Show Job Controls
Bid Cobra

HAYS FM 2770 (3210-01-019)

Items: 63

County: HAYS
Length: N/A
Highway: FM 2770
District: AUSTIN
Control Number: 3210-01-019
DBE Goal: N/A
Project: STP 2023(068)HES
Guaranty: N/A
Time: 80 WORKING DAYS
Engineer's Estimate: $1,540,030.60
Date: 10/07/2022 (3 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
MARK BAUMANN
SHANE SWIMM
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$1,540,030.60
$1,394,023.95
Over/Under Est: -9.48% -$146,006.65
Over/Under Est: -3.15% -$48,447.70
Amt Left: 7% $97,558.95
Over/Under Est: -0.62% -$9,537.60
Amt Left: 9.79% $136,469.05
Delta: -2.61% -$38,910.10
Over/Under Est: 2.81% $43,256.92
Amt Left: 13.58% $189,263.57
Delta: -3.45% -$52,794.52
Over/Under Est: 18.16% $279,611.00
Amt Left: 30.53% $425,617.65
Delta: -14.93% -$236,354.08
$2,047,158.41
Over/Under Est: 32.93% $507,127.81
Amt Left: 46.85% $653,134.46
Delta: -12.50% -$227,516.81

Bid Items & Bid Tabulations

63 Total 0 of 63
HAYS  |  FM 2770  |  AUSTIN  |  3210-01-019  |  10/07/2022  |  $1,540,030.60  |  STP 2023(068)HES  |  WIDEN ROAD - ADD LANES  |  80 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
AARON CONCRETE CONTRACTORS, L.P.
COX COMMERCIAL CONSTRUCTION LLC
TEXAS MATERIALS GROUP, INC.
AUSTIN UNDERGROUND INCORPORATED
DAN WILLIAMS COMPANY
PREPARING ROW
STA 32.400 $3,000.000 $999.030 $800.000 $3,500.000 $1,400.000 $550.000 $6,200.000
REMOVING CONC (DRIVEWAYS)
SY 460.000 $22.000 $20.520 $40.000 $30.000 $21.250 $22.000 $20.000
REMOVING STAB BASE & ASPH PAV(14")
SY 542.000 $12.000 $10.260 $21.000 $30.000 $14.450 $30.000 $20.000
EXCAVATION (ROADWAY)
CY 2,855.000 $16.000 $17.100 $17.000 $18.000 $14.000 $26.000 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 2,965.000 $20.000 $16.890 $12.000 $13.000 $22.250 $15.000 $45.000
EMBANKMENT (FINAL)(ORD COMP)(TY C1)
CY 1,787.000 $25.000 $53.670 $71.000 $55.000 $61.000 $68.000 $75.000
FURNISHING AND PLACING TOPSOIL (4")
SY 13,908.000 $2.500 $1.350 $1.300 $2.000 $2.000 $1.750 $1.250
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 13,908.000 $0.300 $0.390 $0.400 $0.400 $0.670 $0.750 $0.370
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 13,908.000 $0.250 $0.360 $0.400 $0.400 $0.670 $0.400 $0.350
VEGETATIVE WATERING
MG 23.500 $25.000 $77.400 $35.000 $20.000 $100.000 $50.000 $25.500
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 13,908.000 $2.000 $1.190 $1.300 $1.100 $2.600 $3.000 $1.200
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 1,581.000 $46.000 $33.390 $41.000 $37.000 $35.550 $65.000 $40.000
CEM STABIL BKFL
CY 8.000 $100.000 $230.000 $267.000 $250.000 $200.000 $330.000 $275.000
CL C CONC (COLLAR)
EA 2.000 $1,500.000 $2,800.000 $922.000 $6,000.000 $2,540.000 $1,100.000 $1,000.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 8.000 $225.000 $380.000 $405.000 $640.000 $400.000 $530.000 $450.000
RC PIPE (ARCH)(CL III)(DES 4)
LF 22.000 $300.000 $500.000 $500.000 $450.000 $588.000 $650.000 $450.000
HEADWALL (CH - PW - A - 0) (DES= 4)
EA 1.000 $9,500.000 $16,000.000 $17,000.000 $6,000.000 $18,200.000 $24,000.000 $15,000.000
SET (TY II) (18 IN) (HDPE) (6: 1) (P)
EA 8.000 $1,650.000 $1,500.000 $2,100.000 $2,500.000 $2,400.000 $2,800.000 $1,800.000
SET (TY II) (24 IN) (HDPE) (6: 1) (P)
EA 2.000 $1,950.000 $2,500.000 $2,400.000 $3,500.000 $2,800.000 $3,200.000 $2,200.000
SET (TY II) (DES 4) (RCP) (4: 1) (C)
EA 1.000 $4,000.000 $3,500.000 $7,400.000 $6,500.000 $6,500.000 $5,400.000 $7,500.000
REMOV STR (SET)
EA 6.000 $300.000 $650.000 $1,300.000 $850.000 $360.000 $600.000 $350.000
REMOV STR (PIPE)
LF 217.000 $15.000 $22.000 $46.000 $30.000 $18.000 $35.000 $25.000
MOBILIZATION
LS 1.000 $124,000.000 $133,500.000 $100,000.000 $135,000.000 $156,030.000 $72,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $6,000.000 $9,000.000 $4,500.000 $3,000.000 $14,840.000 $9,500.000 $40,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $40.000 $44.190 $48.000 $45.000 $39.000 $60.000 $43.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 199.000 $35.000 $48.720 $53.000 $55.000 $94.000 $70.000 $47.000
ROCK FILTER DAMS (REMOVE)
LF 267.000 $15.000 $18.410 $20.000 $5.000 $22.500 $5.000 $17.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 812.000 $25.000 $25.490 $28.000 $15.000 $21.000 $17.000 $24.750
CONSTRUCTION EXITS (REMOVE)
SY 812.000 $12.000 $12.460 $14.000 $5.000 $12.500 $5.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,645.000 $4.150 $4.820 $5.200 $2.500 $3.400 $3.500 $3.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,645.000 $1.500 $1.300 $1.400 $0.500 $0.500 $0.350 $1.250
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $5.250 $5.720 $6.200 $15.000 $10.000 $12.500 $5.550
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.000 $1.980 $2.100 $5.000 $1.000 $3.000 $1.900
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
LF 18.000 $75.000 $50.990 $55.000 $45.000 $130.000 $60.000 $49.500
INTERSECTIONS (ACP)
SY 450.000 $60.000 $49.500 $92.000 $110.000 $97.000 $95.000 $95.000
DRIVEWAYS (CONC)
SY 498.000 $115.000 $95.000 $100.000 $105.000 $103.000 $95.000 $120.000
DRIVEWAYS (ACP)
SY 203.000 $100.000 $49.500 $57.000 $80.000 $100.000 $70.000 $65.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $725.000 $611.820 $655.000 $600.000 $620.000 $600.000 $850.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $75.000 $882.710 $945.000 $900.000 $895.000 $300.000 $685.000
REMOVE SM RD SN SUP&AM
EA 4.000 $250.000 $107.120 $115.000 $100.000 $109.000 $175.000 $285.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 2.000 $90.000 $89.610 $96.000 $90.000 $91.000 $350.000 $68.750
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 6,984.000 $1.400 $0.790 $1.000 $1.000 $0.750 $1.000 $0.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 6,984.000 $1.400 $0.790 $1.000 $1.000 $0.930 $1.000 $0.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 31.000 $20.000 $11.080 $18.000 $20.000 $13.650 $18.000 $20.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $250.000 $721.000 $265.000 $250.000 $155.000 $225.000 $500.000
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 7,361.000 $0.850 $0.790 $0.750 $0.700 $1.300 $1.750 $1.500
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 1,360.000 $1.000 $0.790 $1.100 $1.000 $0.640 $1.000 $1.200
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 8,723.000 $1.000 $0.790 $0.750 $0.700 $1.400 $2.000 $1.200
REFL PAV MRKR TY II-A-A
EA 282.000 $1.000 $11.080 $8.800 $10.000 $4.200 $5.500 $10.000
ELIM EXT PAV MRK & MRKS (4")
LF 6,696.000 $0.650 $0.720 $0.400 $0.500 $0.630 $0.900 $0.500
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 2,235.000 $135.000 $91.620 $120.000 $105.000 $97.000 $175.000 $115.000
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 100.000 $230.000 $134.640 $320.000 $300.000 $175.000 $315.000 $350.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 817.000 $150.000 $118.260 $150.000 $135.000 $133.000 $185.000 $145.000
TOM-C PG76-22 SAC-B
TON 895.000 $185.000 $150.660 $180.000 $155.000 $185.000 $275.000 $165.000
BONDING COURSE
GAL 733.000 $5.000 $4.550 $4.700 $5.000 $4.250 $6.250 $4.500
UNDERSEAL COURSE
GAL 1,483.000 $5.000 $4.550 $4.700 $5.000 $4.000 $6.250 $4.500
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 60.000 $76.000 $143.360 $114.000 $100.000 $154.000 $110.000 $130.000
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
LF 220.000 $50.000 $104.890 $100.000 $80.000 $106.000 $110.000 $110.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 300.000 $100.000 $93.620 $55.000 $55.000 $60.000 $50.000 $120.000
TMA (STATIONARY)
DAY 120.000 $245.000 $234.050 $94.000 $500.000 $150.000 $100.000 $195.000
TMA (MOBILE OPERATION)
HR 80.000 $100.000 $260.050 $55.000 $75.000 $75.000 $150.000 $65.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 10.000 $700.000 $3,600.000 $2,400.000 $900.000 $1,750.000 $900.000 $335.000
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 5.000 $1,200.000 $3,600.000 $3,100.000 $3,000.000 $3,200.000 $2,200.000 $680.000
Totals: $1,540,030.600 $1,394,023.952 $1,491,582.900 $1,530,493.000 $1,583,287.520 $1,819,641.600 $2,047,158.410