Show Job Controls
Bid Cobra

HASKELL FM 600 (0972-06-015)

Items: 50

County: HASKELL
Length: N/A
Highway: FM 600
District: ABILENE
Control Number: 0972-06-015
DBE Goal: N/A
Project: F 2023(915)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $2,994,754.65
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
STEWART CHAPMAN
MAXIE ALLEN
JOSE CABRERA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,994,754.65
$2,844,984.65
Over/Under Est: -5% -$149,770.00
$2,979,096.11
Over/Under Est: -0.52% -$15,658.54
Amt Left: 4.71% $134,111.46
Over/Under Est: 6.14% $183,839.01
Amt Left: 11.73% $333,609.01
Delta: -6.70% -$199,497.55
$3,698,727.65
Over/Under Est: 23.51% $703,973.00
Amt Left: 30.01% $853,743.00
Delta: -16.36% -$520,133.99
Subcontractor Percentage Amount
W. S. CONSTRUCTION COMPANY 8.49% $241,539.20
MURRAY CONSTRUCTION 1.77% $50,356.23
FLAT LINE, INC. 1.52% $43,243.77
WEST TEXAS ROCK RESOURCES, LLC 0.81% $23,044.38
BARRICADES UNLIMITED 0.69% $19,630.39
WEST TEXAS BARRICADE AND LIGHT CO. 0.69% $19,630.39
Total: 13.97% $397,444.36

Bid Items & Bid Tabulations

50 Total 0 of 50
HASKELL  |  FM 600  |  ABILENE  |  0972-06-015  |  06/01/2023  |  $2,994,754.65  |  F 2023(915)  |  WIDEN ROAD - ADD SHOULDERS  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
DUININCK, INC.
BLACKSMITH VENTURES LLC
CK NEWBERRY, LLC
EXCAVATION (CHANNEL)
CY 200.000 $20.000 $55.000 $39.000 $100.000 $125.000
SUBGRADE WIDENING (ORD COMP)
STA 236.000 $275.000 $460.000 $350.000 $1,100.000 $400.000
BACKFILL (TY B)
STA 236.000 $200.000 $178.000 $74.000 $100.000 $225.000
PRIME COAT (AE-P)
GAL 2,620.000 $5.000 $8.000 $8.500 $8.000 $10.000
ASPH (MULTI OPTION)
GAL 8,267.000 $6.500 $5.500 $7.150 $8.000 $6.000
AGGR(TY-B GR-3 SAC-B)
CY 166.000 $130.000 $220.000 $315.000 $120.000 $275.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 1,225.000 $50.000 $63.000 $49.500 $50.000 $65.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,525.000 $4.000 $5.300 $6.950 $7.000 $4.000
CMP (GAL STL 24 IN)
LF 8.000 $80.000 $540.000 $120.000 $150.000 $150.000
CMP AR (GAL STL DES 4)
LF 1.000 $500.000 $1,100.000 $155.000 $300.000 $200.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 4.000 $600.000 $2,300.000 $935.000 $1,500.000 $1,200.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 9.000 $650.000 $1,100.000 $1,000.000 $1,500.000 $1,300.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 2.000 $900.000 $4,400.000 $1,900.000 $1,500.000 $2,500.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $9,000.000 $21,000.000 $18,500.000 $18,000.000 $25,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 6.000 $5,000.000 $7,500.000 $9,600.000 $9,000.000 $12,000.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $13,000.000 $22,000.000 $17,500.000 $16,500.000 $22,000.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 10.000 $1,000.000 $1,200.000 $2,400.000 $3,500.000 $3,000.000
SET (TY II) (30 IN) (CMP) (4: 1) (C)
EA 2.000 $3,000.000 $3,300.000 $3,300.000 $3,500.000 $4,000.000
SET (TY II) (DES 4) (CMP) (4: 1) (C)
EA 4.000 $4,500.000 $2,900.000 $4,200.000 $3,500.000 $5,000.000
SET (TY II) (DES 4) (CMP) (6: 1) (P)
EA 8.000 $3,000.000 $4,900.000 $5,600.000 $5,000.000 $6,500.000
SET (TY II) (DES 5) (CMP) (4: 1) (C)
EA 2.000 $5,000.000 $6,000.000 $7,100.000 $2,500.000 $8,500.000
CLEAN EXIST CULVERTS
EA 8.000 $2,500.000 $1,100.000 $2,700.000 $1,000.000 $3,000.000
REMOV STR (WINGWALL)
EA 8.000 $1,200.000 $850.000 $1,600.000 $3,000.000 $2,500.000
MOBILIZATION
LS 1.000 $267,160.000 $250,000.000 $300,000.000 $100,000.000 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,000.000 $8,000.000 $19,000.000 $3,000.000 $10,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 325.000 $9.000 $11.000 $14.000 $9.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 325.000 $3.000 $6.000 $4.300 $2.000 $5.000
RUMBLE STRIPS (SHOULDER)
LF 46,653.000 $0.250 $0.300 $0.140 $0.200 $0.250
RUMBLE STRIPS (CENTERLINE)
LF 23,578.000 $0.250 $0.450 $0.200 $0.220 $0.300
WIRE FENCE (TY A)
LF 50.000 $50.000 $42.000 $80.500 $25.000 $60.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 60.000 $650.000 $690.000 $670.000 $600.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $650.000 $750.000 $725.000 $750.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $1,000.000 $780.000 $750.000 $750.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,100.000 $900.000 $855.000 $1,000.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $700.000 $1,000.000 $965.000 $1,000.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 38.000 $115.000 $90.000 $80.500 $90.000 $200.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 24.000 $90.000 $78.000 $75.000 $45.000 $100.000
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 40.000 $75.000 $17.000 $16.000 $28.000 $75.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,526.000 $1.000 $0.850 $1.400 $1.000 $2.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 46,653.000 $0.700 $0.550 $0.520 $0.700 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 2,530.000 $0.800 $0.550 $0.520 $0.750 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 31,984.000 $0.700 $0.550 $0.520 $0.700 $1.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 15.000 $35.000 $28.000 $27.000 $20.000 $60.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 12.000 $50.000 $28.000 $27.000 $75.000 $125.000
REFL PAV MRKR TY II-A-A
EA 501.000 $4.500 $4.700 $4.550 $9.000 $8.000
D-GR HMA TY-B PG64-22
TON 4,755.000 $140.000 $128.000 $130.000 $160.500 $175.000
SP MIXES SP-C SAC-B PG70-22
TON 8,278.000 $155.000 $135.000 $135.000 $155.000 $170.000
TACK COAT
GAL 9,142.000 $8.000 $4.000 $3.250 $7.000 $6.000
TMA (STATIONARY)
DAY 133.000 $300.000 $150.000 $215.000 $200.000 $350.000
TMA (MOBILE OPERATION)
DAY 18.000 $300.000 $65.000 $1,100.000 $900.000 $100.000
Totals: $2,994,754.650 $2,844,984.650 $2,979,096.110 $3,178,593.660 $3,698,727.650