Show Job Controls
Bid Cobra

HAYS VA (0914-33-097)

Items: 93

County: HAYS
Length: N/A
Highway: VA
District: AUSTIN
Control Number: 0914-33-097
DBE Goal: N/A
Project: STP 2024(149)HES
Guaranty: N/A
Time: 256 WORKING DAYS
Engineer's Estimate: $4,871,540.45
Date: 10/05/2023 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$4,871,540.45
$4,715,509.59
Over/Under Est: -3.2% -$156,030.86
$5,028,074.87
Over/Under Est: 3.21% $156,534.42
Amt Left: 6.63% $312,565.28
Over/Under Est: 22.45% $1,093,698.44
Amt Left: 26.5% $1,249,729.30
Delta: -18.64% -$937,164.02
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 33.89% $1,859,831.41
ENVIRONMENTAL SAFETY SERVICES, INC. 8.69% $476,893.92
TRP CONSTRUCTION GROUP, LLC 2.37% $130,061.98
CAVE TRUCKING, LLC 0.46% $25,244.10
Total: 45.41% $2,492,031.41

Bid Items & Bid Tabulations

93 Total 0 of 93
HAYS  |  VA  |  AUSTIN  |  0914-33-097  |  10/05/2023  |  $4,871,540.45  |  STP 2024(149)HES  |  HAZARD ELIM & SAFETY  |  256 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AARON CONCRETE CONTRACTORS, LLC
DAN WILLIAMS COMPANY
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 116.000 $5,000.000 $1,500.000 $4,250.000 $1,431.900
REMOVING CONC (PAV)
SY 124.000 $30.000 $40.000 $65.000 $38.500
REMOVING CONCRETE(MOW STRIP)
LF 507.000 $12.000 $15.000 $15.000 $14.000
REMOVING STAB BASE & ASPH PAV(15"-16")
SY 2,434.000 $14.000 $28.000 $25.000 $21.000
EXCAVATION (ROADWAY)
CY 3,633.000 $18.000 $28.000 $40.000 $64.900
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 2,764.000 $35.000 $17.000 $40.000 $64.900
EMBANKMENT (FINAL)(ORD COMP)(TY C1)
CY 3,614.000 $45.000 $85.000 $90.000 $72.300
BACKFILL (TY A)
STA 116.000 $250.000 $650.000 $300.000 $345.000
FURNISHING AND PLACING TOPSOIL (4")
SY 34,116.000 $5.000 $2.000 $3.000 $4.600
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 34,116.000 $0.500 $0.800 $0.450 $0.540
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 34,116.000 $1.000 $0.700 $0.350 $0.420
VEGETATIVE WATERING
MG 573.000 $127.000 $35.000 $15.000 $41.400
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 34,116.000 $4.600 $2.500 $2.000 $2.220
PRIME COAT (MULTI OPTION)
GAL 3,253.000 $8.000 $6.200 $5.000 $9.100
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 4,685.000 $85.000 $92.000 $74.000 $121.210
PLANE ASPH CONC PAV (2")
SY 1,532.000 $8.000 $8.600 $7.000 $17.600
CEM STABIL BKFL
CY 15.000 $220.000 $390.000 $300.000 $550.000
FLOWABLE BACKFILL
CY 18.000 $550.000 $261.000 $300.000 $550.000
TRENCH EXCAVATION PROTECTION
LF 300.000 $25.000 $2.000 $1.000 $25.000
TEMPORARY SPL SHORING
SF 129.000 $45.000 $52.000 $14.000 $200.000
RIPRAP (CONC)(5 IN)
CY 8.000 $660.000 $800.000 $1,100.000 $600.000
RIRRAP (STONE COMMON)(DRY)(15 IN)
CY 6.000 $175.000 $640.000 $900.000 $800.000
RIPRAP (MOW STRIP)(4 IN)
CY 30.000 $780.000 $930.000 $810.000 $1,000.000
CMP (GAL STL 18 IN)
LF 28.000 $102.000 $200.000 $160.000 $300.000
CMP (GAL STL 24 IN)
LF 56.000 $145.000 $138.000 $120.000 $325.000
RC PIPE (CL III)(18 IN)
LF 127.000 $88.000 $124.000 $130.000 $400.000
RC PIPE (CL III)(24 IN)
LF 190.000 $130.000 $160.000 $160.000 $450.000
RC PIPE (CL III)(36 IN)
LF 57.000 $215.000 $220.000 $250.000 $500.000
RC PIPE (CL IV)(18 IN)
LF 125.000 $125.000 $137.000 $130.000 $250.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $7,800.000 $4,800.000 $10,000.000 $10,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $11,000.000 $20,000.000 $13,000.000 $25,000.000
SET (TY II) (18 IN) (CMP) (3: 1) (P)
EA 1.000 $2,200.000 $2,200.000 $2,200.000 $2,400.000
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 8.000 $1,800.000 $2,300.000 $2,200.000 $2,500.000
SET (TY II) (24 IN) (CMP) (4: 1) (P)
EA 1.000 $2,500.000 $3,200.000 $2,500.000 $3,200.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $2,000.000 $3,200.000 $2,800.000 $3,600.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 1.000 $2,500.000 $3,200.000 $3,200.000 $7,400.000
CLEAN EXIST CULVERTS
EA 9.000 $3,800.000 $3,600.000 $1,500.000 $2,500.000
REMOV STR (SET)
EA 12.000 $850.000 $800.000 $225.000 $1,500.000
REMOV STR (PIPE)
LF 430.000 $25.000 $54.000 $30.000 $30.000
MOBILIZATION
LS 1.000 $423,299.000 $430,000.000 $500,000.000 $584,485.510
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $12,000.000 $2,000.000 $30,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 169.000 $50.000 $62.000 $47.500 $57.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 254.000 $62.000 $80.000 $65.000 $78.000
ROCK FILTER DAMS (REMOVE)
LF 423.000 $20.000 $23.000 $22.500 $27.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 2,464.000 $22.000 $63.000 $21.500 $25.800
CONSTRUCTION EXITS (REMOVE)
SY 2,464.000 $10.000 $24.000 $13.500 $16.200
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,224.000 $4.000 $6.400 $3.750 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,224.000 $0.750 $2.300 $0.650 $0.780
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 90.000 $7.000 $6.400 $7.500 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 90.000 $1.500 $3.200 $1.000 $1.200
DRIVEWAYS (CONC)
SY 59.000 $110.000 $150.000 $130.000 $150.000
DRIVEWAYS (ACP)
SY 492.000 $100.000 $115.920 $125.000 $77.400
MTL W-BEAM GD FEN (TIM POST)
LF 138.000 $28.000 $35.000 $40.000 $33.090
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,500.000 $1,800.000 $3,000.000 $1,641.370
REMOVE METAL BEAM GUARD FENCE
LF 302.000 $4.000 $7.300 $13.000 $3.780
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,275.000 $4,600.000 $4,000.000 $4,061.830
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $275.000 $534.000 $1,300.000 $547.120
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 4.000 $350.000 $750.000 $620.000 $389.540
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 35.000 $785.000 $1,380.000 $1,150.000 $835.810
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $950.000 $1,490.000 $1,250.000 $1,017.350
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,450.000 $2,315.000 $1,950.000 $1,490.100
REMOVE SM RD SN SUP&AM
EA 9.000 $125.000 $176.000 $150.000 $136.150
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $45.000 $47.000 $39.000 $73.120
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 16.000 $85.000 $115.000 $95.000 $162.620
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 14,166.000 $0.500 $0.600 $0.500 $0.600
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 7,592.000 $0.500 $0.600 $0.500 $0.600
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,146.000 $1.400 $1.200 $1.000 $1.200
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 2,284.000 $2.000 $1.000 $2.000 $1.630
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 140.000 $5.000 $2.500 $2.000 $2.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,766.000 $1.400 $1.200 $1.000 $1.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 154.000 $16.000 $10.000 $8.000 $9.600
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 34.000 $210.000 $213.000 $175.000 $210.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 26.000 $210.000 $335.000 $275.000 $330.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 22,625.000 $0.750 $0.750 $0.610 $0.730
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 2,833.000 $0.850 $0.750 $0.610 $0.730
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 41,439.000 $0.750 $0.750 $0.610 $0.730
REFL PAV MRKR TY I-C
EA 192.000 $5.000 $4.900 $4.000 $4.800
REFL PAV MRKR TY II-A-A
EA 2,092.000 $5.000 $4.900 $4.000 $4.800
ELIM EXT PAV MRK & MRKS (4")
LF 21,758.000 $0.750 $1.000 $0.850 $1.020
FULL - WIDTH MOWING
CYC 2.000 $3,500.000 $980.000 $1,000.000 $12,500.000
LITTER REMOVAL
CYC 2.000 $3,000.000 $4,200.000 $550.000 $3,500.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 3,915.000 $145.000 $172.000 $155.000 $214.500
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 271.000 $155.000 $308.000 $260.000 $231.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 1,559.000 $265.000 $204.000 $180.000 $231.000
PFC-C PG76-22 SAC-A
TON 415.000 $222.500 $248.000 $215.000 $286.000
TOM-C PG76-22 SAC-B
TON 2,302.000 $175.000 $200.000 $200.000 $253.000
BONDING COURSE
GAL 4,970.000 $9.000 $6.000 $4.750 $6.700
UNDERSEAL COURSE
GAL 1,229.000 $5.000 $6.800 $5.500 $10.100
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $10,000.000 $20,000.000 $15,000.000
TMA (STATIONARY)
DAY 604.000 $250.000 $300.000 $145.000 $600.000
TMA (MOBILE OPERATION)
HR 104.000 $100.000 $22.000 $80.000 $175.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 10.000 $1,500.000 $870.000 $1,000.000 $7,500.000
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 5.000 $2,700.000 $1,500.000 $1,500.000 $10,000.000
Totals: $4,871,540.450 $4,715,509.590 $5,028,074.870 $5,965,238.890