Show Job Controls
Bid Cobra

HAYS RM 12 (0683-03-044)

Items: 53

County: HAYS
Length: N/A
Highway: RM 12
District: AUSTIN
Control Number: 0683-03-044
DBE Goal: N/A
Project: F 2023(961)
Guaranty: N/A
Time: 96 WORKING DAYS
Engineer's Estimate: $5,173,217.30
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$5,173,217.30
$5,424,333.45
Over/Under Est: 4.85% $251,116.15
Over/Under Est: 16.42% $849,566.36
Amt Left: 11.03% $598,450.21
Over/Under Est: 22.84% $1,181,751.19
Amt Left: 17.16% $930,635.04
Delta: -5.52% -$332,184.83

Bid Items & Bid Tabulations

53 Total 0 of 53
HAYS  |  RM 12  |  AUSTIN  |  0683-03-044  |  05/05/2023  |  $5,173,217.30  |  F 2023(961)  |  RESURF ROADWAY  |  96 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONE STAR PAVING COMPANY
CLARK CONSTRUCTION OF TEXAS, INC.
HUNTER INDUSTRIES, LTD.
BACKFILL (TY A)
STA 621.000 $150.000 $225.000 $129.570 $209.000
SPEC EXCAV WORK (BACKHOE)
HR 32.000 $240.000 $100.000 $105.000 $240.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 9,824.000 $42.000 $86.000 $89.940 $90.190
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 22,934.000 $38.000 $32.000 $39.040 $40.270
PLANE ASPH CONC PAV(0" TO 1")
SY 489.000 $3.800 $11.750 $2.980 $7.080
PLANE ASPH CONC PAV(0" TO 4")
SY 2,667.000 $4.000 $2.750 $9.340 $4.880
PLANE ASPH CONC PAV (1")
SY 218,090.000 $1.800 $1.250 $2.980 $1.910
PLANE ASPH CONC PAV (4")
SY 654.000 $4.250 $10.750 $9.340 $7.080
PLANE ASPH CONC PAV (0" TO 5")
SY 6,668.000 $4.750 $2.550 $8.870 $9.280
PLANE ASPH CONC PAV (5")
SY 772.000 $4.750 $22.250 $8.870 $9.280
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 486.000 $40.000 $45.000 $42.220 $45.600
RETROFIT RAIL (TY T631)
LF 445.000 $180.000 $125.000 $185.000 $93.890
MOBILIZATION
LS 1.000 $300,000.000 $155,850.000 $300,000.000 $477,643.260
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $15,000.000 $1,900.000 $4,745.150
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 100.000 $5.000 $4.750 $8.000 $6.480
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.500 $1.850 $3.000 $2.160
ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG)
DAY 16.000 $250.000 $300.000 $300.000 $397.550
RUMBLE STRIPS (CENTERLINE)
LF 51,750.000 $0.200 $0.270 $0.150 $0.190
MTL W-BEAM GD FEN ADJUSTMENT
LF 1,450.000 $95.000 $19.750 $21.000 $15.510
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $400.000 $310.000 $300.000 $286.440
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $250.000 $255.000 $500.000 $94.880
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,110.000 $3,600.000 $3,593.490
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 14.000 $1,200.000 $875.000 $1,800.000 $907.340
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 60.000 $35.000 $25.750 $45.000 $44.390
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 3,713.000 $0.300 $0.260 $0.150 $0.160
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 279,450.000 $0.300 $0.260 $0.150 $0.160
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,273.000 $0.600 $0.350 $0.250 $0.270
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 342.000 $5.000 $3.500 $2.000 $2.160
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 1,515.000 $0.300 $0.260 $0.150 $0.160
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 271,654.000 $0.300 $0.260 $0.150 $0.160
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 625.000 $1.500 $1.030 $1.070 $1.780
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 6,875.000 $1.500 $1.030 $1.070 $1.780
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 7,500.000 $1.500 $1.030 $1.650 $2.160
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 7,500.000 $1.500 $1.030 $1.650 $2.160
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 14.000 $2.000 $2.580 $5.000 $5.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,010.000 $1.150 $1.650 $1.500 $1.620
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 152.000 $10.000 $11.080 $10.000 $10.800
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 6.000 $215.000 $283.270 $200.000 $216.030
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 1.000 $240.000 $385.260 $300.000 $324.050
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 6.000 $215.000 $283.270 $225.000 $243.040
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 2.000 $300.000 $535.640 $450.000 $486.070
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,650.000 $0.650 $1.090 $0.450 $0.490
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 124,200.000 $0.800 $1.090 $0.850 $0.920
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 673.000 $0.900 $1.090 $0.850 $0.920
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 120,735.000 $0.900 $1.090 $0.850 $0.920
REFL PAV MRKR TY II-A-A
EA 3,515.000 $5.000 $5.360 $5.000 $5.400
TRAFFIC BUTTON TY I-C
EA 225.000 $5.000 $5.360 $5.000 $5.400
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 2,839.000 $110.000 $130.000 $168.260 $143.500
TOM-C PG76-22 SAC-B
TON 13,155.000 $130.000 $142.000 $137.550 $162.000
UNDERSEAL COURSE
GAL 46,565.000 $3.800 $4.000 $4.050 $4.640
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 212.000 $100.000 $62.000 $77.000 $108.020
TMA (STATIONARY)
DAY 192.000 $200.000 $345.000 $175.000 $292.320
TMA (MOBILE OPERATION)
HR 160.000 $200.000 $45.000 $200.000 $233.850
Totals: $5,173,217.300 $5,424,333.450 $6,022,783.660 $6,354,968.490