Show Job Controls
Bid Cobra

HARRISON IH 20 (0495-08-121)

Items: 63

County: HARRISON
Length: N/A
Highway: IH 20
District: ATLANTA
Control Number: 0495-08-121
DBE Goal: N/A
Project: BR 2021(433)
Guaranty: N/A
Time: 146 WORKING DAYS
Engineer's Estimate: $695,253.60
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$695,253.60
$639,848.46
Over/Under Est: -7.97% -$55,405.14
Over/Under Est: 23.19% $161,233.40
Amt Left: 33.86% $216,638.54
Over/Under Est: 39.88% $277,234.80
Amt Left: 51.99% $332,639.94
Delta: -13.54% -$116,001.40
Over/Under Est: 43.7% $303,860.40
Amt Left: 56.15% $359,265.54
Delta: -2.74% -$26,625.60
Over/Under Est: 47.94% $333,321.40
Amt Left: 60.75% $388,726.54
Delta: -2.95% -$29,461.00

Bid Items & Bid Tabulations

63 Total 0 of 63
HARRISON  |  IH 20  |  ATLANTA  |  0495-08-121  |  02/04/2022  |  $695,253.60  |  BR 2021(433)  |  BRIDGE MAINT  |  146 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
R & G CONSTRUCTION, LLC
HIGHWAY 19 CONSTRUCTION LLC
SCR CIVIL CONSTRUCTION, LLC
EAST TEXAS BRIDGE, INC.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
REMOVING CONC (RIPRAP)
SY 22.000 $20.000 $17.000 $25.000 $200.000 $50.000 $150.000
REMOVE CONC (MISC)
EA 2.000 $1,000.000 $2,200.000 $500.000 $9,100.000 $2,000.000 $2,500.000
REMOVING STAB BASE & ASPH PAV(13"-18")
SY 166.000 $12.000 $19.000 $15.000 $206.000 $50.000 $200.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 467.000 $18.000 $18.000 $30.000 $62.000 $50.000 $200.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 1,423.000 $1.000 $0.570 $1.000 $1.150 $2.000 $4.000
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 1,423.000 $0.200 $0.600 $1.000 $1.150 $2.000 $4.000
VEGETATIVE WATERING
MG 46.000 $20.000 $15.000 $10.000 $100.000 $50.000 $30.000
CEM STABIL BKFL
CY 28.000 $155.000 $261.000 $180.000 $465.000 $500.000 $600.000
FLOWABLE BACKFILL
CY 11.000 $245.000 $285.000 $250.000 $455.000 $700.000 $500.000
APPROACH SLAB (HPC)
CY 62.000 $640.000 $845.000 $850.000 $1,050.000 $900.000 $750.000
EPOXY WATERPROOF FINISH
SF 630.000 $8.000 $24.000 $36.000 $23.000 $22.000 $25.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 1,199.000 $50.000 $19.700 $25.000 $19.000 $20.000 $10.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 3.000 $1,000.000 $800.000 $1,500.000 $1,000.000 $2,000.000 $250.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 169.000 $220.000 $137.250 $350.000 $215.000 $300.000 $350.000
CONC STR REPAIR (PAN GIRDER HOLE REPR)
EA 32.000 $200.000 $125.000 $250.000 $110.000 $150.000 $200.000
RIPRAP (CONC)(5 IN)
CY 22.000 $450.000 $460.000 $650.000 $1,055.000 $700.000 $600.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 50.000 $150.000 $128.000 $250.000 $325.000 $400.000 $400.000
BEDDING MATERIAL (6 IN)
CY 13.000 $200.000 $110.000 $180.000 $930.000 $400.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 48.000 $450.000 $430.000 $550.000 $821.000 $650.000 $600.000
CLEANING AND SEALING EXISTING JOINTS
LF 373.000 $30.000 $23.000 $51.000 $40.000 $45.000 $33.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 610.000 $40.000 $22.000 $55.000 $25.000 $45.000 $30.000
CLEANING EXISTING JOINTS
LF 533.000 $25.000 $17.000 $35.000 $10.000 $30.000 $17.000
RETROFIT RAIL (TY T131RC)
LF 357.000 $190.000 $205.000 $250.000 $336.000 $220.000 $400.000
ARMOR JOINT
LF 51.000 $80.000 $110.000 $180.000 $200.000 $300.000 $300.000
HEADER TYPE EXPANSION JOINT
CF 157.000 $460.000 $340.000 $350.000 $500.000 $500.000 $400.000
JOINT SEALANT
LF 773.000 $20.000 $16.000 $25.000 $10.000 $25.000 $25.000
MOBILIZATION
LS 1.000 $63,180.000 $62,000.000 $120,000.000 $96,700.000 $95,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $4,000.000 $4,800.000 $5,000.000 $4,400.000 $12,000.000 $7,500.000
CONSTRUCTION EXITS (INSTALL) (TY 3)
SY 468.000 $35.000 $22.000 $35.000 $67.000 $40.000 $20.000
CONSTRUCTION EXITS (REMOVE)
SY 468.000 $9.000 $10.000 $10.000 $22.350 $10.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,700.000 $3.000 $2.450 $3.000 $3.350 $4.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,700.000 $2.000 $1.000 $1.000 $1.150 $1.000 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 3.000 $6,000.000 $4,700.000 $7,000.000 $2,500.000 $10,000.000 $4,000.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 220.000 $35.000 $75.000 $25.000 $110.000 $100.000 $35.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $40.000 $85.000 $95.000 $110.000 $100.000 $40.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 220.000 $5.000 $5.000 $10.000 $20.000 $20.000 $10.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $10.000 $5.000 $10.000 $20.000 $20.000 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 220.000 $15.000 $12.000 $25.000 $75.000 $10.000 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $15.000 $12.000 $25.000 $75.000 $10.000 $10.000
MTL W-BEAM GD FEN (TIM POST)
LF 700.000 $25.000 $27.500 $30.000 $29.400 $30.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,800.000 $2,000.000 $2,800.000 $2,180.000 $2,000.000 $3,000.000
REMOVE METAL BEAM GUARD FENCE
LF 800.000 $4.000 $2.500 $2.000 $2.250 $3.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,300.000 $3,000.000 $3,375.000 $3,500.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $350.000 $300.000 $250.000 $224.000 $250.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $25.000 $18.000 $35.000 $38.000 $30.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 14.000 $30.000 $40.000 $35.000 $43.600 $50.000 $25.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 90.000 $4.000 $11.000 $2.000 $11.100 $11.000 $11.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 192.000 $4.000 $11.000 $2.000 $11.100 $11.000 $11.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 270.000 $3.000 $11.000 $2.000 $11.100 $11.000 $11.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 576.000 $4.000 $11.000 $2.000 $11.100 $11.000 $11.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $22.000 $11.000 $10.000 $11.100 $11.000 $11.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 329.000 $1.000 $5.000 $2.000 $4.000 $6.000 $11.000
PAVEMENT SEALER 4"
LF 3,380.000 $0.500 $0.550 $1.000 $0.560 $0.600 $1.000
REFL PAV MRKR TY II-A-A
EA 49.000 $3.000 $11.000 $1.000 $11.100 $11.000 $11.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,780.000 $0.500 $1.650 $1.000 $1.700 $1.750 $2.000
PAV SURF PREP FOR MRK (4")
LF 3,380.000 $0.500 $0.550 $1.000 $0.560 $0.600 $2.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 14.000 $25.000 $200.000 $50.000 $45.000 $250.000 $110.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 280.000 $120.000 $85.000 $100.000 $75.000 $150.000 $125.000
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
LF 600.000 $0.500 $1.100 $1.000 $1.120 $1.200 $1.000
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
LF 2,010.000 $0.500 $1.100 $2.000 $1.120 $1.200 $1.000
REFL PAV MRK AWT (Y) 4" (BRK) (100MIL)
LF 770.000 $0.500 $1.100 $2.000 $1.120 $1.200 $1.000
TMA (STATIONARY)
DAY 58.000 $200.000 $80.000 $250.000 $350.000 $400.000 $200.000
TMA (MOBILE OPERATION)
HR 20.000 $65.000 $100.000 $50.000 $100.000 $50.000 $10.000
Totals: $695,253.600 $639,848.460 $856,487.000 $972,488.400 $999,114.000 $1,028,575.000