Show Job Controls
Bid Cobra

HAYS US 290 (0113-07-072)

Items: 104

County: HAYS
Length: N/A
Highway: US 290
District: AUSTIN
Control Number: 0113-07-072
DBE Goal: N/A
Project: F 2023(988)
Guaranty: N/A
Time: 141 WORKING DAYS
Engineer's Estimate: $1,344,607.90
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,344,607.90
$1,960,789.39
Over/Under Est: 45.83% $616,181.49
Over/Under Est: 66.76% $897,593.81
Amt Left: 14.35% $281,412.32
Over/Under Est: 75.04% $1,008,958.50
Amt Left: 20.03% $392,777.01
Delta: -4.97% -$111,364.69
Over/Under Est: 120.87% $1,625,232.00
Amt Left: 51.46% $1,009,050.51
Delta: -26.18% -$616,273.50
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 23.14% $453,726.66
SLATON BROS, INC. 14.73% $288,824.28
ZENITH SITE SERVICES 13.88% $272,157.57
ROADWAY SPECIALTIES, INC. 4.19% $82,157.08
KING GEORGE TRAFFIC SOLUTIONS LLC 1.89% $37,058.92
ENVIRONMENTAL SAFETY SERVICES, INC. 1.06% $20,784.37
FIBERTEL, LLC 0.94% $18,431.42
BARRICADES UNLIMITED 0.44% $8,627.47
ALAMO CRANE SERVICE, INC. 0.31% $6,078.45
STOCKLIN CO. 0.24% $4,705.89
MB PRIME LLC 0.17% $3,333.34
BUYERS BARRICADES AUSTIN, LLC 0.17% $3,333.34
LLANO AUGER SERVICE 0.05% $980.39
Total: 61.21% $1,200,199.18

Bid Items & Bid Tabulations

104 Total 0 of 104
HAYS  |  US 290  |  AUSTIN  |  0113-07-072  |  06/28/2023  |  $1,344,607.90  |  F 2023(988)  |  INTERS IMPRV  |  141 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E-Z BEL CONSTRUCTION, LLC
HUNTER INDUSTRIES, LTD.
AARON CONCRETE CONTRACTORS, LLC
AUSTIN UNDERGROUND INCORPORATED
PREPARING ROW
STA 15.000 $3,000.000 $2,500.000 $9,400.000 $5,000.000 $7,500.000
REMOVING CONC (RIPRAP)
SY 106.000 $25.000 $45.000 $38.700 $61.000 $54.000
REMOVING CONC (CURB AND GUTTER)
LF 38.000 $20.000 $65.000 $38.700 $32.000 $61.000
REMOVING CONCRETE(MOW STRIP)
LF 188.000 $10.000 $21.000 $38.700 $57.000 $14.000
REMOVING STAB BASE & ASPH PAV (8"-14")
SY 2,210.000 $5.000 $7.000 $15.300 $10.000 $30.000
EXCAVATION (ROADWAY)
CY 4,721.000 $35.000 $30.000 $38.500 $55.000 $80.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 488.000 $30.000 $20.000 $38.500 $15.000 $100.000
FURNISHING AND PLACING TOPSOIL (4")
SY 3,518.000 $1.500 $4.000 $3.400 $4.000 $10.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 3,518.000 $0.300 $0.250 $0.250 $0.300 $0.400
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 3,518.000 $0.300 $0.220 $0.220 $0.300 $0.400
FERTILIZER
TON 0.220 $1,000.000 $1,500.000 $2,386.000 $3,100.000 $3,900.000
VEGETATIVE WATERING
MG 106.000 $20.000 $226.250 $31.500 $35.000 $100.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 3,518.000 $1.350 $1.300 $1.300 $1.700 $2.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 1,319.000 $60.000 $78.000 $93.710 $125.000 $150.000
PRIME COAT (MULTI OPTION)
GAL 678.000 $4.500 $3.750 $9.100 $5.000 $4.500
PLAN & TEXT ASPH CONC PAV(0" TO 3")
SY 3,335.000 $2.500 $11.500 $5.980 $15.000 $13.750
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 12.000 $480.000 $662.000 $395.000 $490.000 $487.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 14.000 $500.000 $642.000 $410.000 $508.000 $505.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $540.000 $725.000 $510.000 $630.000 $630.000
RETAINING WALL (CONC BLOCK)
SF 4,151.000 $40.000 $67.000 $79.750 $86.000 $130.000
RIPRAP (CONC)(5 IN)
CY 60.000 $500.000 $1,149.000 $720.000 $825.000 $900.000
RIPRAP (CONC)(FLUME)
CY 24.600 $500.000 $1,399.000 $1,400.000 $850.000 $2,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 2.900 $500.000 $1,350.000 $1,100.000 $2,200.000 $2,200.000
RAIL (TY PR1)
LF 515.000 $30.000 $142.000 $165.000 $167.000 $250.000
SLOT DRAIN (GAL STL) (12 IN)
LF 60.000 $40.000 $547.000 $207.900 $370.000 $680.000
REMOV STR (PIPE)
LF 365.000 $30.000 $140.000 $26.500 $54.000 $25.000
MOBILIZATION
LS 1.000 $80,220.000 $34,662.000 $238,300.820 $230,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $6,900.000 $2,800.000 $5,172.370 $1,400.000 $9,800.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 100.000 $20.000 $5.000 $5.000 $6.500 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $7.500 $1.000 $1.000 $1.300 $1.600
DRIVEWAYS (ACP)
SY 247.000 $60.000 $65.000 $69.000 $160.000 $560.000
MTL W-BEAM GD FEN (TIM POST)
LF 188.000 $30.000 $26.000 $26.000 $31.000 $40.000
REMOVE METAL BEAM GUARD FENCE
LF 163.000 $5.000 $5.000 $5.000 $6.000 $6.750
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $300.000 $577.000 $578.000 $680.000 $210.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 1.000 $2,750.000 $3,208.000 $3,209.000 $3,800.000 $6,200.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 2.000 $400.000 $378.000 $295.000 $530.000 $470.000
CONDT (PVC) (SCH 80) (2")
LF 75.000 $20.500 $41.000 $22.250 $28.000 $27.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 335.000 $45.000 $33.000 $37.850 $47.000 $46.000
CONDT (PVC) (SCH 80) (3")
LF 840.000 $24.500 $52.000 $23.900 $30.000 $29.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 380.000 $46.000 $48.000 $47.900 $60.000 $58.000
ELEC CONDR (NO.8) BARE
LF 1,550.000 $1.600 $3.000 $1.450 $1.800 $1.800
ELEC CONDR (NO.8) INSULATED
LF 1,800.000 $1.750 $3.500 $1.600 $2.000 $1.950
ELEC CONDR (NO.6) BARE
LF 85.000 $2.250 $3.750 $1.900 $2.400 $2.300
ELEC CONDR (NO.6) INSULATED
LF 170.000 $2.300 $4.000 $2.050 $2.500 $2.500
GROUND BOX TY D (162922)
EA 3.000 $1,500.000 $2,513.000 $1,825.000 $2,300.000 $2,300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000 $590.000 $699.500 $700.000 $1,000.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $770.000 $1,064.000 $1,064.000 $1,100.000 $1,700.000
REMOVE SM RD SN SUP&AM
EA 6.000 $325.000 $110.000 $110.000 $206.000 $175.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 398.000 $0.750 $0.750 $2.050 $2.400 $0.300
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,590.000 $0.750 $0.750 $2.050 $2.400 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 1,526.000 $0.450 $0.750 $2.050 $2.400 $0.300
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 1,590.000 $3.000 $3.000 $5.000 $1.200 $4.100
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 1,590.000 $3.000 $3.000 $5.000 $2.400 $4.650
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 76.000 $1.500 $1.750 $1.060 $1.300 $1.650
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 862.000 $1.500 $1.750 $1.060 $1.300 $1.200
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 96.000 $9.000 $11.000 $10.060 $12.000 $10.500
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 4.000 $200.000 $165.000 $250.000 $295.000 $191.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 4.000 $250.000 $175.000 $340.000 $400.000 $225.000
REFL PAV MRK TY I (W)(BIKE ARW)(090MIL)
EA 2.000 $125.000 $140.000 $340.000 $400.000 $167.000
REFL PAV MRK TY I(W)(BIKE SYML)(090MIL)
EA 2.000 $275.000 $140.000 $340.000 $400.000 $204.000
REFL PAV MRK TY II (W) 6" (BRK)
LF 199.000 $0.250 $0.770 $0.430 $0.500 $0.500
REFL PAV MRK TY II (W) 6" (SLD)
LF 3,071.000 $0.250 $0.770 $0.430 $0.500 $0.400
REFL PAV MRK TY II (W) 8" (DOT)
LF 76.000 $0.500 $0.890 $0.520 $0.600 $1.050
REFL PAV MRK TY II (W) 8" (SLD)
LF 862.000 $0.750 $0.890 $0.520 $0.600 $1.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 96.000 $5.000 $4.000 $3.040 $3.600 $5.600
REFL PAV MRK TY II (W) (ARROW)
EA 4.000 $150.000 $75.000 $52.000 $61.000 $86.000
REFL PAV MRK TY II (W) (WORD)
EA 4.000 $200.000 $85.000 $52.000 $61.000 $103.000
REFL PAV MRK TY II (W) (BIKE ARROW)
EA 2.000 $50.000 $55.000 $52.000 $61.000 $103.000
REFL PAV MRK TY II (W) (BIKE SYMBOL)
EA 2.000 $75.000 $65.000 $52.000 $61.000 $91.000
REFL PAV MRK TY II (Y) 6" (BRK)
LF 102.000 $0.200 $0.770 $0.430 $0.500 $0.350
REFL PAV MRK TY II (Y) 6" (SLD)
LF 2,046.000 $0.200 $0.770 $0.430 $0.500 $0.400
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 199.000 $0.500 $1.050 $1.060 $1.200 $1.150
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 3,071.000 $0.500 $1.050 $1.060 $1.200 $1.150
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 102.000 $0.500 $1.050 $1.060 $1.200 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 4,092.000 $0.500 $1.050 $1.060 $1.200 $1.450
REFL PAV MRKR TY I-C
EA 62.000 $10.000 $8.000 $7.000 $8.200 $8.500
REFL PAV MRKR TY II-A-A
EA 40.000 $10.000 $8.000 $7.000 $8.200 $11.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $15,000.000 $10,400.000 $9,500.000 $11,800.000 $11,600.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $5,000.000 $10,908.000 $3,750.000 $4,650.000 $4,600.000
VEH SIG SEC (12")LED(GRN)
EA 12.000 $300.000 $674.000 $325.000 $402.000 $398.000
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $300.000 $674.000 $325.000 $402.000 $398.000
VEH SIG SEC (12")LED(YEL)
EA 12.000 $300.000 $674.000 $325.000 $402.000 $398.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $300.000 $674.000 $325.000 $402.000 $398.000
VEH SIG SEC (12")LED(RED)
EA 12.000 $300.000 $674.000 $325.000 $402.000 $398.000
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $300.000 $674.000 $325.000 $402.000 $398.000
BACKPLATE W/REFL BRDR(4 SEC)
EA 2.000 $175.000 $370.000 $175.000 $217.000 $214.000
BACKPLATE W/REFL BRDR(3 SEC)
EA 12.000 $150.000 $320.000 $165.000 $205.000 $201.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 2,415.000 $2.750 $4.500 $1.900 $2.400 $2.300
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 440.000 $3.400 $4.600 $2.050 $2.500 $2.500
INS TRF SIG PL AM(S)1 ARM(24')LUM
EA 1.000 $10,000.000 $23,424.000 $11,925.000 $14,800.000 $14,500.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $15,000.000 $30,805.000 $14,475.000 $17,900.000 $17,500.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 2.000 $37,500.000 $80,425.000 $35,785.000 $44,300.000 $44,000.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 260.000 $100.000 $160.000 $202.400 $209.000 $202.000
D-GR HMA TY-B PG64-22 (LEVEL-UP)
TON 866.000 $125.000 $115.000 $202.400 $158.000 $159.000
D-GR HMA TY-C PG76-22
TON 272.000 $100.000 $170.000 $213.400 $235.000 $198.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 574.000 $105.000 $160.000 $213.400 $215.000 $186.000
PFC-C PG76-22 SAC-A
TON 297.000 $150.000 $225.000 $262.900 $305.000 $262.000
BONDING COURSE
GAL 1,039.000 $3.000 $4.000 $4.640 $5.200 $4.600
UNDERSEAL COURSE
GAL 418.000 $4.500 $4.000 $10.300 $5.200 $4.600
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 200.000 $170.000 $125.000 $108.250 $72.000 $120.000
TMA (STATIONARY)
DAY 20.000 $230.000 $583.000 $324.750 $573.000 $290.000
TMA (MOBILE OPERATION)
HR 160.000 $57.000 $130.000 $162.370 $100.000 $110.000
RVDS(PRESENCE DETECTION ONLY)
EA 2.000 $500.000 $15,503.000 $6,200.000 $7,700.000 $7,600.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 5.000 $1,000.000 $5,116.000 $4,000.000 $1,400.000 $4,300.000
Totals: $1,344,607.900 $1,960,789.390 $2,242,201.710 $2,353,566.400 $2,969,839.900