Show Job Controls
Bid Cobra

HAYS RM 150 (1197-01-021)

Items: 91

County: HAYS
Length: N/A
Highway: RM 150
District: AUSTIN
Control Number: 1197-01-021
DBE Goal: N/A
Project: STP 2022(271)HES
Guaranty: N/A
Time: 215 WORKING DAYS
Engineer's Estimate: $3,079,452.60
Date: 01/07/2022 (4 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$3,079,452.60
$3,601,690.88
Over/Under Est: 16.96% $522,238.28
Over/Under Est: 30.16% $928,810.48
Amt Left: 11.29% $406,572.20
Over/Under Est: 60.22% $1,854,508.70
Amt Left: 36.99% $1,332,270.42
Delta: -23.09% -$925,698.22

Bid Items & Bid Tabulations

91 Total 0 of 91
HAYS  |  RM 150  |  AUSTIN  |  1197-01-021  |  01/07/2022  |  $3,079,452.60  |  STP 2022(271)HES  |  HAZARD ELIM & SAFETY  |  215 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
HUNTER INDUSTRIES, LTD.
AARON CONCRETE CONTRACTORS, L.P.
PREPARING ROW
STA 133.000 $1,589.000 $630.000 $1,341.990 $3,500.000
REMOVING CONC (DRIVEWAYS)
SY 121.000 $14.000 $24.000 $23.310 $32.000
EXCAVATION (ROADWAY)
CY 3,278.000 $14.000 $19.350 $44.700 $31.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 11,159.000 $10.000 $35.300 $30.660 $31.000
FURNISHING AND PLACING TOPSOIL (4")
SY 63,258.000 $2.000 $1.900 $3.290 $2.000
BLOCK SODDING
SY 2,872.000 $4.000 $6.000 $5.780 $7.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 63,258.000 $0.250 $0.200 $0.170 $0.200
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 63,258.000 $0.080 $0.200 $0.140 $0.200
VEGETATIVE WATERING
MG 111.000 $23.000 $34.000 $16.650 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 63,258.000 $1.500 $1.300 $0.830 $1.500
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 3,531.000 $45.000 $92.500 $81.380 $110.000
PRIME COAT (MULTI OPTION)
GAL 3,174.000 $4.000 $4.500 $7.620 $5.000
TOM (ASPHALT) PG 76-22
TON 181.600 $91.000 $138.000 $118.540 $150.000
TOM - C (AGGREGATE) SAC - B
TON 2,731.900 $83.000 $138.000 $118.530 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 100.000 $26.000 $57.000 $192.720 $200.000
CUT & RESTORING PAV
SY 143.000 $130.000 $330.000 $181.880 $170.000
TRENCH EXCAVATION PROTECTION
LF 234.000 $5.000 $20.000 $25.920 $9.000
TEMPORARY SPL SHORING
SF 1,424.000 $27.000 $14.000 $18.150 $70.000
CL C CONC (COLLAR)
EA 8.000 $793.000 $1,374.000 $1,781.560 $3,400.000
RIPRAP (CONC)(6 IN)
CY 6.000 $392.000 $665.000 $861.000 $670.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 47.000 $130.000 $165.000 $160.690 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 95.000 $522.000 $505.000 $653.840 $550.000
CONC BOX CULV (3 FT X 2 FT)
LF 104.000 $196.000 $259.600 $336.610 $400.000
CONC BOX CULV (8 FT X 3 FT)(EXTEND)
LF 20.000 $800.000 $989.000 $1,282.360 $2,000.000
RC PIPE (CL III)(18 IN)
LF 132.000 $65.000 $70.000 $90.750 $150.000
RC PIPE (CL III)(24 IN)
LF 204.000 $68.000 $101.000 $130.960 $160.000
RC PIPE (CL III)(30 IN)
LF 48.000 $87.000 $158.000 $204.860 $220.000
RC PIPE (CL III)(36 IN)
LF 148.000 $120.000 $229.700 $297.830 $250.000
RC PIPE (ARCH)(CL III)(DES 2)
LF 96.000 $165.000 $145.800 $189.040 $300.000
RC PIPE (ARCH)(CL III)(DES 3)
LF 321.000 $165.000 $170.000 $220.410 $275.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 4.000 $2,800.000 $4,990.000 $6,470.150 $15,000.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $5,946.000 $7,490.000 $9,711.710 $19,000.000
HEADWALL (CH - PW - A - 0) (DES= 3)
EA 2.000 $4,590.000 $3,490.000 $4,525.210 $14,500.000
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 2.000 $5,000.000 $17,000.000 $11,397.320 $21,000.000
WINGWALL (PW - 1) (HW=3 FT)
EA 1.000 $7,115.000 $1,890.000 $2,450.620 $26,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $13,522.000 $12,690.000 $16,454.150 $25,500.000
SET (TY I)(S=3 FT)(HW=2FT)(6:1)(P)
EA 2.000 $6,698.000 $6,490.000 $8,415.090 $19,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $860.000 $1,590.000 $2,061.630 $2,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $1,600.000 $2,290.000 $2,969.260 $2,600.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,400.000 $2,990.000 $3,876.900 $3,400.000
SET (TY II) (DES 2) (RCP) (6: 1) (P)
EA 6.000 $2,900.000 $2,190.000 $2,839.610 $2,100.000
SET (TY II) (DES 3) (RCP) (4: 1) (P)
EA 3.000 $2,350.000 $2,290.000 $2,969.260 $2,700.000
SET (TY II) (DES 3) (RCP) (6: 1) (P)
EA 10.000 $3,200.000 $2,390.000 $3,098.930 $2,600.000
REMOV STR (SET)
EA 38.000 $372.000 $368.000 $477.160 $800.000
REMOV STR (PIPE)
LF 639.000 $15.000 $23.500 $30.430 $60.000
REMOV STR (BOX CULVERT)
LF 88.000 $53.000 $68.000 $88.170 $170.000
REMOV STR (PIPE)
EA 4.000 $372.000 $1,075.000 $1,393.870 $2,000.000
MOBILIZATION
LS 1.000 $279,950.240 $260,000.000 $370,567.900 $480,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $4,600.000 $5,300.000 $1,853.920 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 755.000 $50.000 $35.000 $76.240 $41.000
ROCK FILTER DAMS (REMOVE)
LF 755.000 $9.000 $20.000 $18.230 $24.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 726.000 $3.000 $3.500 $7.060 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 726.000 $1.000 $0.750 $2.290 $0.900
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,852.000 $1.000 $0.750 $4.390 $0.900
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 1,852.000 $5.000 $3.500 $1.440 $4.000
CONSTRUCTING DETOURS
SY 343.000 $46.000 $112.000 $65.700 $152.000
DRIVEWAYS (CONC)
SY 119.000 $120.000 $88.000 $97.880 $110.000
DRIVEWAYS (ACP)
SY 3,012.000 $31.000 $67.450 $48.180 $65.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,033.000 $22.000 $27.600 $26.840 $33.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 13.000 $50.000 $74.900 $118.210 $88.000
REMOVE METAL BEAM GUARD FENCE
LF 1,000.000 $2.000 $2.000 $1.720 $2.350
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $2,702.000 $2,275.000 $3,549.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $319.000 $200.000 $215.180 $234.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 14.000 $340.000 $739.000 $215.180 $640.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 77.000 $285.000 $348.000 $474.270 $660.000
REMOVE SM RD SN SUP&AM
EA 63.000 $96.000 $94.000 $90.230 $110.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
EA 15.000 $81.000 $62.000 $67.780 $60.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 15.000 $34.000 $30.000 $30.460 $35.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 14.000 $61.000 $62.000 $81.590 $70.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 154.000 $7.000 $9.000 $9.450 $12.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 170.000 $1.000 $1.000 $1.050 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 75.000 $8.000 $8.000 $8.400 $11.000
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 25,841.000 $0.600 $0.550 $0.570 $0.800
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 512.000 $1.000 $0.550 $0.570 $0.800
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 25,043.000 $0.640 $0.550 $0.570 $0.800
REFL PAV MRKR TY II-A-A
EA 372.000 $4.000 $3.750 $3.930 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 79,384.000 $1.000 $0.420 $0.440 $0.600
ELIM EXT PAV MRK & MRKS (24")
LF 154.000 $4.000 $3.000 $3.150 $4.000
FULL - WIDTH MOWING
CYC 2.000 $3,489.000 $2,500.000 $4,848.570 $3,800.000
LITTER REMOVAL
CYC 2.000 $1,575.000 $1,500.000 $6,254.440 $6,300.000
CLEANING / SWEEPING (SPOT)
MI 10.000 $2,465.000 $900.000 $1,575.000 $1,200.000
TREE TRIMMING / BRUSH REMOVAL
MI 2.480 $25,000.000 $20,000.000 $7,875.000 $12,000.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 2,841.700 $131.000 $93.000 $115.260 $110.000
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 384.100 $71.000 $120.000 $139.440 $150.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 1,647.400 $105.000 $105.000 $127.860 $122.000
BONDING COURSE
GAL 1,203.000 $3.000 $4.400 $4.290 $3.300
UNDERSEAL COURSE
GAL 10,030.000 $4.000 $3.750 $4.290 $3.400
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 360.000 $130.000 $55.000 $106.520 $110.000
TMA (STATIONARY)
DAY 180.000 $286.000 $275.000 $318.250 $235.000
TMA (MOBILE OPERATION)
HR 160.000 $59.000 $75.000 $159.120 $100.000
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 1.000 $504.000 $3,500.000 $5,996.090 $12,000.000
Totals: $3,079,452.600 $3,601,690.880 $4,008,263.101 $4,933,961.300