $2.850 $2.700
TEMP CONSTRUCTION ACCESS
LS 1.000 $150,000.000 $59,122.710 $26,280.000 $128,357.470 $110,000.000 $258,100.830 $398,000.000 $254,221.960 $96,451.920 $486,126.600
GEOGRID BASE REINFORCEMENT (TY II)
SY 76,664.000 $1.500 $1.000 $1.020 $1.090 $1.120 $1.020 $0.950 $2.000 $1.090 $1.400
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,000.000 $950.000 $7,500.000 $12,174.520 $3,600.000 $16,508.130 $9,500.000 $16,264.720 $17,320.000 $16,739.200
DEAD END ROADWAY BARRICADE
LF 74.000 $100.000 $39.000 $95.000 $175.000 $40.000 $57.920 $93.230 $47.290 $40.000 $94.500
TMA (STATIONARY)
DAY 300.000 $200.000 $96.880 $50.000 $330.000 $0.010 $108.330 $420.080 $164.560 $350.000 $213.900
VIVDS TEMPORARY
EA 1.000 $15,000.000 $15,000.000 $15,000.000 $16,401.520 $15,500.000 $15,600.000 $15,600.000 $15,800.820 $15,757.580 $15,818.400
TESTING & DISINFECTION
EA 1.000 $3,000.000 $11,778.000 $11,551.880 $5,847.900 $2,000.000 $1,700.000 $7,000.000 $3,668.270 $1,700.000 $12,571.500
CUT AND PLUG EXIST WL (8")
EA 2.000 $2,000.000 $13,451.000 $13,192.760 $5,765.020 $265.000 $305.000 $700.000 $1,161.440 $305.000 $14,357.200
PIPE (4") PVC C-900 DR-14 (ALL DEPTHS)
LF 1,403.000 $30.000 $38.000 $37.100 $32.520 $32.000 $43.000 $55.000 $12.620 $43.000 $40.600
PIPE ENCASEMENT (16")STEEL
LF 450.000 $100.000 $86.000 $84.800 $146.510 $78.000 $76.000 $150.000 $36.330 $76.000 $91.800
WET CONNECTION 12 DIA X 12 DIA
EA 2.000 $2,000.000 $3,171.000 $3,110.040 $3,218.280 $1,900.000 $5,740.000 $3,800.000 $1,200.280 $5,740.000 $3,384.600
DUCTILE IRON FITTINGS
TON 0.750 $5,000.000 $7,278.000 $7,138.040 $18,490.270 $1,900.000 $4,795.000 $18,000.000 $3,822.600 $4,795.000 $7,768.300
VALVE (GATE)(4")
EA 2.000 $3,000.000 $1,692.000 $1,659.960 $4,430.410 $1,000.000 $950.000 $1,100.000 $869.680 $950.000 $1,806.000
BORE OR JACK PIPE(STEEL)(20")
LF 35.000 $120.000 $624.000 $611.620 $1,451.230 $400.000 $320.000 $500.000 $185.730 $320.000 $666.000
Totals: $19,750,687.950 $14,699,791.997 $15,610,701.510 $16,993,217.303 $17,119,851.282 $17,186,248.510 $17,788,757.593 $18,092,169.593 $19,708,573.710 $21,737,580.155